BLD-CSTN<br />

Index-code S No Description Unit Quantity Rate<br />

Rs.<br />

Amount<br />

Rs.<br />

Remarks<br />

1 2 3 4 5 6 7<br />

Mason 2nd class day 0.920<br />

Man Mazdoor day 0.700<br />

Woman Mazdoor<br />

Total<br />

day 2.100<br />

BLD-CSTN-7 FLOORING<br />

71 Flooring with 25mm thick polished shabad<br />

BLD-CSTN-7-1<br />

stones set over base coat of CM (1:8) over<br />

already laid CC bed / RCC Roof Slab, including<br />

neat cement slurry of honey like consistency<br />

spread @ 3.3 kgs per sqm. & Jointed with neat<br />

cement to full depth including cost of all<br />

materials like cement, sand, and water and<br />

flooring stones etc., complete, including<br />

seigniorage charges, labour charges for<br />

dressing of flooring stones etc., complete for<br />

finished item of work, but excluding the cost of<br />

conveyance of all materials.<br />

Unit = 10 sqm<br />

A. MATERIALS:<br />

Polished Shabad Stone (White) (0.457 x 0.457m)<br />

SSR item No. (36)<br />

sqm 11.00<br />

BLD-CSTN-7-2<br />

Cement for CM (1:8) proportion for base coat kg. 21.60<br />

Cement for slurry kg. 33.00<br />

Cement for jointing kg. 20.00<br />

Sand for CM (1:8) proportion cum 0.12<br />

Seigniorage charges of sand cum 0.12<br />

B. LABOUR:<br />

Mason 1 st class day 3.10<br />

Mason 2 nd class day 1.10<br />

Mazdoor (unskilled) day 0.86<br />

Add water charges 1%<br />

Grand Total<br />

72 Flooring with 40 mm thick Rough<br />

Cuddapah/Shabad stones, set over base coat of<br />

cement mortar (1 : 8) 12 mm thick over CC bed<br />

already laid or RCC roof slab, including pointing<br />

with cement mortar 1:3 duly filling joints nearly,<br />

including cost of all materials like flooring<br />

stone, cement, sand, and water etc., complete,<br />

including seigniorage charges, labour charges<br />

for dressing of flooring stones etc., complete for<br />

finished item of work, but excluding the cost of<br />

conveyance of all materials.<br />

Unit = 10 sqm<br />

A. MATERIALS:<br />

Rough Cuddapah/Shabad stones (40 mm thick)<br />

(0.457 x 0.457 m)<br />

sqm 10.50<br />

Cement for CM (1:8) proportion for base coat kg. 21.60<br />

Cement for CM 1:3 proportion for pointing kg. 9.60<br />

Sand for CM (1:8) proportion cum 0.12<br />

Sand for CM (1:3) proportion cum 0.02<br />

Seigniorage charges of sand cum 0.14<br />

B. LABOUR:<br />

Mason 1 st class day 0.960<br />

Mason 2 nd class day 2.240<br />

Mazdoor (unskilled) day 3.30<br />

Add water charges 1%<br />

Grand Total<br />

686