Standards IEC – ANSI/IEEE comparison<br />

AMTED300014EN.indd<br />

b For routine tests, auxiliary circuits are checked at 1500 V x 1 min in ANSI<br />

(C37.20.3) instead of 2 kV x 1 min for IEC.<br />

b ANSI switches according to C37.20.4 shall perform load-breaking tests<br />

before any of the optional rating tests (fault making for integral switch-fuse,<br />

cable charging switching current, unloaded transformer switching current).<br />

b Dielectric test as condition check after power tests or mechanical<br />

endurance tests is specified at 80% of the rated power frequency withstand<br />

voltage by IEC (common clauses), and only at 75% by ANSI (C37.20.4).<br />

b<br />

Fuse to checked current to ground during power tests of switches<br />

is specified differently in IEC and ANSI (100 mm long and 0.1mm diameter<br />

for IEC, 3 A rating or 2 inches long and #38AWG for ANSI).<br />

81