Montageanleitung DE Installation instructions GB ... - Wolf
Montageanleitung DE Installation instructions GB ... - Wolf
Montageanleitung DE Installation instructions GB ... - Wolf
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Connection set<br />
for installation on finished walls<br />
Pipework installation<br />
Fit the gas connection, primary flow, primary return, DHW and cold water pipes in that<br />
order to ensure a trouble-free installation.<br />
Gas pipe<br />
Heating<br />
flow<br />
DHW<br />
Cold<br />
water<br />
Heating<br />
return<br />
- Trim the gas pipe from the connection set to size.<br />
Fit the union nut and compression rings, and insert the support sleeves into the gas<br />
pipe.<br />
Insert the gas pipe into the gas ball valve elbow and into the straight connector on<br />
the connection panel, and tighten with the compression fittings.<br />
- Trim the primary flow and return pipes from the connection set to size.<br />
Fit the union nut and compression rings, and insert the support sleeves into the<br />
primary flow and return pipes.<br />
Insert the pipe into the straight valve (maintenance) elbow and into the straight<br />
connector on the connection panel, and tighten with the compression fittings.<br />
- Trim the DHW pipe from the connection set to size and insert the support sleeves into<br />
the pipe.<br />
Insert the DHW pipe into the straight connector on the DHW cylinder and into the<br />
straight connector on the connection panel, and tighten with the compression fittings.<br />
- Cold water supply excl. safety assembly:<br />
Trim both ends of the cold water pipe from the connection set to size and insert the<br />
support sleeves into the pipe.<br />
Insert the cold water pipe into the straight connector on the DHW cylinder and into the<br />
straight connector on the connection panel, and tighten with the compression fittings.<br />
- Cold water connection incl. safety assembly, excl. pressure reducer or safety<br />
assembly incl. pressure reducer:<br />
Pre-assemble the safety assembly excl. pressure reducer or safety assembly incl.<br />
pressure reducer using the pipe components supplied. (The cold water pipe from<br />
the connection set is surplus to requirements). Trim the pipe components to size and<br />
fit tightly using the support sleeves and compression fittings.<br />
Please note: Never install shut-off equipment, dirt traps or other restrictions<br />
between the DHW cylinder and the safety valve.<br />
DHW cylinder flow/return installation<br />
- Trim the DHW cylinder flow pipe from the connection set and locate on the cylinder<br />
side with a union nut and locking ring.<br />
Insert the support sleeve into the pipe.<br />
Secure the DHW cylinder flow pipe with compression fitting and with flat gasket on<br />
the three-way diverter valve.<br />
- Trim the DHW cylinder return pipe from the connection set and locate on the cylinder<br />
side with a union nut and locking ring.<br />
Insert the support sleeve into the pipe.<br />
Secure the DHW cylinder return pipe with compression fitting and with flat gasket on<br />
the gas fired boiler.<br />
DHW<br />
flow<br />
DHW<br />
return<br />
Initial start-up<br />
Vent - cylinder flow<br />
Fill the heating system and vent carefully. During the filling process, vent the boiler at<br />
air-vent valves in the boiler DHW cylinder flow and return.<br />
Fill the DHW cylinder.<br />
Switch ON the boiler and select the required DHW temperature at the boiler control unit:<br />
Position 1: 15 °C<br />
Position 9: approx. 65 °C<br />
<strong>Wolf</strong> GmbH · Postfach 1380 · 84048 Mainburg · Tel. 08751/74-0 · Fax 08751/741600 · Internet: www.wolf-heiztechnik.de<br />
7