19.04.2013 Views

2009-09 - IRI Portugal - FINAL REPORT - IMPEL

2009-09 - IRI Portugal - FINAL REPORT - IMPEL

2009-09 - IRI Portugal - FINAL REPORT - IMPEL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.1 Project costs<br />

and budget plan<br />

If possible this project will ask for funding from <strong>IMPEL</strong>, otherwise<br />

its costs will be covered by the Portuguese Inspectorate.<br />

The project will include the following steps and events;<br />

• A preparatory meeting of the review team to discuss the<br />

review questionnaire and the preparation of the organisation<br />

of the review.<br />

• A pre-meeting of the Review Team Leader and the Review<br />

Rapporteur with the Portuguese contact persons to finalise the<br />

organisation, scope and timing of the review.<br />

• Preparation of information on the Portuguese Inspectorate and<br />

its activities by the Portuguese contact persons (after a<br />

previous contact with the Review Team Leader in order to<br />

establish the relevant and needed information) and circulation<br />

to Review Team members.<br />

• Review to take place over a period of 4 Days, including one<br />

evaluation/training day at the end (and in addition to this<br />

travelling days).<br />

• A meeting of the Review Team Leader and the Review<br />

Rapporteur with the Portuguese contact persons to discuss the<br />

draft review report.<br />

Meetings and written documents will be conducted in English and no<br />

interpretation is required.<br />

Year1 Year2<br />

1. Overhead (organisation) cost (€) :<br />

2 Project meeting costs (€)<br />

One Project Team Meeting (Lisbon) 1 1<br />

No of Participants:6<br />

Travel 2 3000<br />

Accommodation 3 900<br />

Catering: Provided<br />

by<br />

<strong>Portugal</strong><br />

Meeting venue: Provided<br />

by<br />

<strong>Portugal</strong><br />

Two Meetings Team leader and Team<br />

secretary with Portuguese project<br />

leader (Lisbon)<br />

No of Participants:2<br />

Travel: 2000<br />

Accommodation: 600<br />

Catering: Provided<br />

by<br />

<strong>Portugal</strong><br />

Meeting venue: Provided<br />

by<br />

<strong>Portugal</strong><br />

One Review Meeting (Lisbon)<br />

No of Participants:6<br />

44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!