SAFT ELECTRIC STORAGE BATTERY Gulfstream Aerospace P/N ...
SAFT ELECTRIC STORAGE BATTERY Gulfstream Aerospace P/N ...
SAFT ELECTRIC STORAGE BATTERY Gulfstream Aerospace P/N ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>SAFT</strong> AMERICA INC.<br />
Component Maintenance Manual<br />
1159SCAV519-1<br />
checking the capacity (discharge and complementary<br />
checks as required),<br />
final charging after checking the insulation,<br />
Overhaul, including:<br />
disassembling the battery,<br />
cleaning,<br />
inspection,<br />
assembling the battery.<br />
This operation is to be performed during reconditioning, after<br />
the capacity check and before the final charging.<br />
It is either scheduled or to be performed when cells are to be<br />
replaced.<br />
(2) Charging in workshop<br />
(a) General conditions<br />
Equipment required :<br />
battery charger,<br />
valve wrench.<br />
CAUTION: CHARGING SHOULD BE PERFORMED ONLY IN<br />
CLEAN AND VENTILATED PREMISES WHICH<br />
ARE NOT USED FOR LEAD BATTERIES (ACID<br />
ATMOSPHERE).<br />
REMOVE THE COVER OF THE <strong>BATTERY</strong> AND<br />
LOOSEN, BUT DO NOT REMOVE, THE VALVES<br />
(USING THE WRENCH), ALLOWING THE<br />
GASES PRODUCED TO BE DISSIPATED<br />
WITHOUT PLACING THE ELECTROLYTE IN<br />
CONTACT WITH THE AMBIENT AIR (RISKS OF<br />
CARBONATION).<br />
24-34-01<br />
PAGE 103<br />
AUG 30/96