10.04.2013 Views

Programmatic Agreement for Approval of Categorical Exclusions

Programmatic Agreement for Approval of Categorical Exclusions

Programmatic Agreement for Approval of Categorical Exclusions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sudbury River beginning at the Dan<strong>for</strong>th Street Bridge in the Town <strong>of</strong> Framingham, downstream to the<br />

Route 2 Bridge in Concord. The Sudbury River from the Route 2 Bridge downstream to its confluence<br />

with the Assabet River at Egg Rock. Also, the Assabet River beginning 1,000 feet downstream from the<br />

Damon Mill Dam in the town <strong>of</strong> Concord, to its confluence with the Sudbury River at Egg Rock in Concord<br />

and the Concord River from Egg Rock at the confluence <strong>of</strong> the Sudbury and Assabet Rivers downstream<br />

to the Route 3 Bridge in the Town <strong>of</strong> Billerica.<br />

Question 24 -Areas containing prime or unique farmland can be identified using Natural Resource<br />

Conservation Service (NRCS) maps. NRCS maps can be viewed at most local libraries or regional<br />

U.S. Department <strong>of</strong> Agriculture (USDA) Service Centers. Service Center locations can be found on the<br />

USDA web site.<br />

Question 25 -The Environmental Protection Agency publishes the National Priorities List (Superfund) <strong>for</strong><br />

Massachusetts on their web site.<br />

Question 26 - Examples <strong>of</strong> projects involving changes in access control include:<br />

9 Changing a segment <strong>of</strong> highway from partially or fully-controlled access to uncontrolled access.<br />

9 Modification <strong>of</strong> an existing interchange by adding or relocating ramps.<br />

9 Adding a new interchange to a highway.<br />

9 Changing an at-grade intersection to a grade separation.<br />

9 Changes in access control <strong>for</strong> non-highway purposes.<br />

Question 27 - If the five listed conditions concerning a temporary road, detour or ramp do not occur, "no"<br />

should be checked on the CE checklist.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!