09.03.2013 Views

Clean development mechanism project design ... - myclimate

Clean development mechanism project design ... - myclimate

Clean development mechanism project design ... - myclimate

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Gold Standard Local Stakeholder Consultation Report<br />

SECTION B. DESIGN OF STAKEHOLDER CONSULTATION PROCESS<br />

B. 1. Design of physical meeting(s)<br />

i. Agenda<br />

Please ensure that at least the following points are covered but feel free to add more points as<br />

needed:<br />

- Opening of the meeting<br />

- Explanation of the programme<br />

- Questions for clarification about the programme<br />

- Blind SD exercise (to be conducted per methodology/technology/practice)<br />

- Discussion on monitoring SD (to be conducted per methodology/technology/practice)<br />

- Closure of the meeting<br />

[See Toolkit 2.6.1 and Toolkit Annex J<br />

The stakeholder consultation was an electronic consultation through emails and phones. A physical<br />

meeting was also conducted at the SKG Sangha office, Kolar, Karnataka State. The report and<br />

minutes of the meeting and meeting details were explained in section: C3.<br />

The LSC meeting carried no fixed time table but the following aspects were part of the Agenda:<br />

1. Detailed description of the PoA and CPAs activities<br />

2. Participants opinions and comments<br />

3. Explanations on the doubts and comments of the participants<br />

4. Discussion on sustainable <strong>development</strong>al aspects<br />

5. Monitoring of sustainable <strong>development</strong> aspects in relation to the <strong>project</strong> activity<br />

6. Participants opinion on the LSC<br />

ii. Non-technical summary of the Programme<br />

Please be aware that carbon market specific terms may not be appropriate for the readers/<br />

audience of this summary.<br />

[See Toolkit 2.6 and Toolkit Annex J]<br />

Name of the PoA: SKG Sangha Biodigester Programme<br />

Area of Operation: All the areas in Republic of India<br />

Number of CPAs: about 17<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!