Item Current Design Description Proposed Cost Revision Item Description<br />

Cost Impact<br />

Add/(Deduct)<br />

Largest<br />

Possible<br />

Savings<br />

Recommended<br />

by OPSIS<br />

Discussion Items<br />

(on the fence)<br />

STRUCTURE<br />

001 Cast in Place concrete shear walls with architectural finish Braced Frames with reduced Mat Foundation ($763,035) ($763,035) ($763,035)<br />

002 Cast in Place concrete structural flat slab at ground floor Steel Framed Ground Floor with slab on metal deck,<br />

gypboard ceiling, and additional 1'-0" depth to basement<br />

003 Atrium opening framed with no exposed columns, with Simplify steel structure at atrium framing, allow for 1.0 lb<br />

long cantelevered portions<br />

per sf of steel framing area savings<br />

004 Stair No. 4 included per addendum at a total cost of<br />

$121,800 including support cables, wood treads and<br />

railings<br />

005 Slab on Grade included at 6" thick per Schematic Design<br />

Documents<br />

006 Cast in Place concrete structural flat slab at ground floor<br />

included as 14" thick per Schematic Design Documents<br />

007 Floating Floor System included at Radio studios as well<br />

as TV studios per Schematic Design Documents<br />

008<br />

FAÇADE & ROOFING<br />

001 Mechanical screen included inside mansard roof area Omit mechanical screening inside mansard roof area,<br />

assume equipment hidden by mansard roof<br />

002 Mechanical screen included inside mansard roof area Go to Equipment Mounted Screen Panels in lieu of<br />

separate framed mechanical screen<br />

003 Fritted Horizontal Glass Sunshades included per window<br />

details at all window types except type A<br />

004 Fritted Horizontal Glass Sunshades included per window<br />

details at all window types except type A<br />

005 Fritted Horizontal Glass Sunshades included per window<br />

details at all window types except type A<br />

006 Fritted Horizontal Glass Sunshades included per window<br />

details at all window types except type A<br />

007 Precast Vertical Sunshades included per window details at<br />

window types B & E<br />

NOT<br />

Recommended<br />

by OPSIS<br />

PRELIMINARY<br />

Accepted<br />

Date<br />

Accept/<br />

Reject<br />

Action<br />

Required<br />

By<br />

Action<br />

Due By Notes<br />

($74,787) ($74,787) ($74,787) ######## Potentially review areas where ceiling is required, minimize amount of ceiling<br />

to get additional savings<br />

($101,340) ($101,340) ($101,340)<br />

Set allowance for Stair No. 4 at $50,000 all inclusive ($71,800) ($71,800) ($71,800) ########<br />

Reduce Slab on Grade to 4" thick ($20,451) ($20,451) ($20,451) ########<br />

Reduce CIP Ground Floor structural slab to 12" thick ($24,024) Accepted other item ########<br />

Omit Floating Floor System at Radio studios ($31,020) ($31,020) Rejected ########<br />

Omit glass sunshades completely from project ($131,984) ($131,984)<br />

($1,086,457) ($1,062,433) $0 ($864,375) $0 ($167,038)<br />

($151,235) ($151,235) Accepted other item ########<br />

($94,456) ($94,456) ########<br />

Omit glass sunshades at all windows on East elevation ($22,141) ($22,141) ########<br />

Omit glass sunshades at all windows on North elevation ($38,229) ($38,229) ########<br />

Omit glass sunshades at all windows on West elevation ($21,277) Look at omitting the first floor sunshades on the west that may be shaded by the canopy<br />

Omit Precast Vertical Sunshades at all window types ($78,925) ($78,925) ($78,925)<br />

008 Precast Gutter included per detail 10/A6.11 Go to copper gutter to match mansard roof ($60,320) ($60,320) ($60,320) ########<br />

009 Precast included per Schematic Design Documents Reduce projection of precast window surrounds to 3" in<br />

lieu of 6"<br />

($16,320) ($16,320) ($16,320)<br />

010 Precast included per Schematic Design Documents Go to Arcis type panel at 4th floor flat panel locations ($88,078) ($88,078) ($88,078) ########<br />

011 Precast included per Schematic Design Documents Go to Brick Veneer in lieu of Precast Flat Panels at North-<br />

East corner, ground to level 2<br />

012 Precast included per Schematic Design Documents Go to Brick Veneer in lieu of Precast Flat Panels at East<br />

Elevation, level 2 to 4 between grids A.5 and B<br />

013 Precast included per Schematic Design Documents Omit Precast Frame/Border at Ground to Level 2 and go<br />

to full brick veneer<br />

Student Experience Center<br />

Cost Revision Log - July 7, 2011 Schematic Estimate<br />

8/12/2011 - Rev 4/19/12 - Rev 5/29/12<br />

($10,185) ($10,185) ($10,185) ########<br />

($7,182) ($7,182) ($7,182) ########<br />

($46,114) ($46,114) ($46,114)<br />

Page 1 of 4