11.04.2013 Views

Andhra Pradesh Standard Data Buildings

Andhra Pradesh Standard Data Buildings

Andhra Pradesh Standard Data Buildings

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BLD-CSTN<br />

Index-code S No Description Unit Quantity Rate<br />

Rs.<br />

Amount<br />

Rs.<br />

Remarks<br />

1 2 3 4 5 6 7<br />

75 st<br />

Flooring with vitrified tiles of 1 quality, set over<br />

base coat of cement mortar (1:8), 12 mm thick<br />

over CC bed already laid or RCC roof slab,<br />

including neat cement slurry of honey like<br />

BLD-CSTN-7-5<br />

consistency spread @ 3.3.kgs per sqm & jointed<br />

neatly with white cement paste to full depth<br />

mixed with pigment of matching shade,<br />

including cost of all materials like cement, sand<br />

water and tiles etc., complete, including<br />

seigniorage charges, etc., complete for finished<br />

item of work, but excluding the cost of<br />

conveyance of all materials.<br />

Unit = 10 sqm<br />

A. MATERIALS:<br />

Vitrified tiles of 1 st quality of size sqm 10.10<br />

Cement for CM (1:8) for base coat kg. 21.60<br />

Cement for slurry kg. 33.00<br />

Cement for Pointing with CM (1:3) kg. 6.000<br />

Sand for CM (1:8) cum 0.12<br />

Sand for pointing cum 0.020<br />

Seigniorage charges of sand<br />

B. LABOUR<br />

cum 0.140<br />

Mason 1 st class day 0.96<br />

BLD-CSTN-7-6<br />

Mason 2 nd class day 2.24<br />

Mazdoor (unskiled) day 3.30<br />

Add water charges 1% 1.00%<br />

76<br />

Grand Total<br />

Flooring with ceramic tiles, set over base coat of<br />

cement mortar (1:8), 12 mm thick over CC bed<br />

already laid or RCC roof slab, including neat<br />

cement slurry of honey like consistency spread<br />

@ 3.3.kgs per sqm & jointed neatly with white<br />

cement paste to full depth mixed with pigment<br />

of matching shade, including cost of all<br />

materials like cement, sand water and tiles etc.,<br />

complete, including seigniorage charges, etc.,<br />

complete for finished item of work, but<br />

excluding<br />

materials.<br />

the cost of conveyance of all<br />

Unit = 10 sqm<br />

A. MATERIALS:<br />

Ceramic tiles sqm 10.10<br />

Cement for CM (1:8) for base coat kg. 21.60<br />

Cement for slurry kg. 33.00<br />

White cement kg. 2.00<br />

Sand for CM (1:8) cum 0.12<br />

Seigniorage charges of sand cum 0.12<br />

B. LABOUR<br />

Mason 1 st class day 0.96<br />

Mason 2 nd class day 2.24<br />

Mazdoor (unskiled) day 3.30<br />

Add water charges 1% 1.00%<br />

Grand Total<br />

688

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!