Handover-Ceritficate<br />
Handover certificate (copy for the company carrying out the installation)<br />
❏<br />
❏<br />
❏<br />
The initial operation and instruction was carried out in the presence of the person authorised to perform the<br />
acceptance and the system operator.<br />
The system operator/person authorised to perform the acceptance was informed about the obligation to service<br />
the product according to the enclosed operating instructions.<br />
Initial operation and instruction were not carried out.<br />
The client/ person responsible for initial operation was handed the following components and/or product components<br />
Initial operation and instruction is being carried out by (company, address, contact, phone)<br />
The exact coordination of the dates for initial operation/instruction is being carried out by the system operator and person<br />
responsible for initial operation.<br />
Place, date Signature of person Signature of system operator Signature of the company<br />
authorised to perform acceptance<br />
carrying out the installation work<br />