Manual Mecmar mobiltork - Andersson & Henriksson
Manual Mecmar mobiltork - Andersson & Henriksson
Manual Mecmar mobiltork - Andersson & Henriksson
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Montering efter transport<br />
L) Install the screens (10-Fig. 9): 10.1-10.2-10.3.<br />
The first screen has lower grooves that coincide with the arms of the frame. The<br />
second screen has a starting and ending bevel. The following screen is marked "3<br />
ALTA". The number corresponds to the level. "alta" means the "upper part".<br />
Anchor screws are first finger-tightened and then tightened when all the screens<br />
are installed in place.<br />
M) Fasten inner tie-rods (11 - Fig.10) connected to the inner basket and the four<br />
antilock plates with the two flat irons of external support (12).<br />
N) U 50x25 upper ring (13 - Fig. 12) of the telescoping section that has only one<br />
groove is coupled with the groove on the screen that has two bevels for the drains.<br />
Install the intermediate 50x5 ring and the small screen and the lower 100x5 ring.<br />
Install the six 400x8x1500 flat irons (15) in a vertical position as illustrated in Fig. 11<br />
and then the four L = 2000 mm reinforcing members (16). Install drains (17) and<br />
fasten all the screws.<br />
O) Take folding tube (19 - Fig. 12), install door-opening rods (20) and long hoisting rod<br />
(18). Assemble as illustrated in fig. 12.<br />
Connect one end of the cable to the inner basket. Make it pass through one of the<br />
two pulleys located at point (22 - Fig. 12) on the long rod. Run the cable through<br />
the pulley of small rod (21) and then run it through the other pulley of the long rod<br />
and insert it in tube (23) placed on the profiled ring and connect it to winch (24).<br />
Install the cleaner in its opening on fixed tube (7) and square 60x60 tube which<br />
exits from cleaner "P" to go outside the drier (Fig. 12).<br />
32