Marshalling his troops - Pitchcare
Marshalling his troops - Pitchcare
Marshalling his troops - Pitchcare
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Preparing for Monster Trucks<br />
NOVO party<br />
Speedway<br />
Les Miserables - well, you would be!<br />
It’s only Rock and Roll ...<br />
74<br />
“Developing a positive approach,<br />
and appreciating the commercial<br />
responsibilities of our business,<br />
is important to progress the turf<br />
industry”<br />
installation. Allowing production to<br />
go ahead with their event, without<br />
limitations and stressed grounds<br />
persons, can be beneficial to all.<br />
Under Pressure<br />
2009 was another successful year in<br />
Parken. FCK were champions,<br />
Denmark qualified for the World<br />
Cup and the pitch performed<br />
consistently well.<br />
Challenges faced by the grounds<br />
team were motivational and many. A<br />
relaxed spring season, with football<br />
and one exhibition being our only<br />
customer, the autumn calendar was<br />
set to entertain the locals. The<br />
schedule for the newly installed<br />
pitch would include concerts, a<br />
dinner party, and be finished off<br />
with a rave at the end of October,<br />
which required covering the pitch<br />
with steel plating.<br />
The timeframe for the installation<br />
was limited, when we received the<br />
pitch back from Britney on July12th.<br />
We installed a pitch on the 13-<br />
14th, and staged Champions League<br />
on the 15th July.<br />
FCK then played at home on 1st<br />
August. Madonna sang like a virgin<br />
on the 11th August.<br />
Madge’s production wrote off the<br />
penalty area, so we stripped and<br />
relaid the area (1500m2 ) ready for<br />
training on the 14th, with a home<br />
game on the 15th. T<strong>his</strong> was followed<br />
by a Champions League match on<br />
the 18th.<br />
On the 21st August, we staged<br />
NOVO, a dinner party with up to<br />
10,000 diners on the pitch.<br />
September was uneventful, with a<br />
local football ‘super league’, a World<br />
Cup qualifier and a few training<br />
sessions.<br />
However, the following few weeks<br />
was a different story!<br />
1st - Europa League<br />
4th - Danish Super league<br />
8th - Fleetwood Mac<br />
10th - Denmark v Sweden WCQ<br />
14th - Denmark v Hungry WCQ<br />
17th - Bavarian rock concert<br />
25th - Super League<br />
26th - Muse<br />
31st - Rave<br />
5th Nov - Europa League<br />
The rave would stress the pitch to<br />
the extent we would need time to<br />
recover the damage. The calendar<br />
limited our renovations and,<br />
therefore, the option to replace the<br />
turf was scheduled. T<strong>his</strong> enabled<br />
Muse to put on a show on the<br />
Monday, leaving the pitch<br />
protection covers on, to reduce the<br />
costs and increase the revenue.<br />
Work commenced removing the<br />
pitch on November 2nd, and it was<br />
installed ready for training on the<br />
4th.<br />
The autumn/winter pitch staged<br />
two concerts in December, and the<br />
X Factor in March 2010.<br />
Relax<br />
FCK claimed the title at Parken in<br />
May 2010. After the final w<strong>his</strong>tle the<br />
gates were opened and the crowd<br />
enjoyed a free for all on the pitch. A<br />
stage and safety barrier had been<br />
pre-rigged outside and driven into<br />
position on a goalmouth for the<br />
celebration party.<br />
The schedule for the 2010<br />
summer events consisted of:<br />
May 16th - FCK final league match<br />
May 22nd/23rd - Monster trucks<br />
(grass recoverable)<br />
May 29th - Rave (terraplas,<br />
recoverable)<br />
June 5th - Speedway (9 days<br />
production, roof closed for the<br />
duration, removal and establishment<br />
of plant required)<br />
July 16th - Stevie Wonder concert<br />
July 17th - Danish league fixture<br />
July 25th - Pink concert<br />
July 27th - Champions League<br />
fixture<br />
August 1st - Danish league<br />
August 4th - Champions League<br />
fixture<br />
August 11th - Denmark v Germany<br />
Considering the schedule, it was cost<br />
effective to hand over the stadium to<br />
the operations department.<br />
The installation for the new turf<br />
was set for June 23rd, to enable time<br />
to settle the pitch and allow the<br />
grass to strengthen ahead of the<br />
scheduled concerts.<br />
In consultation with the<br />
operations department, the decision<br />
was made to install a further pitch<br />
on July 26th, after the load out from<br />
Pink.<br />
The installation was completed on<br />
Monday July 27th, ready for prematch<br />
training on the Friday.<br />
Roll With It<br />
Selecting the turf, preparing and<br />
planning the installation are crucial<br />
to the success of the playing surface.<br />
Rooting is the key to the success of<br />
the turf system. To achieve sufficient