present Status and progress<br />

Marshal Mix design of Bituminous Concrete, Semi<br />

Dense Bituminous Concrete and Dense Bituminous<br />

Macadam using ordinary aggregate and waste plastic<br />

coated aggregate is done and the results are compared.<br />

Dry mixing is adopted for prepration of modified mix. Test<br />

stretches are resurfaced using modified mix with plastic<br />

coated aggregates and control section using ordinary<br />

aggregates. Periodical evaluation of the test stretches<br />

is done. Both functional and structural evaluation is<br />

done. Condition survey, roughness, skid resistance<br />

and texture depth studies were done and the results<br />

are compared. More demonstration stretches are laid<br />

in collaboration with local bodies using modified mix<br />

with waste plastic coated aggregates.<br />

Status: On-going<br />

Further Findings/ Supporting Data<br />

It was found from the studies that the optimum binder<br />

content gets reduced by using modified mix in all types<br />

resulting in savings in bitumen. The stability increases<br />

by 1.2 times for DBM and 1.5 times for BC and SDBC.<br />

Aggregates coated with plastic waste showed zero<br />

stripping even after 72 hours of soaking. <strong>Roads</strong> laid<br />

with modified mix showed delayed distress.<br />

Reports/ Publications<br />

Final Report submitted to Chief Engineer (local Self<br />

Govt Dept)<br />

Further information/Copy of report can be obtained<br />

from<br />

Director, National Transportation Planning and<br />

<strong>Research</strong> Centre, Sasthra Bhavan, Pattom Palace P. O.,<br />

Thiruvananthapuram- 695 004, Mobile: 9446342828;<br />

phone: 0471- 2548300, 2543678, Fax: 0471-2543677,<br />

e-mail ID: bgsreedevi@yahoo.com<br />

6. Study to Prevent Reflecting Cracks on<br />

Bituminous Overlay over Cracked Concrete<br />

Pavement using Geotextile<br />

Date of start: May 1999<br />

Date of completion: January 2011<br />

Gujarat Engineering <strong>Research</strong> Institute (GERI),<br />

Vadodara<br />

Present status and progress<br />

Status: Completed<br />

Year of Last Report: 2009-10<br />

progress: Completed<br />

ROAD RESEARCH IN INDIA 2011-12 15<br />

Further Findings/ Conclusions/Supporting Data<br />

The careful study of the field data collected during the<br />

periodic observations indicated that the deflection, the<br />

total distress and the serviceability index over a period of<br />

time are minimal in Geotextile test sections as compared<br />

to the control panel. Since all the above parameters are<br />

measure of the performance and structural capacity<br />

of road pavement, the results clearly indicate that the<br />

inclusion of a Geotextile can improve the performance<br />

of the road pavement possibly due to its ability to<br />

reinforce and strengthen the pavement and to control<br />

the degradation of structural behavior of pavement as<br />

compared to pavement without Geotextile.<br />

Report / Publications<br />

Final Report submitted to Govt. of Gujarat vide GERI<br />

office letter <strong>No</strong>. JD(R)/PB/12/ ‘ of 2011. Dt. : 07 : 01 :<br />

2011<br />

Further information / copy of report can be obtained<br />

from<br />

Road <strong>Research</strong> Division-1, Gujarat Engineering<br />

<strong>Research</strong> Institute (GERI), Race course, Vadodara-<br />

<strong>39</strong>0007, phone : 0265 2313413-14-15 Fax : 0265<br />

2313416, e-mail ID: rorrd12006@rediff.com<br />

7. “Asphaltoseal” (Asphalt to Seal Mastic Pad)<br />

Date of Start : June, 2007<br />

Tiki Tar Industries (Baroda) Limited (R, C).<br />

Methodology<br />

i.<br />

ii.<br />

The surface must be completely free of dust, oil,<br />

protruding nibs, nails etc.<br />

A coat of Tiki Primer is to be applied at<br />

200-300 g/m2 (Primer is to be mixed with<br />

water in 1:1 ratio) and must be allowed to dry<br />

completely.<br />

iii. ASPHAlTOSEAl rolls are lined up and spread<br />

near to the area to which they are to be<br />

fixed with overlapping by minimum 50 cm.<br />

ASPHAlTOSEAl is then to be rolled back without<br />

changing its orientation.<br />

iv. Unroll half of ASPHAlTOSEAl and heat<br />

underside evenly and sufficiently to cause<br />

surface melting. Proper care should be taken<br />

that heated roll is pressed simultaneously<br />

and impression of the concrete deck be<br />

reflected irrespective of unevenness.<br />

v.<br />

vi.<br />

Side overlap of each roll should be sealed<br />

properly, also, end overlap joints.<br />

<strong>No</strong> tack coat is required above<br />

ASPHAlTOSEAl.