Towing Tank Facility - nptel - Indian Institute of Technology Madras
Towing Tank Facility - nptel - Indian Institute of Technology Madras
Towing Tank Facility - nptel - Indian Institute of Technology Madras
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Hydraulics Pr<strong>of</strong>. B.S. Thandaveswara<br />
Typical Chart<br />
Environmental and Water Resource Engineering Division,<br />
Dept. <strong>of</strong> Civil Engineering, I.I.T. <strong>Madras</strong>, Chennai – 600036<br />
Table 1: Ready Reckoner for Velocity, given for the number <strong>of</strong> revolution<br />
Time in secs<br />
40<br />
41<br />
42<br />
43<br />
44<br />
45<br />
65<br />
66<br />
67<br />
68<br />
<strong>Indian</strong> <strong>Institute</strong> <strong>of</strong> <strong>Technology</strong> <strong>Madras</strong><br />
Meter No.<br />
Report No. CIE /EWRE/<br />
Date <strong>of</strong> Calibration<br />
Spin Test secs<br />
V max ms -1<br />
Threshold velocity ms -1<br />
Velocity Equation(s) V = m*n+c<br />
Velocity in m/s<br />
Velocity in m/s<br />
5 Revs 40 Revs 50 Revs 60 Revs 250 Revs 300 Revs<br />
Salient Technical Data<br />
<strong>Towing</strong> <strong>Tank</strong><br />
Length 82.0m<br />
Width 3.2m<br />
Maximum Water Depth 2.8m<br />
Gauge <strong>of</strong> Rails<br />
<strong>Towing</strong> Carriage<br />
3.5m<br />
Net Weight 3.9 tones<br />
Length 5.3m<br />
Speed Range 0.02 to 5.5 ms -1<br />
Test length for 5.5 m/s 50.0m<br />
Velocity Precision ± 0.1%<br />
Maximum<br />
Acceleration/Deceleration<br />
3 ms -2<br />
Drag Balance<br />
Maximum drag 100 N<br />
Least Count 0.01 N<br />
Error range ± 1%<br />
Ratio <strong>of</strong> Force Transmission 2 : 1 or 4 :1<br />
Time in secs<br />
40<br />
41<br />
42<br />
43<br />
44<br />
45<br />
65<br />
66<br />
67<br />
68