DURATION ESTIMATION OF A WORK PACKAGE 217<br />

the relation (2) needs a correction, which will adjust D with a coefficient resulted<br />

from the P id of each project team member. The P id can be calculated as a report<br />

between the estimated (Ecest) and the actual effort (Ecreal) a team member spent on<br />

the c component:<br />

(3) P idi = ECreal<br />

ECest<br />

Depending on how the original estimations were performed, based on the organization<br />

historical data using T P E technique, or based on a single person experience, the P id<br />

will reflect the person’s relative productivity compared to the organization’s average<br />

or compared to that person productivity. If we introduce relation (3) in relation (2),<br />

the result will be an adjusted D (Dadj):<br />

(4) Dadj = EW P<br />

=<br />

P idi<br />

EW P<br />

P ·<br />

−1 P idi<br />

=<br />

P<br />

EW P<br />

P · prod<br />

i<br />

where prod is the team’s productivity coefficient. The value of prod can be influenced<br />

by the correctness of the E estimations and the learning curve of the personal. For<br />

more accurate prod calculations, the P idi needs to be calculated based on historical<br />

data, or predicted, taking into the trend of its professional evolution. In some situations,<br />

like new team members, new project type where no historical data can be<br />

used, the estimation will be erroneous. For this situation Dadj should be adjusted<br />

periodically during the project, by predicting the prod of the team based on their<br />

evaluation till that moment in the project.<br />

Figure 1. Comparing D estimations<br />

Figure 1 shows the different results of the estimations: D1 was estimated with<br />

relation (2), D2 with the adjusted relation (4) and since the real progress is slower<br />

then expected, after the prod readjustments the D4 is obtained, which is more realistic<br />

then the previous ones.<br />

4. Conclusion<br />

Estimation of WP duration is a difficult and key problem in software engineering.<br />

There are several estimation models, but most of them are adjusted for medium and<br />