Minutes of the 6th meeting of the State Level Expert Appraisal ...

Minutes of the 6th meeting of the State Level Expert Appraisal ...

Minutes of the 6th meeting of the State Level Expert Appraisal ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(1) (2) (3) (4)<br />

12 (S.no., 50 <strong>of</strong> <strong>the</strong> first<br />

<strong>meeting</strong> held on 12 th<br />

June 2008)<br />

14 (S.no. 18 <strong>of</strong> <strong>the</strong><br />

fourth <strong>meeting</strong> held on<br />

16 th October 2008)<br />

Lush County, Wagholi B(2) The project proponent stated that <strong>the</strong>y have<br />

not so far been able to get <strong>the</strong> consent <strong>of</strong><br />

Irrigation Department to supply water from <strong>the</strong><br />

Irrigation tank. They have also not so far got<br />

<strong>the</strong> consent <strong>of</strong> <strong>the</strong> large number <strong>of</strong> farmers<br />

through whose lands <strong>the</strong> pipeline is to be laid.<br />

The project proponent stated that <strong>the</strong>ir efforts<br />

in both <strong>the</strong>se directons were going on.<br />

Ascendas IT Park Pune<br />

Pvt Ltd<br />

The Committee considered <strong>the</strong> matter and<br />

found that even more than six months after<br />

making <strong>the</strong> presentation to <strong>the</strong> Committee and<br />

<strong>the</strong> project proponent committed to get<br />

consent for water and related matters, <strong>the</strong>re<br />

has been no progress. Since <strong>the</strong> project<br />

cannot be taken up unless <strong>the</strong>re is assured<br />

supply <strong>of</strong> water, it was decided to close <strong>the</strong><br />

case. In case <strong>the</strong> project proponent does<br />

succeed in future to tie up all necessary<br />

arrangements for supply <strong>of</strong> water, <strong>the</strong> case<br />

can <strong>the</strong>n be reopened.<br />

B(2) The points on which compliance was to be<br />

submitted were not indicated to <strong>the</strong> project<br />

proponent earlier. Now it was indicated to<br />

<strong>the</strong>m to furnish compliance in respect <strong>of</strong> <strong>the</strong><br />

following:<br />

(i) Correct FSI calculations as per <strong>the</strong> already<br />

approved norms (instead <strong>of</strong> anticipated which<br />

is yet to be approved).<br />

(ii) Redesign <strong>the</strong> total project (based on <strong>the</strong><br />

realistic FSI as mentioned in (i) above)<br />

including parking, water requirement, waste<br />

disposal etc.<br />

(iii) Restriction <strong>of</strong> <strong>the</strong> punctures from <strong>the</strong><br />

highway to two instead <strong>of</strong> four.<br />

(iv) Justification for <strong>the</strong> proposed parking in<br />

accordance with <strong>the</strong> approved norms.<br />

(v) Impact <strong>of</strong> <strong>the</strong> proposed development on<br />

existing air quality and proposed measures to<br />

mitigate <strong>the</strong> same.<br />

(vi) Redesign <strong>the</strong> recharge pit for rainwater<br />

harvesting on a realistic basis as per norms.<br />

(vii) Redesign <strong>the</strong> internal roads taking into<br />

account <strong>the</strong> fire fighting requirement.