Deepwater development The ultimate frontier - Total.com
Deepwater development The ultimate frontier - Total.com
Deepwater development The ultimate frontier - Total.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
06<br />
DeePWaTer DeVeloPmenT<br />
s<br />
<strong>Total</strong> continues to consolidate<br />
its leadership in nigeria, with the<br />
akpo and usan field <strong>development</strong>s.<br />
<strong>The</strong> triumphs of Block 17<br />
<strong>The</strong> Group has scored spectacular<br />
exploration success in Angola’s<br />
deepwater Block 17, with some<br />
fifteen discoveries since 1996.<br />
<strong>The</strong> <strong>development</strong> of these fields<br />
is currently focusing on three<br />
production zones:<br />
– Girassol has included<br />
production from Jasmim since<br />
November 2003, Rosa will be<br />
//. ChaLLeNGes<br />
at the fOrefrONt<br />
of <strong>The</strong> inDuSTry<br />
s s s<br />
Constant innovation building on the Group’s many<br />
deepwater achievements forges <strong>Total</strong>’s leading edge.<br />
angola’s Girassol field lies in water depths of 1,400 meters. <strong>Total</strong><br />
brought this deepwater giant on stream at end 2001, signaling the<br />
Group’s expertise in the mastery of such <strong>com</strong>plex projects as well as the<br />
technological challenges of deepwater production. <strong>The</strong>se feats earned<br />
<strong>Total</strong> the industry’s highest awards for excellence. in 2003, the Jasmim<br />
field was tied back to the Girassol fPSo (floating Production, Storage<br />
and offloading vessel). <strong>The</strong> success of Girassol and the Jasmim satellite<br />
<strong>development</strong> paved the way for other ambitious projects like Dalia, the<br />
new benchmark for the <strong>development</strong> of angola’s deep offshore. Dalia<br />
came on stream at end 2006 and should reach a plateau production<br />
level of 240,000 b/d in 2007. Building on this know-how, the Group has<br />
scored further breakthroughs in angola’s Block 17 but also in the Gulf of<br />
mexico, with matterhorn and Canyon express. To achieve these multiple<br />
victories, <strong>Total</strong> developed new-generation, giant fPSo vessels, special<br />
riser towers and flexible risers, purpose-designed subsea installations<br />
and “smart <strong>com</strong>pletions.” <strong>The</strong> Group is now proving its leadership<br />
through a continuing series of deepwater and ultra-deepwater<br />
<strong>development</strong>s in Congo (moho Bilondo), angola (Pazflor, CloV, and<br />
Block 32), and nigeria (akpo and usan).<br />
Drawing on the <strong>com</strong>prehensive expertise of its r&D teams and its<br />
culture of constant innovation, <strong>Total</strong> is over<strong>com</strong>ing technological barriers<br />
to implement increasingly <strong>com</strong>plex <strong>development</strong>s and optimize project<br />
profitability. major research objectives are “all-electric” subsea systems<br />
and subsea gas/liquids separators to boost recovery rates, the aim<br />
being to have the deep offshore contribute 10% to Group-operated oil<br />
production by 2008. nnn<br />
tied into the system in 2007;<br />
– Dalia is in the process of<br />
installation, and first oil was<br />
achieved on December 13, 2006;<br />
– Pazflor, now in the front-end<br />
study phase, will pool production<br />
from Perpetua, Zinia, Hortensia,<br />
and Acacia.<br />
By 2011, these three zones<br />
together are expected to produce<br />
700,000 b/d. A fourth production<br />
zone is under consideration<br />
at present, with the construction<br />
of a stand-alone FPSO for the<br />
<strong>development</strong> of Cravo, Lirio,<br />
Orquidea, and Violeta (CLOV).<br />
Plans call for these fields<br />
to be successively tied back,<br />
guaranteeing a stable<br />
production level.