05.04.2013 Views

CLASSIC SIX METRE NEWSLETTER

CLASSIC SIX METRE NEWSLETTER

CLASSIC SIX METRE NEWSLETTER

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sam Rowse and I have commissioned a complete re-build of Jill, only keeping her lead keel.<br />

Olin (Stephens) is in the loop and making sure we get everything right.<br />

Work started on 20th August 2007 and Rockport Marine is running ahead of schedule. I am<br />

trying to think of a good Spring launch day - maybe a day important in Jill's history<br />

(Editor’s note: the Jill re-build project has set a new standard for Six Metre “visible<br />

construction”. Never has a Six Metre restoration/re-build project provided such a complete<br />

set of step-by-step publicly available photographs. In the absence of an ISMA-mandated<br />

construction survey service such as Lloyds and Veritas performed previously, Jill’s “visible<br />

construction” approach is probably the best solution for providing a guarantee to the Six<br />

Metre community that her re-build has faithfully used traditional materials and construction<br />

techniques.<br />

Martha Coolidge’s Web site is web.mac.com/marthafaycoolidge/iWeb/Site/Jill.html and<br />

Rockport Marine’s www.rockportmarine.com. The photographs have been circulated on a<br />

monthly basis by Matt Cockburn (matt6mr56@comcast.net).)<br />

31. L 42 Leila (W. Fife, 1912), by Mike Dalglish (U.K.)<br />

Leila is just starting her refit now and it is going to be a lot more extensive than what we first<br />

thought. We found quite a lot of rot in her, stem and sternpost mainly.<br />

It will be a few years before she graces these fine Scottish waters again, hopefully in time for<br />

her centennial, 2012.<br />

- 39-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!