MEETING MINUTES - blogs - Oregon State University
MEETING MINUTES - blogs - Oregon State University
MEETING MINUTES - blogs - Oregon State University
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Page 4 of 4<br />
04.11.2012<br />
4509-01<br />
Craft Center/Basement:<br />
Opsis presented diagrams showing the history of basement space allocation<br />
o The Craft center space has increased while storage space has decreased. The Space<br />
Allocation and Planning Committee (SAPC) will review program needs and provide final<br />
square footage<br />
Sid would like to keep MU storage (1500 SF) for now<br />
Retail storage (500 SF) is TBD, pending outcome of Student Fee Impact Committee revenue<br />
analysis<br />
The Craft Center provided an updated layout based on Option 3 (presented on 5/23).<br />
Bathroom access is a concern. CC would prefer to shorten the distance from the CC to restrooms<br />
for safety reasons.<br />
After-hours access with key cards was a concern to CC<br />
Accessibility in the CC was brought up at the Accessibility Workshop on 5/23. Kent has engaged<br />
the Disability Access Services group on campus to review the space<br />
Opsis will update the plan, square-footage numbers and program spreadsheet based on info from<br />
the SAPC<br />
Ventilation requirements will be reviewed with PAE in DD<br />
Wrap-Up:<br />
Next steps include understanding hours of operation, security, access, recycling program etc.<br />
East entry appears to be a good after-hours entry because of its proximity to the elevators. There<br />
will need to be a gate preventing access to the rest of the building and a security camera.<br />
OSU needs to understand the financial impact of the antenna on the SEC in order to determine<br />
whether it is in or out of the project<br />
DD meetings will get into building system development as well as individual group meetings to<br />
work out office spaces. Larrie proposed coming to Portland on alternate Wednesdays to review<br />
building systems so time in Corvallis can be spent with user groups.<br />
Andersen would like to meet with KPFF to work through VE list (braced frames are a big cost<br />
item)<br />
PAE needs to assist the MU with water volume concerns<br />
Opsis will look into LEED-EB for the MU<br />
Opsis will coordinate technology consultant review in Portland with Larrie<br />
Opsis will deliver SD Wrap-Up documents on June 15<br />
o (1) full sized set will be delivered to OSU<br />
o PDFs will go on FTP site<br />
o The set will have sheets fully updated with sketches – no loose 8 ½ x 11—and will not<br />
include previous SD sheets from 2011<br />
opsis architecture LLP