Andhra Pradesh Standard Data Buildings
Andhra Pradesh Standard Data Buildings
Andhra Pradesh Standard Data Buildings
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BLD-CSTN<br />
Index-code S No Description Unit Quantity Rate<br />
Rs.<br />
Amount<br />
Rs.<br />
Remarks<br />
1 2 3 4 5 6 7<br />
75 st<br />
Flooring with vitrified tiles of 1 quality, set over<br />
base coat of cement mortar (1:8), 12 mm thick<br />
over CC bed already laid or RCC roof slab,<br />
including neat cement slurry of honey like<br />
BLD-CSTN-7-5<br />
consistency spread @ 3.3.kgs per sqm & jointed<br />
neatly with white cement paste to full depth<br />
mixed with pigment of matching shade,<br />
including cost of all materials like cement, sand<br />
water and tiles etc., complete, including<br />
seigniorage charges, etc., complete for finished<br />
item of work, but excluding the cost of<br />
conveyance of all materials.<br />
Unit = 10 sqm<br />
A. MATERIALS:<br />
Vitrified tiles of 1 st quality of size sqm 10.10<br />
Cement for CM (1:8) for base coat kg. 21.60<br />
Cement for slurry kg. 33.00<br />
Cement for Pointing with CM (1:3) kg. 6.000<br />
Sand for CM (1:8) cum 0.12<br />
Sand for pointing cum 0.020<br />
Seigniorage charges of sand<br />
B. LABOUR<br />
cum 0.140<br />
Mason 1 st class day 0.96<br />
BLD-CSTN-7-6<br />
Mason 2 nd class day 2.24<br />
Mazdoor (unskiled) day 3.30<br />
Add water charges 1% 1.00%<br />
76<br />
Grand Total<br />
Flooring with ceramic tiles, set over base coat of<br />
cement mortar (1:8), 12 mm thick over CC bed<br />
already laid or RCC roof slab, including neat<br />
cement slurry of honey like consistency spread<br />
@ 3.3.kgs per sqm & jointed neatly with white<br />
cement paste to full depth mixed with pigment<br />
of matching shade, including cost of all<br />
materials like cement, sand water and tiles etc.,<br />
complete, including seigniorage charges, etc.,<br />
complete for finished item of work, but<br />
excluding<br />
materials.<br />
the cost of conveyance of all<br />
Unit = 10 sqm<br />
A. MATERIALS:<br />
Ceramic tiles sqm 10.10<br />
Cement for CM (1:8) for base coat kg. 21.60<br />
Cement for slurry kg. 33.00<br />
White cement kg. 2.00<br />
Sand for CM (1:8) cum 0.12<br />
Seigniorage charges of sand cum 0.12<br />
B. LABOUR<br />
Mason 1 st class day 0.96<br />
Mason 2 nd class day 2.24<br />
Mazdoor (unskiled) day 3.30<br />
Add water charges 1% 1.00%<br />
Grand Total<br />
688