Phase 2: Preparation of the Installation
2.4 – Connection of the cables to the CT
*Read the Current Transformers Management
Considerations before accomplishing this step*
For each Current Transformer [3], follow the
instructions below:
Open the S1 and S2 inputs of the CTs for
cable entry.
1.4.1
Connect the Black Cable #4 [12] to the S1
input of the CT.
Connect the Black Cable #5 [12] to the S2
output of the CT.
Repeat the process for the remaining CTs
and Cables.
4
5
4
5
S1
S2
2.2
Installation Manual 16
V
I1
I2