Geologic And Hydrologic Factors Governing ... - Gunnison County
Geologic And Hydrologic Factors Governing ... - Gunnison County
Geologic And Hydrologic Factors Governing ... - Gunnison County
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Geologic</strong> <strong>And</strong> <strong>Hydrologic</strong> <strong>Factors</strong> <strong>Governing</strong> Impacts Of Development<br />
On The Crystal River Near Marble, Colorado<br />
<strong>Gunnison</strong> <strong>County</strong>, Colorado<br />
5.4 Summary of <strong>Gunnison</strong> <strong>County</strong> Individual Sewage Disposal System (ISDS)<br />
Regulations<br />
The promulgation and enforcement by <strong>Gunnison</strong> <strong>County</strong> of regulations for ISDSs are authorized by<br />
state law, mainly CRS 25-10-101, 29-20-101, 30-21-101, 30-15-401, 30-20-101, 30-28-101 and 30-<br />
28-102. These Regulations are an integral part of a comprehensive land use sanitation, public works<br />
and public health, safety and welfare regulatory process in <strong>Gunnison</strong> <strong>County</strong>. The general policies<br />
of <strong>Gunnison</strong> <strong>County</strong> are to have consistent, plentiful and clean water, to protect the water resources<br />
for the purpose of maintaining the high quality of the water-dependent environment in the county,<br />
and to not adversely affect the availability or suitability of water for present or future uses in the<br />
county.<br />
The following summarizes the pertinent regulations aimed at achieving their policies. The reader,<br />
before considering construction of a septic leaching system, is referred to the <strong>Gunnison</strong> <strong>County</strong><br />
ISDS regulations as of June 20, 1995. Those factors which are underlined in the following discus-<br />
sion are those which are addressed in this report.<br />
1. An ISDS permit is required and a building permit will not be issued until an ISDS permit has<br />
been issued or the house is connected into a central sewage disposal system. While each ap-<br />
plication regarding an ISDS will be evaluated in the context of the site and land use it is pro-<br />
posed to service, the issuance of an ISDS permit is not a guarantee that a <strong>County</strong> Land Use<br />
Change Permit, Building Permit, Driveway Permit or other required permit will be issued for<br />
a related project, nor is the issuance of any other required permit a guarantee of the issuance<br />
of an ISDS permit.<br />
2. After application for a permit, a site inspection is required to evaluate the size of the prop-<br />
erty, a verification of the groundwater table, suitability of the soil, depth to bedrock, ground<br />
slope, the location of water supply systems, the location of the disposal system with refer-<br />
ence to water courses, lakes, ditches, structures and other pertinent physical and environ-<br />
mental features. A determination of the general soils, geology, and hydrology, and an<br />
evaluation of the soil where the percolation tests are located are required.<br />