23.02.2013 Views

Doing Business in Kosovo - US Department of State

Doing Business in Kosovo - US Department of State

Doing Business in Kosovo - US Department of State

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

capacity, start<strong>in</strong>g with an <strong>in</strong>itial 300 plus 300 MW. Despite extensive delays, the project is back<br />

on track and a new transaction advisor is on board, work<strong>in</strong>g with the pre-qualified <strong>in</strong>vestors.<br />

The GoK expects to release the f<strong>in</strong>al Request for Proposal <strong>in</strong> early 2012 with selection <strong>of</strong> the<br />

successful bidder by the end <strong>of</strong> 2012.<br />

The privatization <strong>of</strong> the network distribution and supply side <strong>of</strong> KEK, also part <strong>of</strong> the energy<br />

strategy, is anticipated to improve and expand the distribution network, <strong>in</strong>crease bill<strong>in</strong>g and<br />

collections, reduce electricity losses, and improve the security <strong>of</strong> supply and overall service<br />

quality. This privatization process is further along than the generation privatization, with bids<br />

due from <strong>in</strong>vestors by the end <strong>of</strong> March 2012.<br />

The GoK, with f<strong>in</strong>ancial assistance from the World Bank, has also engaged consultants to<br />

conduct prelim<strong>in</strong>ary environmental and social assessments for the construction <strong>of</strong> a new<br />

hydropower plant at Zhur, <strong>in</strong> western <strong>Kosovo</strong>. The Zhur hydropower plant is envisaged to<br />

produce a maximum <strong>of</strong> 305 MW <strong>of</strong> electricity. The economic analysis for the project is ready<br />

and GoK is set to restart the stalled process.<br />

A World Bank study estimates that the existence <strong>in</strong> <strong>Kosovo</strong> <strong>of</strong> 12 billion tons <strong>of</strong> lignite coal<br />

would enable <strong>Kosovo</strong>’s generat<strong>in</strong>g capacity to <strong>in</strong>crease an additional 2000 MW. <strong>Kosovo</strong> has the<br />

5 th largest proven lignite coal reserves <strong>in</strong> the world, and the World Bank ranked <strong>Kosovo</strong> first <strong>in</strong><br />

Europe <strong>in</strong> potential cost efficiency <strong>of</strong> electricity generation. A significant amount <strong>of</strong> money<br />

would be needed to develop all aspects <strong>of</strong> <strong>Kosovo</strong>’s energy sector. However, <strong>Kosovo</strong>’s power<br />

<strong>in</strong>dustry provides enormous potential and a promis<strong>in</strong>g start<strong>in</strong>g po<strong>in</strong>t for U.S. companies want<strong>in</strong>g<br />

to enter the Southeastern Europe energy market.<br />

Development <strong>of</strong> renewable energy and <strong>in</strong>creased energy efficiency: The World Bank has been<br />

study<strong>in</strong>g the potential for the Zhur Hydro Power plant. The GoK has expressed <strong>in</strong>terest <strong>in</strong><br />

explor<strong>in</strong>g the potential for solar, w<strong>in</strong>d and geothermal energy. Reliable basel<strong>in</strong>e data are<br />

required for all sources <strong>in</strong>clud<strong>in</strong>g hydro and development <strong>of</strong> projects must be coupled with<br />

establishment <strong>of</strong> a suitable regulated tariff regime that clearly addresses all aspects <strong>of</strong> system<br />

reliability and any subsidies that may be required. The World Bank has been provid<strong>in</strong>g the<br />

Energy Regulatory Office assistance to develop a renewable energy tariff regime. End-use<br />

energy efficiency improvements will become <strong>in</strong>creas<strong>in</strong>gly attractive once collection discipl<strong>in</strong>e is<br />

complete and full-cost tariffs provide proper <strong>in</strong>centives. Several donors are already beg<strong>in</strong>n<strong>in</strong>g to<br />

develop programs <strong>in</strong> this area.<br />

Sub-Sector Best Prospects Return to top<br />

Turb<strong>in</strong>es<br />

Generators<br />

Power systems spare parts<br />

Power operation and ma<strong>in</strong>tenance services<br />

Legal and consult<strong>in</strong>g services<br />

Opportunities Return to top<br />

New, <strong>in</strong>dependent power plants (coal or hydro powered)<br />

Renewable energy, especially w<strong>in</strong>d and water

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!