manual_installation_final
Erfolgreiche ePaper selbst erstellen
Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.
Phase 2: Preparation of the Installation
2.0 – Installation of DIN Rail
Pick up the DIN Rail [6] and with the Self
Drilling Screws [14] fix it in an appropriate
space in the wall
Aftet that, clip the disjuntor in the DIN Rail.
1x [5]
1x [6]
2x [15]
1.0
2.1 – Connection of the outlet
and Neu Plus Basis
(A) Pick up the Duplex Wire [8] and the
Outlet [7].
Connect the duplex Wire in the Outlet.
(B) Plug the Neu Plus into its Base [1] and
fix it with the Phillips Screw [15].
1x [1]
1x [7]
1x [8]
2x [16]
1.1.1
1.1
1.1.2
1.2
Installation Manual 12