26.03.2013 Views

SAFT ELECTRIC STORAGE BATTERY Gulfstream Aerospace P/N ...

SAFT ELECTRIC STORAGE BATTERY Gulfstream Aerospace P/N ...

SAFT ELECTRIC STORAGE BATTERY Gulfstream Aerospace P/N ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SAFT</strong> AMERICA INC.<br />

Component Maintenance Manual<br />

1159SCAV519-1<br />

checking the capacity (discharge and complementary<br />

checks as required),<br />

final charging after checking the insulation,<br />

Overhaul, including:<br />

disassembling the battery,<br />

cleaning,<br />

inspection,<br />

assembling the battery.<br />

This operation is to be performed during reconditioning, after<br />

the capacity check and before the final charging.<br />

It is either scheduled or to be performed when cells are to be<br />

replaced.<br />

(2) Charging in workshop<br />

(a) General conditions<br />

Equipment required :<br />

battery charger,<br />

valve wrench.<br />

CAUTION: CHARGING SHOULD BE PERFORMED ONLY IN<br />

CLEAN AND VENTILATED PREMISES WHICH<br />

ARE NOT USED FOR LEAD BATTERIES (ACID<br />

ATMOSPHERE).<br />

REMOVE THE COVER OF THE <strong>BATTERY</strong> AND<br />

LOOSEN, BUT DO NOT REMOVE, THE VALVES<br />

(USING THE WRENCH), ALLOWING THE<br />

GASES PRODUCED TO BE DISSIPATED<br />

WITHOUT PLACING THE ELECTROLYTE IN<br />

CONTACT WITH THE AMBIENT AIR (RISKS OF<br />

CARBONATION).<br />

24-34-01<br />

PAGE 103<br />

AUG 30/96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!