23.07.2013 Views

British Antarctic Survey - netzentwurf.de

British Antarctic Survey - netzentwurf.de

British Antarctic Survey - netzentwurf.de

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Design Concept Competition<br />

Evaluation and Assessment - Notes<br />

The Expression of Interest (EOI) submission will be evaluated in two stages.<br />

The Technical Panel will primarily evaluate the responses to questions 1 to 10 of the EOI<br />

Questionnaire; and the Jury will focus primarily on the <strong>de</strong>sign quality questions, including question 8. In<br />

this way it is planned to enable the judging process to evaluate innovation and <strong>de</strong>sign approach<br />

alongsi<strong>de</strong> realistic technical compliance.<br />

Short-listed <strong>de</strong>sign teams will be invited to a project briefing day on the 1st Sept at the BAS Offices in<br />

Cambridge where they will receive full project <strong>de</strong>tails (including Project Brief, Health & Safety Plan etc).<br />

On completion of the brief teams will be invited to prepare and submit Concept Proposals.<br />

The Jury Panel will inclu<strong>de</strong><br />

Professor Chris Rapley CBE...........................................................................Director, <strong>British</strong> <strong>Antarctic</strong> <strong>Survey</strong><br />

Mr David Blake, MIIE.......................................Head of Technology & Engineering, <strong>British</strong> <strong>Antarctic</strong> <strong>Survey</strong><br />

Sir Nicholas Grimshaw, RIBA ............................................................................Nicholas Grimshaw & Partners<br />

Mr Mike Clift, RIBA ....................................................................................Building Research Establishment Ltd<br />

Mr Andrew Thorne, MEI.............................................................................Building Research Establishment Ltd<br />

Mr Malcolm Reading, RIBA ............................RIBA Architectural Advisor, Malcolm Reading & Associates<br />

Technical Panel<br />

The Technical Panel will provi<strong>de</strong> support to the Jury Panel and comprise BAS staff with many years of<br />

experience of working and operating in <strong>Antarctic</strong>a. The Halley VI Project Manager will chair the<br />

Technical Panel.The RIBA Architectural Advisor will also be a member of the Technical Panel.<br />

Results<br />

The results of each stage of the Competition will be announced through the media after competitors<br />

have been notified by post, fax or email.<br />

The <strong>British</strong> <strong>Antarctic</strong> <strong>Survey</strong> will not be bound to adopt any of the concept proposals as the basis for<br />

the <strong>de</strong>tailed <strong>de</strong>sign and build of Halley VI Research Station.<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!