8. Maintenance and Controls<br />
INSTALLATION SELF-CHECK MAINTENANCE DISPOSAL GENERAL INSPECTION REPAIR<br />
Who Specialist company Specialist Specialist company or Disposal company Qualified body Specialist company<br />
works customer service 1<br />
What Measurement of the Measurement of the Removal of light fluid ˛ Complete emptying<br />
layer thickness of : layer thickness of : and sludge ˛ Cleaning<br />
· light fluid · light fluid ˛<br />
· of the sludge layer · of the sludge layer<br />
Check of the self-actuating Check of the self-actuating The waste disposal<br />
closure and warning device closure and warning device regulations must<br />
be observed!<br />
· Emptying and cleaning,<br />
if necessary<br />
· Cleaning of the sample<br />
removal device<br />
· Check of the operating<br />
logbook<br />
Check for proper condition and proper operation, and<br />
at least however:<br />
- Safety against the escape of light fluids from the separator<br />
system or the shaft units (excess height)<br />
- Structural condition and integrity of the separator system<br />
- Condition of the installed parts and the electrical<br />
equipment<br />
- Calibration of the self-actuating closure device<br />
- Completeness and plausibility of the records in the<br />
operating logbook<br />
- Disposal confirmations of the materials removed<br />
- Availability and completeness of the required<br />
approvals and documentation<br />
If the separator system is also used for the treatment<br />
of commercial waste water or waste water from the<br />
cleaning of vehicles, the following points must also be<br />
checked:<br />
- Actual volume of waste water (origin, quantity, contents,<br />
cleaning agents, operating materials, avoidable<br />
of stable emulsions)<br />
- Dimensioning, suitability and performance of the<br />
separator systems.<br />
When monthly 6-monthly Light fluid 80% is reached Before commissioning, then every 5 years -As required<br />
or the level is below<br />
the retained volume<br />
Sludge collection chamber<br />
is full<br />
Docu- Installation certification operating logbook Maintenance report operating logbook Test report operating logbook<br />
men- by specialist Maintenance report<br />
tation<br />
* If the general inspection is carried out at shorter intervals than 5 years, the maintenance must be carried out by a specialist.<br />