BLD-CSTN<br />

Index-code S No Description Unit Quantity Rate<br />

Rs.<br />

Amount<br />

Rs.<br />

Remarks<br />

1 2 3 4 5 6 7<br />

93 Providing skirting to internal walls to 15 cm<br />

height/risers of steps with 25 mm thick polished<br />

Shahabad stone length equal to flooring stones,<br />

set over base coat of CM (1:3) 12 mm thick with<br />

cement slurry of honey like consistency spread<br />

at the rate of 3.30 kgs per sqm and jointed with<br />

BLD-CSTN-7-23 white cement paste mixed with pigment of<br />

matching shade to full depth, including cost of<br />

all materials like Shahabad stone, cement, sand<br />

and water etc., complete including seigniorage<br />

charges, etc., complete for finished item of<br />

work, but excluding the cost of conveyance of all<br />

materials<br />

Unit = 10 sqm<br />

A. MATERIALS:<br />

25 mm thick polished Shahabad stone (White) sqm 10.10<br />

Sand for cm 1:3 base coat cum 0.12<br />

Cement for cm 1:3 base coat kgs 57.60<br />

Cement for slurry kgs 33.00<br />

Seigniorage charges of sand<br />

B. LABOUR<br />

cum 0.12<br />

Mason Ist class day 0.96<br />

Mason 2nd class 2.24<br />

Mazdoor (unskiled) day 3.10<br />

Add water charges 1% 1.00%<br />

BLD-CSTN-7-24<br />

Grand Total<br />

Note : When Mortar mix is changed proportionate quantity of<br />

cement has to be substituted for all Skirting Items.<br />

94 Teak Wood Flooring 40mm. Thick Tongued and<br />

Grooved Planks, including cost of all materials,<br />

labour etc., complete<br />

Unit = 10 sqm<br />

A. MATERIALS:<br />

Teak Wood Planks 40mm thick cum 0.44<br />

75 mm Long Screws 100 Nos 3.00<br />

B. LABOUR<br />

Carpenters 1st Class day 1.95<br />

Carpenters 2nd Class day 4.55<br />

Man mazdoor day 5.40<br />

Note : Deduct 4.3 Nos Carpenters if plank rate is for tongued<br />

and grooved ready planned.<br />

Grand Total<br />