MEETING MINUTES - blogs - Oregon State University
MEETING MINUTES - blogs - Oregon State University
MEETING MINUTES - blogs - Oregon State University
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Send Larrie SD Wrap-Up Documents list<br />
SEC<br />
Provide updated sketches of each level for June 15 SD Wrap-Up Package<br />
MU<br />
Provide dimensioned food service plan for Robyn (Option 2D)<br />
Confirm vestibules needed for north porch with PAE<br />
Provide updated sketches for June 15 SD Wrap-Up Package<br />
LEED/Sustainability:<br />
Review credits discussed and update checklists<br />
Prep for sustainability workshop for DD<br />
Craft Center<br />
Update plan, program areas based on SAPC recommendation<br />
Andersen Action Items:<br />
Update MU VE “menu” options<br />
Review project schedule<br />
Determine antenna cost<br />
Page 2 of 4<br />
04.11.2012<br />
4509-01<br />
<strong>MEETING</strong> <strong>MINUTES</strong>:<br />
Pre-Meeting:<br />
Opsis will coordinate budget review meeting in Portland in the next 2 weeks<br />
CPC has cancelled the June 25 meeting. Larrie to confirm new date. Michael mentioned the MU<br />
will want to get into the CPC sooner rather than later. Date needs to be confirmed.<br />
Andersen will have MUE costing update early next week<br />
Opsis will provide a canopy design narrative to the CPC<br />
Overall schedule needs more review and input from OSU, opsis, ACCO<br />
July 11 is target start date for DD meetings at OSU.<br />
SEC:<br />
Food service in NW Corner or SW corner presented<br />
o Outcome of discussion is no food service in SEC. Suggest plumbing IRC to support<br />
coffee house events, etc. This would include a sink and countertop—i.e. small galley<br />
kitchen.<br />
Fee-Impact Committee needs to determine whether revenue generation is needed in SEC. If<br />
there is no food service revenue then some alternatives floated included satellite bookstore space<br />
or other retail.<br />
East vestibule access not needed into IRC<br />
o Opsis to confirm second exit requirements<br />
DJ booth status in lounge is still TBD – OSU to confirm<br />
Stair 3 study (moving east one bay) was discussed<br />
o Stair 3 will stay in its current location<br />
o Opsis will work on furniture layouts for lounges in DD to give a better idea of how to<br />
program open spaces<br />
Level 3 – for SD wrap-up the conference room will stay where it is. All offices capped at 150 SF.<br />
In DD opsis will study how AABC and ASOSU Legal (OA/LA) might take advantage of flex space.<br />
SIFC office on Level 2 needs to move – this will be updated in DD.<br />
Level 4 – reception and equipment checkout will be flipped so reception is at the end of the<br />
hallway that goes north-south<br />
opsis architecture LLP