24.04.2013 Views

1 - Office of Legacy Management

1 - Office of Legacy Management

1 - Office of Legacy Management

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

0- Directive 935<br />

Trea-nt <strong>of</strong> CERCLA Soils and Sludges (U.S. EPA, Septmbor 1988). Inno-<br />

vative technologies and resource recovery options should be included if they<br />

appau feasible.<br />

To the extent practicable, a prelimbary list <strong>of</strong> broadly defined alter-<br />

natives should k dovelopod that reflects the goal <strong>of</strong> prerenting range <strong>of</strong><br />

distinct, viable option8 to tho docisionmaker. This lirt would therefore<br />

include a rango <strong>of</strong> alternatives in which troatmont that significantly<br />

roducrs tho toxicity, mbility, or volume <strong>of</strong> vast. is a principal element:<br />

one or more rlternativos that involvo contaimnt with little or no treat-<br />

ment: and a no-action alternative. The list rkould bo 1imit.C to only those<br />

alterbtivas that u. relevant and cury 8- significant potential for<br />

king finplomonted at tho site. In this way, the ptelhinary identifieatior.<br />

<strong>of</strong> remadial action8 will allw 8n initial identification <strong>of</strong> AluRs and will<br />

hlp focus aubsaquent drta-gathering <strong>of</strong>fort..<br />

Invo1vamant <strong>of</strong> tho vuiour rgoncior 8t this tim vi11 help in identify-<br />

in9 r8modi.l altorn8tivas md stopin9 fiald activities.<br />

Tho dovelopent <strong>of</strong><br />

altesaatftn8Tr doscribed in .on datail b 0m-r 4 <strong>of</strong> this document.<br />

2.2.4 fvrluate the nod for Treatability Studios<br />

If redial actions involving trm?mont have h en identified for a<br />

rite, thon tho M.8 for tZO8t8bflity 8tUdf.a Bhould b. 8valuated as early as<br />

possible in the procors. This ir bocruse aury troatability studies,<br />

oopacially pilot taitb9, MY tako ~ veral months or longer to complete. If<br />

a lengthy rtodp lr rerod and is not inithtd early, completion <strong>of</strong> the FS<br />

m y k dal8y.d.<br />

Th. initial rctivitior <strong>of</strong> troatability testing include nseuching<br />

other potantially applicablr data, dosigning tho study, urd procuring<br />

vendors and equipnnt. As appropriate, the80 activities rhould occur coz-<br />

currently w ith rito chuactmriration <strong>of</strong>forts 80 that if it is determined<br />

that a potential technology is not feasible, md plannod treatability ac::v:-<br />

ties for this technology can be terminated.<br />

scoping trartability studies.<br />

4 t-12<br />

&<br />

Chapter S provides guida:=e 0:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!