27.04.2013 Views

Kalzip® in Scotland

Kalzip® in Scotland

Kalzip® in Scotland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

16. Dalkeith Schools Community Campus, Ed<strong>in</strong>burgh<br />

The strik<strong>in</strong>g contrast of the Kalzip<br />

alum<strong>in</strong>ium roof aga<strong>in</strong>st the ‘fire eng<strong>in</strong>e<br />

red’ of the w<strong>in</strong>dow frames and structural<br />

details gives New Craighall Fire Station<br />

<strong>in</strong> East Ed<strong>in</strong>burgh a dist<strong>in</strong>ctive yet eye<br />

catch<strong>in</strong>g appearance.<br />

Look<strong>in</strong>g like a fly<strong>in</strong>g saucer on its<br />

widest side, the one-storey build<strong>in</strong>g is<br />

fan-shaped to allow access from a short<br />

18 Kalzip <strong>in</strong> <strong>Scotland</strong><br />

More than 18,000 square metres of<br />

Kalzip were specified for this<br />

extensive campus accommodat<strong>in</strong>g<br />

Dalkeith High School, St. David’s<br />

Roman Catholic High School and<br />

Saltersgate Special School. The PFI<br />

development was built by ma<strong>in</strong><br />

contractor HBG Construction<br />

<strong>Scotland</strong> Ltd and will be managed<br />

by HBG Facilities Management for<br />

30 years.<br />

With a strik<strong>in</strong>g curved shape, the<br />

central communal build<strong>in</strong>g is almost<br />

130 metres across and is covered<br />

with some of the longest Kalzip<br />

sheets ever supplied. To facilitate the<br />

17. New Craighall Fire Station, Ed<strong>in</strong>burgh<br />

central corridor to all the fire station’s<br />

facilities. The complex design of the<br />

build<strong>in</strong>g <strong>in</strong>volved a 3 tiered roof with the<br />

lower 2 tiers separated by glaz<strong>in</strong>g and a<br />

small step built <strong>in</strong>to the upper tier to<br />

adapt the taper to the tighter diameter.<br />

To accommodate the geometries of the<br />

roof Briggs Roof<strong>in</strong>g and Cladd<strong>in</strong>g Ltd<br />

<strong>in</strong>stalled 500 square metres of tapered<br />

<strong>in</strong>stallation process the Kalzip mobile<br />

roll-former was erected on scaffold<strong>in</strong>g<br />

at eaves level so the sheets could be<br />

carried <strong>in</strong>to place, fixed and zipped as<br />

soon as they were produced.<br />

Architects:<br />

Keppie Design Ltd<br />

Ma<strong>in</strong> contractor:<br />

HBG Construction<br />

Approved Teamkal contractor:<br />

Lakesmere Ltd<br />

Kalzip sheets and a further 250 square<br />

metres of straight sheets <strong>in</strong> a stucco<br />

embossed f<strong>in</strong>ish.<br />

Architect:<br />

Glasgow City Council<br />

Property Services Department<br />

Approved Teamkal contractor:<br />

Briggs Roof<strong>in</strong>g and Cladd<strong>in</strong>g Ltd

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!