02.03.2013 Views

afi met bulletins exchange (ambex) handbook - ICAO

afi met bulletins exchange (ambex) handbook - ICAO

afi met bulletins exchange (ambex) handbook - ICAO

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AMBEX HANDBOOK 7th Ed. 15/58<br />

5.5 Regional OPMET Data Banks (RODB)<br />

5.5.1 Two centres have been designated by APIRG (APIRG/13 Conclusion 13/67, 2001), to<br />

serve as Regional OPMET Data Banks: Dakar and Pretoria. FASID Table MET 4C reflects the<br />

requirements for the operation of the AFI OPMET data banks to support the AMBEX Scheme.<br />

5.5.2 The main responsibilities of the RODBs are defined, as follows:<br />

- to support the AMBEX Scheme and to facilitate a regular <strong>exchange</strong> of OPMET information based<br />

on predetermined distribution within the AFI Region;<br />

- to operate as Inter-regional OPMET Gateway (IROG) with responsibility of exchanging OPMET<br />

information between AFI Region and the adjacent Regions; and<br />

- to provide facilities for request/response type of access to the stored OPMET data for users to<br />

obtain non-regular or occasional information.<br />

Note. — The interrogation procedures applicable to the OPMET data banks and catalogues are provided<br />

in the “AFI Regional Interface Control Document (ICD) - OPMET Data Bank Access Procedures”,<br />

published and maintained by the <strong>ICAO</strong> Regional Offices in Dakar and Nairobi<br />

5.6 Inter-regional OPMET Gateways (IROG).<br />

5.6.1 The Inter-regional OPMET Gateways in the AFI Region are the designated RODBs. Each<br />

RODB is assigned responsibility for <strong>exchange</strong> of OPMET information with other <strong>ICAO</strong> Regions. The<br />

responsibilities of the IROGs for AFI is shown in para. 11.1 of this Handbook.<br />

5.6.2 Support to the SADIS broadcast. The RODBs and IROGs should facilitate the global<br />

<strong>exchange</strong> of OPMET data carried out through the SADIS satellite broadcast. In order to achieve this,<br />

close liaison should be maintained between the IROGs and the corresponding SADIS gateways.<br />

Availability of AFI data on SADIS should be monitored and any systematic shortfalls of data identified<br />

should be reported to the relevant <strong>ICAO</strong> regional office.<br />

5.7 Structure of the AMBEX Scheme<br />

5.7.1 The overall structure of the AMBEX scheme is presented in the following diagram

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!