BLD-CSTN<br />

Index-code S No Description Unit Quantity Rate Amount<br />

Remarks<br />

Rs. Rs.<br />

1 2 3 4 5 6 7<br />

Note : When Mortar mix is changed proportionate quantity<br />

of cement has to be substituted for all above Flooring Items.<br />

The same data holds good for stones with all colours. Adopt<br />

same data for polished Kadapa Stones and Bethamcherla<br />

stones.<br />

BLD-CSTN-7-13<br />

BLD-CSTN-7-14<br />

BLD-CSTN-7-15<br />

BLD-CSTN-7-16<br />

83 Gronolithie Concrete Flooring 20 mm thick with<br />

(1:1:2), using 6mm to 12 mm size hard granite<br />

machine crushed metal laid over CC bed already<br />

laid or RCC roof slab, in alternate panels of size<br />

not exceeding 1.50 m x 1.50 m and finishing the<br />

top surface to required smoothness and slopes<br />

and thread lining including cost of all materials<br />

like cement, metal, sand and water etc.,<br />

complete, including seigniorage charges, etc.,<br />

complete for finished item of work, but<br />

excluding the cost of conveyance of all<br />

materials<br />

Unit = 10 sqm<br />

A. MATERIALS:<br />

6mm to 12 mm H.G. Metal (Machine crushed) cum 0.17<br />

Cement kg 120.00<br />

Sand cum 0.085<br />

Seigniorage charges of sand cum 0.085<br />

B. LABOUR<br />

Mason 1 st class day 1.25<br />

Mason 2 nd class day 0.06<br />

Mazdoor (unskiled) day 3.00<br />

Add water charges 1% 1.00%<br />

Grand Total<br />

84 Flooring with 100mm thick Cement Concrete 1:6:10,<br />

using 40mm metal, 100mm thick and 20 mm Cement<br />

Concrete surface (Ellis Pattern, 1st Sort)<br />

Unit = 10 sqm<br />

A. MATERIALS:<br />

Cement Concrete 1:6:10 using concrete mixer cum 1.000<br />

Stone Chippings 3.34 mm - 10 mm cum 0.250<br />

Cement kg 120.000<br />

B. LABOUR<br />

Mason 1 st class day 0.150<br />

Mason 2 nd class day 0.350<br />

Mazdoor (unskiled) day 5.40<br />

Add water charges 1% 1.00%<br />

85<br />

Grand Total<br />

Flooring with Cement Concrete 1:6:10, using<br />

40mm metal, 100mm thick and plastered over<br />

with 12 mm thick in CM(1:3)<br />

Unit = 10 sqm<br />

A. MATERIALS:<br />

Cement Concrete 1:6:10 using concrete mixer cum 1.00<br />

Plastering with CM (1:3), 12 mm thick<br />

Grand Total<br />

10 sqm 1.00<br />

86 Flooring with Cement Concrete 1:6:10, using<br />

40mm metal, 100mm thick and plastered over<br />

with 12 mm thick in CM(1:3) using Red oxid,<br />

with polished surface<br />

Unit = 10 sqm<br />

A. MATERIALS:<br />

Cement Concrete 1:6:10 using concrete mixer cum 1.00<br />

Plastering with CM (1:3), 12 mm thick 10 sqm 1.00<br />

Red oxid kg 10.00<br />

692