Guidelines for Safety Inspection of Dams - Central Water Commission
Guidelines for Safety Inspection of Dams - Central Water Commission
Guidelines for Safety Inspection of Dams - Central Water Commission
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3.6 Stability, evidence and clues<br />
(1) In concrete and steel structures – tilting, tipping, sliding &<br />
over-turning<br />
(2) In embankment structures, cutslopes natural slopes – bulging,<br />
sloughing, slumping, sliding, cracks & escarpments<br />
(3) In rock cutslopes, foundation and unlined tunnels – slumps,<br />
slides, rockfalls, bulges & cracks<br />
4. OPERATION AND MAINTENANCE<br />
4.1 Service reliability <strong>of</strong> outlet, spillway sump pump mechanical –<br />
electrical features<br />
(1) Broken or disconnected lift chains and cables<br />
(2) Test operation including auxiliary power sources<br />
(3) Reliability and service connections <strong>of</strong> primary sources<br />
(4) Verification <strong>of</strong> operators understanding and ability to operate<br />
(5) Case and assurance <strong>of</strong> access to control stations<br />
(6) Functioning <strong>of</strong> lubrication systems<br />
4.2 Gate chamber, galleries, tunnels and conduits<br />
(1) Ventilation and heat control <strong>of</strong> damp, corrosive environment <strong>of</strong><br />
mechanical-electrical equipment.<br />
4.3 Accessibility and visibility<br />
(1) Obscuring & vegetal overgrowth<br />
(2) Galleries-access ladders & lighting<br />
(3) Access roads and bridges<br />
(4) Communication and remote control lines, cables and<br />
telemetering systems<br />
4.4 Control <strong>of</strong> vegetation and burrowing animals<br />
(1) Harmful vegetation in embankments-oversize & dead root<br />
channels<br />
(2) Harmful vegetation in structural concrete joints<br />
(3) Obstructing vegetal growth in hydraulic flow channels<br />
(4) Ground squirrels, rats and beavers<br />
5. BEHAVIOUR<br />
5.1 Every attempt should be made to anticipate and have engineerobservers<br />
present on site at items <strong>of</strong> large spillway and outlet<br />
51