24.04.2013 Views

1 - Office of Legacy Management

1 - Office of Legacy Management

1 - Office of Legacy Management

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

i<br />

\D<br />

oJWLR Directive 9355.3-01<br />

o Preparing the work plan, the sampling and analysis plan (SAP<br />

(which conrists <strong>of</strong> the quality usururce project plan (QAPP)<br />

and the field srrrpling plan (?SI), the health m d safety<br />

plan, and the c e i t y relationa plan<br />

Chapter 2 descriks the variaur Steps fn the scoping process and gives<br />

general infomation on wrk-planning mothods th8t b ve been effective in<br />

planning and executing past RIRSs.<br />

1.4.2 Site Characterization<br />

During site th.ractorization, ffold sapling md 1rbor8tOy analyses<br />

am hitiat.4. tiald suplfng should bo pbud so that tho ?enrlts <strong>of</strong> the<br />

initial sampl+t9 <strong>of</strong>forts cui bo urd to refa plans doveloped during scopii<br />

to b.t.1: focus subs.quent rrmplhg effortr. Dat. qu8lity objectives are<br />

rovised an appropriate based on an improved understanding <strong>of</strong> the site to<br />

facilitate a more efficient an& accurate characterization <strong>of</strong> the site and,<br />

therefore, achieve reduction8 in ti# and cost.<br />

A preliainrry sit. charactariration suammry is prepared to provide the<br />

lead agoncy with information oa the site ouly in the process b<strong>of</strong>orr prrparr<br />

tion <strong>of</strong> th. full RI roport. This will bo u88ful in dotermining the<br />

feasibility <strong>of</strong> potential toehnologios and in assisting both the lead and<br />

mupport 8goncies vith the initirl identification <strong>of</strong> W. It can also be<br />

sent to A mR to usist that a9oncy in portorring tho hoalth assessment for<br />

the site.<br />

1<br />

Emphasis is placed on rapid turnaround <strong>of</strong> supling results to avoit the<br />

need to remo5ilize and reprocure contractors.<br />

n 1-1 2<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!