Item Current Design Description Proposed Cost Revision Item Description<br />

FIRE PROTECTION<br />

001 Fire Pump included in Schmatic Design Estimate, based<br />

upon assumption that flow testing may require one<br />

002 Inergen Clean Agent included at the MDF room 27 in the<br />

basement and IT Equip 427, Small TV Control 158, and<br />

Large TV Control 413 on the 4th Floor per the Schematic<br />

Design Documents<br />

003 Tyco WS Sprinklers included at Atrium Glass system on<br />

both sides of glass<br />

004 Tyco WS Sprinklers included at Atrium Glass system on<br />

both sides of glass<br />

005<br />

MECHANICAL (PLUMBING & HVAC)<br />

001 Radiant Panel Ceiling system included per Mechanical<br />

Narrative in Schematic Design Documents<br />

002 Radiant Panel Ceiling system included per Mechanical<br />

Narrative in Schematic Design Documents with 10,000 sf<br />

of inactive panels<br />

003 Cooling Tower capacity included to allow for future work<br />

at Memorial Union<br />

Omit Fire Pump from scope based upon assumption that<br />

flow testing WILL NOT REQUIRE one<br />

Omit Inergen Clean Agent systems and go to Pre-Action<br />

systems at all of these locations<br />

Omit Tyco WS Sprinklers at Atrium Glass system, based<br />

upon assumption that no special fire sprinkler protection<br />

is required<br />

Apply for a variance with Fire Mashall and go to fire<br />

sprinklers spaced every 6' on center on both sides of glass<br />

in soffits in lieu of Tyco WS Sprinklers<br />

Revise Radiant Panel Ceilings per updated sketches and<br />

panel specifications from Opsis<br />

Omit inactive panels and create clouds of only active<br />

panels<br />

Reduce Cooling Tower by 15% with allowance for future<br />

expansion<br />

Cost Impact<br />

Add/(Deduct)<br />

Student Experience Center<br />

Cost Revision Log - July 7, 2011 Schematic Estimate<br />

8/12/2011 - Rev 4/19/12 - Rev 5/29/12<br />

Largest<br />

Possible<br />

Savings<br />

Recommended<br />

by OPSIS<br />

Discussion Items<br />

(on the fence)<br />

($62,553) ($62,553) ($62,553)<br />

NOT<br />

Recommended<br />

by OPSIS<br />

PRELIMINARY<br />

Accepted<br />

Date<br />

Accept/<br />

Reject<br />

($94,836) ($94,836) ($94,836) ########<br />

($35,175) ($35,175)<br />

($14,070) ($14,070) ########<br />

($206,634) ($192,564) $0 ($62,553) $0 ($108,906)<br />

Pending Pending<br />

($119,000) ($119,000) ($119,000)<br />

004 Air Cooled Chillers vs Water Cooled Chillers Pending Pending<br />

005<br />

ELECTRICAL & LOW VOLTAGE<br />

001 Security and Access Control not included in Schematic<br />

Design Estimate for Electrical/Low Voltage<br />

002 Campus Inter-Ties not included in Schematic Design<br />

Estimate for Electrial/Low Voltage<br />

003 Audio Visual Equipment and Cabling not included in<br />

Schematic Design Estimate for Electrical/Low Voltage<br />

004 Lighting & Lighing Control included at a value equal to<br />

$11.20/GSF<br />

005<br />

($59,340) ($59,340) ($59,340) ########<br />

($178,340) ($178,340) $0 ($119,000) $0 ($59,340)<br />

Action<br />

Required<br />

By<br />

Action<br />

Due By Notes<br />

ADD Security and Access Control bsed upon 20 doors $100,000 $100,000 $100,000 ######## Verify amount<br />

ADD Campus Inter-Ties Allowance $110,000 $110,000 $110,000 ######## Verify amount and location to pull from<br />

ADD Audio Visual Equipment and Cabling not included<br />

in Schematic Design Estimate for Electrical/Low Voltage<br />

ADD Lighting & Lighting Control to create a unit cost<br />

equal to $13.00/GSF<br />

$170,000 $170,000 $170,000 ########<br />

$167,362 $167,362 Verify amount<br />

$547,362 $380,000 $0 $167,362 $0 $380,000<br />