Andhra Pradesh Standard Data Buildings
Andhra Pradesh Standard Data Buildings
Andhra Pradesh Standard Data Buildings
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
BLD-CSTN<br />
Index-code S No Description Unit Quantity Rate<br />
Rs.<br />
Amount<br />
Rs.<br />
Remarks<br />
1 2 3 4 5 6 7<br />
23 Supply and placing of the Ready Mix (RMC)<br />
BLD-CSTN-2-15<br />
<strong>Standard</strong> Design Mix Concrete grade as per IS<br />
4926-2003 with minimum cement content as per<br />
IS code 456-2000 using 20 mm graded metal,<br />
from standard suppliers approved by the<br />
department including pumping, laying concrete,<br />
vibrating, curing etc. complete but excluding<br />
Excluding Cement any<br />
Grade.<br />
cots of steel and its fabrication charges,<br />
centering, shuttering for finished item of work.<br />
A FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)<br />
Unit : 1cum<br />
A. MATERIALS:<br />
Coarse aggregate 20mm graded cum 0.80<br />
Fine aggregate (Sand) cum 0.40<br />
Seigniorage charges for C.A cum 0.80<br />
Seigniorage charges for F.A cum 0.40<br />
Water (including for curing) kl 1.20<br />
B. MACHINERY<br />
Batching plant at 20 cum per hour hour 0.222<br />
Transit mixer 4cum capacity for lead upto 1km hour 0.222<br />
Concrete Pump day 0.222<br />
C. LABOUR:<br />
Mason 1 st class day 0.056<br />
Mason 2 nd class day 0.056<br />
Mazdoor (unskilled) day 0.917<br />
Grand Total<br />
Note : Wherever concrete is carried out using<br />
batching plant, transit mixer, concrete pump, then<br />
Admixtures @ 0.4% of weight of cement may be<br />
added for achieving desired slump of concrete. If<br />
concentrated Admixture is proposed, only 0.04% of<br />
weight of Cement shall be used.<br />
B COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN<br />
BUILDINGS<br />
Unit : 1cum<br />
A. MATERIALS:<br />
Coarse aggregate 20mm graded cum 0.80<br />
Fine aggregate (Sand) cum 0.40<br />
Seigniorage charges for C.A cum 0.80<br />
Seigniorage charges for F.A cum 0.40<br />
Water (including for curing) kl 1.20<br />
B. MACHINERY<br />
Batching plant at 20 cum per hour hour 0.444<br />
Transit mixer 4cum capacity for lead upto 1km hour 0.444<br />
Concrete Pump day 0.444<br />
C. LABOUR:<br />
Mason 1 st class day 0.111<br />
Mason 2 nd class day 0.222<br />
Mazdoor (unskilled) day 1.556<br />
Grand Total<br />
C RCC SLABS, BEAMS<br />
Unit : 1cum<br />
A. MATERIALS:<br />
Coarse aggregate 20mm graded cum 0.80<br />
Fine aggregate (Sand) cum 0.40<br />
Seigniorage charges for C.A cum 0.80<br />
Seigniorage charges for F.A cum 0.40<br />
Water (including for curing) kl 1.20<br />
666