25.04.2013 Views

Guidelines for Safety Inspection of Dams - Central Water Commission

Guidelines for Safety Inspection of Dams - Central Water Commission

Guidelines for Safety Inspection of Dams - Central Water Commission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(2) New vegetal growth<br />

(3) Seepage and leakage<br />

(4) Boils<br />

(5) Saturation patterns on slopes, hillsides and in streambed<br />

(6) Depressions and sinkholes<br />

(7) Evidence <strong>of</strong> high escape gradients.<br />

7.4 Erosion control<br />

(1) Loss, displacement & deterioration <strong>of</strong> upstream face riprap,<br />

underlayment and downstream face slope protection.<br />

(2) Leaching<br />

7.5 Foundation<br />

(1) See 6.5 also<br />

(2) Consolidation<br />

(3) Liquefaction<br />

7.6 Other endangerments<br />

(1) Utility pressure conducts on, over or through embankments.<br />

(2) Diversion ditches along abutment hillsides.<br />

8 SPILLWAYS<br />

8.1 Approach channel<br />

(1) Obstructions<br />

(2) Slides slumps and cracks & cutslopes<br />

8.2 Log booms<br />

(1) Submergence<br />

(2) Uncleared accumulated drift<br />

(3) Parting<br />

(4) Loss <strong>of</strong> anchorage<br />

(5) Inadequate sleck <strong>for</strong> low reservoir stages.<br />

8.3 Hydraulic control structure<br />

(1) Stability<br />

(2) Retention <strong>of</strong> capacity rating<br />

(3) Erosion at toe<br />

(4) Unauthorized installations on crest, raising storage level and<br />

decreasing spilling capacity.<br />

55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!