BLD-CSTN<br />

Index-code S No Description Unit Quantity Rate<br />

Rs.<br />

Amount<br />

Rs.<br />

Remarks<br />

1 2 3 4 5 6 7<br />

25 Damp proof course 50mm thick with 1:2:4 cement<br />

concrete Nominal mix, using 12mm hard broken stone<br />

aggregate including cost of all materials, seigniorage<br />

charges, excluding conveyance charges of materials<br />

BLD-CSTN-2-17 including the cost of machinery, labour charges,<br />

mixing, placing in position, leveling, vibrating, curing<br />

etc. complete for finished item of work. (Using<br />

concrete mixer)<br />

BLD-CSTN-2-18<br />

26<br />

11.7<br />

Unit = 20 sqm<br />

A. MATERIALS:<br />

Cement kgs 320.00<br />

Coarse aggregate 12mm cum 0.90<br />

Fine aggregate (sand) cum 0.45<br />

Seigniorage charges of coarse aggregate cum 0.90<br />

Seigniorage charges of sand cum 0.45<br />

Form work<br />

B. MACHINERY<br />

L.S.<br />

Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity<br />

C. LABOUR:<br />

hour 1.00<br />

Mason 1 st class day 0.1<br />

Mazdoor (unskilled)<br />

D. Grand Total for 20 sqm<br />

Rate per Sqm = D/20<br />

day 1.98<br />

Supplying, fitting and placing HYSD bar<br />

reinforcement in foundation complete as per<br />

drawings and technical specifications for Bars<br />

below 36 mm dia including over laps and<br />

wastage, where they are not welded<br />

Unit = t<br />

(a) Material<br />

HYSD bars including 5 per cent for overlaps and<br />

1000<br />

&<br />

1200<br />

t 1.05<br />

wastage<br />

Binding wire<br />

(b) Labour for cutting, bending, shifting to site,<br />

tying and placing in position<br />

kg 6.00<br />

Blacksmith / Bar bender day 2.00<br />

Mazdoor (Unskilled)<br />

Sundries on Material<br />

(c) Overheads on (a+b)<br />

(d) Contractor’s profit on (a+b+c)<br />

Rate per t = a+b+c+d<br />

day 6.40<br />

A Supplying, fitting and placing HYSD bar<br />

reinforcement in foundation complete including<br />

wastage, as per drawings and technical<br />

specifications Clauses 1000 and 1202 MORD &<br />

1100, 1600 MORTH for Bars 36 mm dia and<br />

above, where welding required to be done<br />

compulsorily.<br />

1000<br />

&<br />

1200<br />

Unit = t<br />

(a) Material<br />

HYSD bars including 2.5 per cent for wastage t 1.025<br />

Welding Electrodes @ 5 per joint (14 joints / ton) each 70.000<br />

Welding Charges (Hire charges of Welding<br />

Machine)<br />

Hr 10.00<br />

Binding wire kg 6.00<br />

668