6. A provision that all work to be performed under this <strong>Order</strong> shall be done in<br />

compliance with all applicable laws.<br />

7. The Removal Plan shall include a site plan showing the location <strong>and</strong> identity <strong>of</strong><br />

all existing, temporary Best Management Practices (BMPs) installed to address<br />

erosion control <strong>and</strong> water quality on the eastern portion <strong>of</strong> the site that are<br />

proposed to remain in place. Such approved temporary BMPs shall be removed<br />

within 24 months <strong>of</strong> issuance <strong>of</strong> these <strong>Order</strong>s <strong>and</strong> by no later than 180 days<br />

subsequent to initiation <strong>of</strong> development authorized pursuant to the CDP. This<br />

deadline may be extended by the Executive Director for good cause pursuant to<br />

Section <strong>13</strong>, below.<br />

B. Upon approval <strong>of</strong> the Removal Plan by the Executive Director, Respondent shall<br />

implement the plan completely, pursuant to the approved schedule/timeline included in<br />

the plan, with all work under the Removal Plan to be completed as early as possible<br />

pursuant to recommendations by the consulting resource specialist, but by no means later<br />

than 90 days after issuance <strong>of</strong> any grading permit for the subject property or within 18<br />

months <strong>of</strong> issuance <strong>of</strong> these <strong>Consent</strong> <strong>Order</strong>s, whichever occurs first. The Executive<br />

Director may extend this deadline or modify the approved schedule upon a showing <strong>of</strong><br />

good cause, pursuant to Section <strong>13</strong> <strong>of</strong> these <strong>Consent</strong> <strong>Order</strong>s.<br />

C. Within 30 days <strong>of</strong> the completion <strong>of</strong> the activities set forth in the Removal Plan,<br />

Respondent shall submit to the Executive Director <strong>of</strong> the Commission a report<br />

documenting removal <strong>of</strong> the Unpermitted Objects from the property. This report shall<br />

include a summary <strong>of</strong> dates when work was performed <strong>and</strong> photographs that show<br />

implementation <strong>of</strong> the Removal Plan, as well as photographs <strong>of</strong> the property before <strong>and</strong><br />

after the removal activities required by the Removal Plan have been completed, taken<br />

from, <strong>and</strong> depicting, the same locations on the site.<br />

4.4 Exp<strong>and</strong>ed Habitat Restoration <strong>and</strong> Management Program<br />

A. Within 30 days <strong>of</strong> Respondent’s first submittal <strong>of</strong> a grading plan to the City <strong>of</strong> Dana<br />

Point, or within 12 months <strong>of</strong> issuance <strong>of</strong> these <strong>Consent</strong> <strong>Order</strong>s, whichever occurs first,<br />

Respondent shall submit an Exp<strong>and</strong>ed HRMP for the review <strong>and</strong> approval <strong>of</strong> the<br />

Executive Director that satisfies the requirements <strong>of</strong> Special Condition #4 <strong>of</strong> Coastal<br />

Development Permit <strong>No</strong>. A-5-DPT-05-306 <strong>and</strong> also incorporates restoration,<br />

maintenance, <strong>and</strong> preservation, in the same manner <strong>and</strong> subject to all the same<br />

requirements as the work done in the 1.9-acre restoration area, <strong>of</strong> all portions <strong>of</strong> the<br />

Impacted Area outside the 1.9-acre HRMP restoration area but not within the<br />

development footprint <strong>of</strong> the project authorized by the CDP. The final Exp<strong>and</strong>ed HRMP<br />

approved by the Executive Director will satisfy the requirement to submit an HRMP<br />

pursuant to Special Condition #4 <strong>of</strong> the CDP.<br />

These <strong>Order</strong>s are designed to be complementary to any work which may be authorized<br />

under the CDP. However, that does not affect the independent nature <strong>of</strong> each set <strong>of</strong><br />

requirements. The parties agree that nothing herein affects the obligations addressed in<br />

Appendix A<br />

<strong>CCC</strong>-<strong>13</strong>-CD-02&<br />

<strong>CCC</strong>-<strong>13</strong>-RO-02<br />

Page 4 <strong>of</strong> <strong>13</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!