afi met bulletins exchange (ambex) handbook - ICAO
afi met bulletins exchange (ambex) handbook - ICAO
afi met bulletins exchange (ambex) handbook - ICAO
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
AFI Regional SIGMET Guide Page 44/60<br />
3. SIGMET test procedures<br />
3.1 Procedures for WC and WV SIGMET TEST :<br />
3.1.1 Operational Units:<br />
3.1.1.1 Tropical Cyclone Advisory Centre (TCAC: La Réunion<br />
3.1.1.2 Volcanic Ash Advisory Centre (VAAC): Toulouse<br />
3.1.1.3 Regional OPMET Data Bank (RODB): Dakar, Pretoria<br />
3.1.1.4 Meteorological Watch Office (MWO)<br />
3.1.1.4.1 All MWOs listed in AFI FASID Table MET 3A and MET 3B, under the responsibility of<br />
Toulouse, VAAC and La Réunion, TCAC.<br />
Note: The participation of MWOs of States, which do not belong to AFI region, should be coordinated<br />
through the relevant <strong>ICAO</strong> Regional Office.<br />
3.1.2 Test date and time<br />
3.1.2.1 <strong>ICAO</strong> Regional Office will set a date and time after consultation with the VAAC, TCAC<br />
and RODB. The information about the agreed date and time will be sent to all States concernedand<br />
copied to the States SIGMET Tests Focal Points.<br />
3.1.3 Test messages<br />
3.1.3.1 Each VAAC or TCAC prepares a simple TEST message in the form of VA or TC<br />
advisory. The formats of the said TESTsare given in Attachment 1 to this Appendix.<br />
3.1.3.2 The MWOs, upon receipt of the TEST VA/TC advisory, should prepare a TEST<br />
SIGMET for volcanic ash or tropical cyclone, respectively, and send it to the RODBs. The WMO heading<br />
and the first line of the SIGMET should be valid ones, while the body of the message should contain an<br />
explanatory text on the testsas show in Attachment 1 to this Appendix.<br />
3.1.3.3 The MWOs should issue a WV or WC TEST SIGMET within the 10-minute period<br />
following the issuance of VA or TC test message by the corresponding VAAC or TCAC.<br />
3.2 Procedures for WS SIGMET Tests<br />
3.2.1 WS SIGMET advisory Test should be initiated by Pretoria RODB in coordination with<br />
<strong>ICAO</strong> Regional Offices in Dakar and Nairobi. The information about the date and time will be sent to all<br />
States concerned and copied to the State’s SIGMET Tests Focal Points.<br />
Ninth Edition September 2007 Amend1/2010<br />
J-2