02.04.2013 Views

receipt and turn-in procedures - Air Force Link

receipt and turn-in procedures - Air Force Link

receipt and turn-in procedures - Air Force Link

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AFMAN 23-110 Volume 3<br />

Part 2, Chapter 4<br />

ascerta<strong>in</strong> specifics perta<strong>in</strong><strong>in</strong>g to the litigation situation. After negotiation/litigation with the contractor/<br />

transporter the materiel will be re-identified to the correct condition, shipped back to contractor, or<br />

shipped to repair facility. If materiel is to be re<strong>turn</strong>ed to the contractor, a manager forced shipment must<br />

be made. These actions will be accomplished with<strong>in</strong> 90 days or as soon as the litigation is completed.<br />

Condition code "L" materiel will be reviewed quarterly by the IMS <strong>and</strong> follow-up <strong>in</strong>itiated as necessary.<br />

4.10. D035K Process<strong>in</strong>g of Receipts after Logistical Reassignment .<br />

4.10.1. Logistic reassignment (LR) refers to the transfer of materiel management responsibilities<br />

from one materiel manager to another materiel manager. The procurement office of the los<strong>in</strong>g IM is<br />

required to process to completion all <strong>in</strong>complete contracts cover<strong>in</strong>g items to be transferred.<br />

4.10.2. Subsequent contract <strong>receipt</strong>s will cause the D035K system to generate a D4X (Materiel<br />

Receipt Decapitalization) <strong>and</strong> DEE/DEF (Logistic/Decapitalization Transfer) to the ga<strong>in</strong><strong>in</strong>g item<br />

manager (GIM). A DZC (Logistics Reassignment Storage Information) transaction will be sent to the<br />

DSS storage activity as notification that wholesale stocks are now under the ownership <strong>and</strong> accountability<br />

of the GIM.<br />

4.11. Process<strong>in</strong>g F-16 Receipts for Foreign Government Stored Materiel . All <strong>receipt</strong>s for materiel<br />

identified to own<strong>in</strong>g rout<strong>in</strong>g identifier codes "F2Y," "F4Y," "F6Y," "F7Y," <strong>and</strong> "F8Y" will be passed from<br />

DSS for automatic <strong>in</strong>put to the D035K system. The D035K system will mechanically produce a document<br />

identifier "D6_" transaction that will be transmitted to the D034A system. The third <strong>and</strong> seventh<br />

position of all <strong>receipt</strong> documents will be assigned by the D034A system. This will allow the required process<strong>in</strong>g<br />

<strong>in</strong> the D034A system, which provides IM management for foreign government materiel stored at<br />

the center for F-16 support.<br />

4.12. Receipt Transaction for the Materiel Utilization Control Office (MUCO) <strong>and</strong> <strong>Air</strong> <strong>Force</strong> Supply<br />

Directives (AFSD). Receipts for the MUCO (F_6) <strong>and</strong> AFSD (F_4) accounts will be passed from<br />

the DSS for automatic <strong>in</strong>put to D035K system to post the custody balance. Upon successful <strong>in</strong>put of the<br />

<strong>receipt</strong>, D035K system notifies the D034A, Special Support Stock Control <strong>and</strong> Distribution System.<br />

4.13. First Article Test Items (FATI) Procedure.<br />

4.13.1. All first article test items that are to be tested by an organic test<strong>in</strong>g agency will be delivered to<br />

Central receiv<strong>in</strong>g for process<strong>in</strong>g. AFMCI 64-110 provides "First Article Management." Central<br />

Receiv<strong>in</strong>g will manage first article items as follows:<br />

4.13.1.1. Set up <strong>procedures</strong> to ensure control over the <strong>receipt</strong> <strong>and</strong> process<strong>in</strong>g of first article test<br />

items to assure <strong>and</strong> expedite delivery of the items to the appropriate test location as determ<strong>in</strong>ed by<br />

MM.<br />

4.13.1.2. Notifies the procurement contract<strong>in</strong>g officer (PCO) <strong>and</strong> Director/Materiel Management<br />

(D/MM), First Article Program Manager or item manager (IM) when the first article items are<br />

re<strong>turn</strong>ed from the test<strong>in</strong>g activity. Process items for storage as directed by the PCO or IM or<br />

re<strong>turn</strong> to contractor as directed by the PCO.<br />

4.13.1.3. If the government tested first article is destroyed <strong>in</strong> test, the test<strong>in</strong>g facility will provide<br />

a letter or certificate of destruction. The letter or certificate of destruction will be filled with the<br />

<strong>receipt</strong> documentation <strong>in</strong> Document Control.<br />

4–5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!