Davis Square Partners, LLC - City of Somerville
Davis Square Partners, LLC - City of Somerville
Davis Square Partners, LLC - City of Somerville
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
AUTOGRAPH<br />
BOSTON, MASSACHUSETTS<br />
An upscale luxury boutique hotel and restaurant<br />
Location: Innovation District, Boston, Massachusetts<br />
Client : Norwich <strong>Partners</strong><br />
Financing: Bank Financed<br />
Construction Costs: Approximately $42.6 Million<br />
Autograph hotel is set to be located in Boston’s innovation District in a gate way site to the Seaport that is currently a surface<br />
parking lot. The hotel’s architecture is finely detailed and organized like a transparent jewel box partially contained<br />
within a solid armature. The playfulness <strong>of</strong> the positive and negative facades allows for sprawling views <strong>of</strong> the <strong>City</strong> and<br />
Harbor with framed views <strong>of</strong> the emerging Innovation District.<br />
Modern use <strong>of</strong> time honored materials such as glass, metal, stone and wood ground the building to its historic site and<br />
sets it <strong>of</strong>f from its contemporary surroundings. Glass and steel signal the entrance to the hotel at street level while the<br />
building’s massing identifies the pedestrian point <strong>of</strong> entry from afar. Innovative exterior lighting will dramatically bring the<br />
boutique scale <strong>of</strong> the hotel to the foreground as seen from downtown Boston and its historic harbor.<br />
The Hotel will house 136 guest rooms and have all <strong>of</strong> the luxury amenities you would expect an upscale boutique hotel to<br />
have such as luxurious bathrooms, built in technology for the guest rooms, room service, upscale restaurant and a 5,000<br />
SF ro<strong>of</strong>top bar / lounge. The design and furniture pieces within the hotel will set the property above its competitive set.<br />
In addition the Project will also house the future location <strong>of</strong> the Fort Point Channel Arts Community Gallery and Visitors<br />
Center.<br />
The Autograph is currently in branding and design phase and is on schedule for permitting in late June 2013 or early July<br />
2013, subject to B.R.A. Article 80. The Hotel is planned to receive a LEED silver rating and has worked with the <strong>City</strong> to reduce<br />
parking counts, promote public and bicycle transportation and is also providing a Pedestrian Plaza that will connect<br />
the Boston Harborwalk that is currently interrupted at this location.<br />
33