26.04.2013 Views

Esha Universal Future Proof Roofing - RIBA Product Selector

Esha Universal Future Proof Roofing - RIBA Product Selector

Esha Universal Future Proof Roofing - RIBA Product Selector

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Esha</strong> is part of the largest membrane<br />

manufacturing group in the World with<br />

an ongoing commitment to producing<br />

increasingly environmentally friendly<br />

waterproofing membranes. The continual<br />

demand on Earth’s finite resources has driven<br />

the <strong>Esha</strong> Group to seek out even more diverse<br />

raw materials to increase the use of recycled<br />

post-use consumer waste. In pursuing this<br />

course over many years, <strong>Esha</strong> now lead the<br />

market and have contributed greatly to the<br />

reduction of wasteful landfill disposal and<br />

improvement in the sustainability of their<br />

membranes.<br />

The <strong>Esha</strong> philosophy is simply to provide the<br />

best solution at an affordable price whilst<br />

incorporating the best service with the most<br />

appropriate product thereby protecting the<br />

roof, protecting the client, and protecting the<br />

environment.<br />

UNIVERSAL DETAIL TOOLS ESHA GUN ROOFLIGHTS ROOF OUTLETS<br />

<strong>Esha</strong> (UK) Ltd,<br />

<strong>Esha</strong> House, St. Mary’s Business Park, Albany Road, Market Harborough, Leics LE16 7EB<br />

Tel: 01858-410372 • Fax: 01858-410572<br />

Email: sales@esha.co.uk • www.esha.co.uk<br />

CI/SFB (47) Ln6<br />

Sustainable Roof<br />

Membrane<br />

<strong>Esha</strong> <strong>Universal</strong><br />

<strong>Future</strong> <strong>Proof</strong> <strong>Roofing</strong>


<strong>Esha</strong> <strong>Universal</strong> has changed<br />

the way we think about <strong>Roofing</strong><br />

ESHA UNIVERSAL is a new standard<br />

of roofing when it comes to quality<br />

and environmental care, it is a unique<br />

type of membrane more flexible and<br />

stronger than conventional roofing<br />

with greater stability and durability.<br />

<strong>Universal</strong> owes its outstanding<br />

performance to its extraordinary<br />

composition and homogenic<br />

character: a POCB compound<br />

reinforced with polyester and<br />

stabilised with glass. To manufacture<br />

this unique product a new<br />

production method has been<br />

developed and patented.<br />

ESHA UNIVERSAL has been created<br />

in response to the growing demand<br />

for products that contribute to<br />

reduced energy consumption and<br />

damage to the environment. It can<br />

be easily installed in various one-layer<br />

applications and most importantly<br />

ESHA UNIVERSAL is totally recyclable.<br />

ESHA UNIVERSAL has been subject<br />

to Life Cycle analysis involving rigid<br />

test in the total life cycle of the<br />

product and its environmental<br />

impact. The research proved that<br />

by selecting <strong>Universal</strong>, impact on<br />

the environment is greatly reduced.<br />

The European Agrément certificate<br />

K1190 attests to the performance<br />

and quality of <strong>Esha</strong> <strong>Universal</strong> and<br />

the suitability of the membrane in<br />

a given roofing system.<br />

Of course even with a unique roofing<br />

system as <strong>Universal</strong>, <strong>Esha</strong> still<br />

guarantee the product against failure<br />

and consequential damage. Where<br />

required an All In Guarantee is<br />

available which also protects against<br />

failure of the contractor or supplier<br />

and even the client’s surveyor<br />

costs and removal of site debris<br />

are included.<br />

Everyone agrees CO2 reduction is a key<br />

to sustainability for the planet, <strong>Esha</strong><br />

already achieve this with their bitumen<br />

balance programme. Independent<br />

research verifies that recycled content<br />

incorporated in 1m2 of <strong>Esha</strong> roof<br />

membrane equates to a reduction<br />

in CO2 generated, equivalent to that<br />

emitted whilst driving 1km in a car.<br />

The current process is optimised in<br />

phase 1 at 40% recycled content.<br />

(Source TNO Nederland’s Organisation<br />

for Applied Science.)<br />

The European Life programme has<br />

co-funded many projects developing<br />

solutions to environmental issues.<br />

<strong>Esha</strong>’s development of recycling<br />

facilities for waste roofing<br />

membranes has earned a grant of<br />

11.25 million to further improve and<br />

expand this facility to demonstrate<br />

technically and economically a<br />

feasible alternative to incineration<br />

and landfill. <strong>Esha</strong> expects to move<br />

current volumes of 12,000 tonnes<br />

recycling to 50,000 tonnes in year<br />

three of the programme.<br />

<strong>Esha</strong> built it’s first recycling plant in<br />

1994. In year 07 capacity will reach<br />

12,000 tons per year enabling many<br />

products to contain upwards of 40%<br />

recycled content. To protect the future<br />

<strong>Esha</strong> <strong>Universal</strong> is designed to be<br />

totally recyclable which means no<br />

harmful chemicals or heavy metals are<br />

used in the product. This means that<br />

virtually every ton of <strong>Universal</strong><br />

removed from a roof in 30 or 40 years<br />

time will be reusable. This completes<br />

the virtuous circle of bitumen balance<br />

by recovering earth’s resources and<br />

reusing them time and time again.<br />

<strong>Esha</strong> <strong>Universal</strong> Roof System<br />

Suited to every roof situation<br />

Wind Power Superstore<br />

Commercial Housing<br />

Megastore Transport


Standard details - ESHA UNIVERSAL<br />

Roof edge with upstand and metal capping<br />

1. Substrate / deck<br />

2. Vapour control layer if necessary<br />

3. Thermal insulation<br />

4. Apply ESHA UNIVERSAL with<br />

a minimum of 50 mm to<br />

upstand; perimeter fixings at<br />

250 mm centres<br />

Abutment<br />

1. Substrate / deck<br />

2. Vapour control layer if necessary<br />

3. Thermal insulation<br />

4. Apply ESHA UNIVERSAL with<br />

a minimum of 50 mm to<br />

upstand; perimeter fixings at<br />

250 mm centres<br />

5. Flashing of ESHA UNIVERSAL<br />

minimum 150 mm to vertical<br />

face and 150 mm to roof surface<br />

6. Capping base plate<br />

7. Metal capping<br />

5. Flashing of ESHA UNIVERSAL<br />

from underside of lead cover<br />

flashing 150 mm to roof surface<br />

6. Lead cover flashing and cavity<br />

tray (subject to local preferences /<br />

regulations)<br />

Breather- or ventilation pipe (insulated)<br />

1. Substrate / deck<br />

2. Vapour control layer if necessary<br />

3. Thermal insulation (around<br />

penetration to local regulations)<br />

4. Top layer ESHA UNIVERSAL<br />

5. Pipe flange (6) in cold bituminous<br />

adhesive<br />

6. Breather / ventilation pipe<br />

with flange<br />

7. Flashing of ESHA UNIVERSAL<br />

extending minimum 150 mm<br />

beyond pipe flange<br />

Internal rainwater outlet<br />

1. Substrate / deck<br />

2. Vapour control layer if necessary<br />

3. Thermal insulation (around<br />

penetration to local regulations)<br />

4. Flashing of ESHA UNIVERSAL<br />

5. Outlet flange (6) in cold<br />

bituminous adhesive<br />

Movement joint<br />

1. Substrate / deck<br />

2. Apply ESHA UNIVERSAL with a<br />

minimum of 50 mm to upstand<br />

3. Apply strips ESHA UNIVERSAL<br />

4. Extruded Polyethylene-foam, with<br />

a thickness of approx. 12 mm<br />

6. Internal rainwater outlet and<br />

flange<br />

7. Weld top layer ESHA UNIVERSAL<br />

with hot air and pressure roller<br />

5. <strong>Esha</strong>Base-strip over Polyethylenefoam<br />

6. ESHA UNIVERSAL taken across<br />

the joint minimum 150 mm onto<br />

the roof surface<br />

Zonal control junction<br />

(To localise water tracking of leaks in large roofs)<br />

1. Substrate / deck<br />

2. Vapour control layer if necessary<br />

3. Thermal insulation<br />

Band + strip method<br />

Where deck or construction prevents<br />

implementing minimum fastener<br />

ratio, in edge or corner-zones for<br />

instance, increased attachment can<br />

be achieved by the band + strip<br />

method. 350 mm wide subject to<br />

local conditions<br />

4. At the junction, adhere band<br />

of ESHA UNIVERSAL to the<br />

vapour control layer<br />

5. Hot air weld ESHA UNIVERSAL<br />

to previous band


<strong>Universal</strong> Systems<br />

One layer<br />

mechanically fastened<br />

Substrate<br />

Steel<br />

Timber (boarding / plywood)<br />

Concrete<br />

Existing roof surface<br />

Vapour control layer<br />

Depending on condensation risk calculation<br />

Apply according to local practice<br />

Laps depending on type of VCL: Generally longitudinal<br />

laps 100 mm, head laps 100 mm<br />

Insulation<br />

Install <strong>Esha</strong>Therm insulation according to local practice in<br />

broken bond<br />

Waterproofing<br />

ESHA UNIVERSAL mechanically with <strong>Esha</strong> fasteners, every<br />

250 mm or as local conditions / regulations<br />

Edge and corner-zones, where wind load calculations<br />

demands exceed 4 fasteners per metre, use band + strip<br />

method (see standard details)<br />

Weld laps with <strong>Esha</strong>Weld hot-air machine: longitudinal<br />

laps 130 mm head laps 100 mm<br />

Apply ESHA UNIVERSAL with a minimum of 50 mm to<br />

upstands<br />

Flashing of ESHA UNIVERSAL minimum 150 mm onto<br />

vertical and 150 mm to flat<br />

Note: Where the building exceeds 30 metres high, install<br />

an attachment layer of <strong>Esha</strong>Base Sanded with special <strong>Esha</strong><br />

fasteners, longitudinal laps 70 mm, head laps 100 mm,<br />

according to local regulations. Fully bond ESHA UNIVERSAL<br />

to <strong>Esha</strong>Base with ESHA UNIVERSAL Cold Adhesive. Weld laps<br />

with <strong>Esha</strong>Weld hot-air machine: longitudinal laps 80 mm<br />

head laps 100 mm.<br />

One layer<br />

loose laid ballasted<br />

Substrate<br />

Steel<br />

Timber (boarding / plywood)<br />

Concrete<br />

Existing roof surface<br />

Vapour control layer<br />

Depending on condensation risk calculation<br />

Apply according to local practice<br />

Laps depending on type of VCL: Generally longitudinal<br />

laps 100 mm, head laps 100 mm<br />

Insulation<br />

Install <strong>Esha</strong>Therm insulation according to local practice in<br />

broken bond<br />

Waterproofing<br />

Loose lay <strong>Esha</strong> <strong>Universal</strong><br />

Weld laps with <strong>Esha</strong>Weld hot-air machine: longitudinal<br />

laps 80 mm, head laps 100 mm<br />

Apply <strong>Esha</strong> <strong>Universal</strong> with a minimum of 50 mm to<br />

upstands<br />

Flashing of <strong>Esha</strong> <strong>Universal</strong> minimum 150 mm to vertical<br />

face and 150 mm to roof surface<br />

Ballast<br />

Install pebbles or paving on pads according to local<br />

preferences/regulations<br />

Note: At the end of its service life <strong>Esha</strong> <strong>Universal</strong> can be<br />

easily overlaid<br />

One layer loose laid ballasted<br />

as inverted roof<br />

Substrate<br />

Steel<br />

Timber (boarding / plywood)<br />

Concrete<br />

Existing roof surface<br />

Waterproofing membrane<br />

Loose lay ESHA UNIVERSAL<br />

Thermally weld laps with hot-air welding machine or<br />

overlap torch: longitudinal laps 80 mm and head laps<br />

100 mm<br />

Insulation<br />

Install <strong>Esha</strong>Therm insulation according to local practice in<br />

broken bond<br />

Waterproofing<br />

Loose lay ESHA UNIVERSAL<br />

Weld laps with <strong>Esha</strong>Weld hot-air machine: longitudinal<br />

laps 80 mm head laps 100 mm<br />

Apply ESHA UNIVERSAL with a minimum of 50 mm to<br />

upstands<br />

Flashing of ESHA UNIVERSAL minimum 150 mm to vertical<br />

face and 150 mm to roof surface<br />

Ballast<br />

Install pebbles or paving on pads according to local<br />

preferences/regulations<br />

Note: At the end of its service life ESHA UNIVERSAL can<br />

be easily overlaid<br />

One layer overlay<br />

cold adhesive<br />

Substrate<br />

Existing roof surface<br />

Pre-treatment<br />

Dry, level and clean existing roof surface<br />

Coat the existing roof surface with <strong>Esha</strong>Prime<br />

Vapour control layer<br />

Depending on condensation risk calculation<br />

Apply according to local practice<br />

Laps depending on type of VCL: Generally longitudinal<br />

laps 100 mm, head laps 100 mm<br />

Insulation<br />

Install <strong>Esha</strong>Therm insulation according to local practice in<br />

broken bond<br />

Waterproofing<br />

Adhere <strong>Esha</strong> <strong>Universal</strong> fully with <strong>Esha</strong> <strong>Universal</strong> Cold<br />

Adhesive<br />

Apply <strong>Esha</strong> <strong>Universal</strong> Cold Adhesive with a hard rubber<br />

squeegee (usage 800-1000 gr/m2)<br />

Apply <strong>Esha</strong> universal with staggered end laps<br />

Thermally weld laps with <strong>Esha</strong>Weld hot-air machine:<br />

longitudinal laps 80 mm head laps 100 mm<br />

Apply <strong>Esha</strong> <strong>Universal</strong> with a minimum of 50 mm to<br />

upstand<br />

Flashing of <strong>Esha</strong> <strong>Universal</strong> minimum 150 mm to vertical<br />

150mm to flat

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!