31.07.2013 Views

1. Annual repairs and maintenance of the ESIC Hospital buildings ...

1. Annual repairs and maintenance of the ESIC Hospital buildings ...

1. Annual repairs and maintenance of the ESIC Hospital buildings ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6) That <strong>the</strong>re is no vigilance/ CBI case or court case pending against me/ my<br />

firm debarring me/ my firm it undertake contract work/ supply <strong>of</strong><br />

items quoted.<br />

7) That I hereby undertake to carryout <strong>the</strong> work as has been explained to me<br />

to <strong>the</strong> satisfaction <strong>of</strong> hospital authority with in stipulated period.<br />

8) I have been informed that The Medical Superintendent has <strong>the</strong> right to<br />

accept or reject any or all <strong>the</strong> tenders without assigning any reason <strong>the</strong>re<strong>of</strong>.<br />

9) I am ready to sign <strong>the</strong> agreement with <strong>the</strong> <strong>ESIC</strong> which was shown to me.<br />

Signature & Address <strong>of</strong> <strong>the</strong> Tenderer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!