02.07.2013 Views

MEETING MINUTES - blogs - Oregon State University

MEETING MINUTES - blogs - Oregon State University

MEETING MINUTES - blogs - Oregon State University

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 4 of 4<br />

04.11.2012<br />

4509-01<br />

Craft Center/Basement:<br />

Opsis presented diagrams showing the history of basement space allocation<br />

o The Craft center space has increased while storage space has decreased. The Space<br />

Allocation and Planning Committee (SAPC) will review program needs and provide final<br />

square footage<br />

Sid would like to keep MU storage (1500 SF) for now<br />

Retail storage (500 SF) is TBD, pending outcome of Student Fee Impact Committee revenue<br />

analysis<br />

The Craft Center provided an updated layout based on Option 3 (presented on 5/23).<br />

Bathroom access is a concern. CC would prefer to shorten the distance from the CC to restrooms<br />

for safety reasons.<br />

After-hours access with key cards was a concern to CC<br />

Accessibility in the CC was brought up at the Accessibility Workshop on 5/23. Kent has engaged<br />

the Disability Access Services group on campus to review the space<br />

Opsis will update the plan, square-footage numbers and program spreadsheet based on info from<br />

the SAPC<br />

Ventilation requirements will be reviewed with PAE in DD<br />

Wrap-Up:<br />

Next steps include understanding hours of operation, security, access, recycling program etc.<br />

East entry appears to be a good after-hours entry because of its proximity to the elevators. There<br />

will need to be a gate preventing access to the rest of the building and a security camera.<br />

OSU needs to understand the financial impact of the antenna on the SEC in order to determine<br />

whether it is in or out of the project<br />

DD meetings will get into building system development as well as individual group meetings to<br />

work out office spaces. Larrie proposed coming to Portland on alternate Wednesdays to review<br />

building systems so time in Corvallis can be spent with user groups.<br />

Andersen would like to meet with KPFF to work through VE list (braced frames are a big cost<br />

item)<br />

PAE needs to assist the MU with water volume concerns<br />

Opsis will look into LEED-EB for the MU<br />

Opsis will coordinate technology consultant review in Portland with Larrie<br />

Opsis will deliver SD Wrap-Up documents on June 15<br />

o (1) full sized set will be delivered to OSU<br />

o PDFs will go on FTP site<br />

o The set will have sheets fully updated with sketches – no loose 8 ½ x 11—and will not<br />

include previous SD sheets from 2011<br />

opsis architecture LLP

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!