26.07.2013 Views

FASTCAST™ tunnelling and underground products - CMS

FASTCAST™ tunnelling and underground products - CMS

FASTCAST™ tunnelling and underground products - CMS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

St<strong>and</strong>ard Bolted Linings<br />

Shaft constructed as a caisson<br />

St<strong>and</strong>ard bolted shafts<br />

available with:-<br />

Heavy duty cover slab<br />

Corbel ring or platform support ring<br />

Intermediate l<strong>and</strong>ing slab<br />

Choker ring<br />

Cutting edge<br />

Sealants:-<br />

Heavy duty cover slab<br />

St<strong>and</strong>ard shaft ring<br />

Grout hole<br />

Corbel ring<br />

(corbel at ring centre<br />

on small diameter)<br />

Intermediate<br />

l<strong>and</strong>ing slab<br />

St<strong>and</strong>ard shaft ring<br />

Choker ring<br />

Cutting edge<br />

Caulking<br />

Hydrophilic rubber strip<br />

(optional)<br />

Grout hole:-<br />

Coarse threaded plastic<br />

with plug <strong>and</strong> NRV<br />

Tunnel <strong>and</strong> shaft linings An AMEC company<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!