present Status and progress<br />
Marshal Mix design of Bituminous Concrete, Semi<br />
Dense Bituminous Concrete and Dense Bituminous<br />
Macadam using ordinary aggregate and waste plastic<br />
coated aggregate is done and the results are compared.<br />
Dry mixing is adopted for prepration of modified mix. Test<br />
stretches are resurfaced using modified mix with plastic<br />
coated aggregates and control section using ordinary<br />
aggregates. Periodical evaluation of the test stretches<br />
is done. Both functional and structural evaluation is<br />
done. Condition survey, roughness, skid resistance<br />
and texture depth studies were done and the results<br />
are compared. More demonstration stretches are laid<br />
in collaboration with local bodies using modified mix<br />
with waste plastic coated aggregates.<br />
Status: On-going<br />
Further Findings/ Supporting Data<br />
It was found from the studies that the optimum binder<br />
content gets reduced by using modified mix in all types<br />
resulting in savings in bitumen. The stability increases<br />
by 1.2 times for DBM and 1.5 times for BC and SDBC.<br />
Aggregates coated with plastic waste showed zero<br />
stripping even after 72 hours of soaking. <strong>Roads</strong> laid<br />
with modified mix showed delayed distress.<br />
Reports/ Publications<br />
Final Report submitted to Chief Engineer (local Self<br />
Govt Dept)<br />
Further information/Copy of report can be obtained<br />
from<br />
Director, National Transportation Planning and<br />
<strong>Research</strong> Centre, Sasthra Bhavan, Pattom Palace P. O.,<br />
Thiruvananthapuram- 695 004, Mobile: 9446342828;<br />
phone: 0471- 2548300, 2543678, Fax: 0471-2543677,<br />
e-mail ID: bgsreedevi@yahoo.com<br />
6. Study to Prevent Reflecting Cracks on<br />
Bituminous Overlay over Cracked Concrete<br />
Pavement using Geotextile<br />
Date of start: May 1999<br />
Date of completion: January 2011<br />
Gujarat Engineering <strong>Research</strong> Institute (GERI),<br />
Vadodara<br />
Present status and progress<br />
Status: Completed<br />
Year of Last Report: 2009-10<br />
progress: Completed<br />
ROAD RESEARCH IN INDIA 2011-12 15<br />
Further Findings/ Conclusions/Supporting Data<br />
The careful study of the field data collected during the<br />
periodic observations indicated that the deflection, the<br />
total distress and the serviceability index over a period of<br />
time are minimal in Geotextile test sections as compared<br />
to the control panel. Since all the above parameters are<br />
measure of the performance and structural capacity<br />
of road pavement, the results clearly indicate that the<br />
inclusion of a Geotextile can improve the performance<br />
of the road pavement possibly due to its ability to<br />
reinforce and strengthen the pavement and to control<br />
the degradation of structural behavior of pavement as<br />
compared to pavement without Geotextile.<br />
Report / Publications<br />
Final Report submitted to Govt. of Gujarat vide GERI<br />
office letter <strong>No</strong>. JD(R)/PB/12/ ‘ of 2011. Dt. : 07 : 01 :<br />
2011<br />
Further information / copy of report can be obtained<br />
from<br />
Road <strong>Research</strong> Division-1, Gujarat Engineering<br />
<strong>Research</strong> Institute (GERI), Race course, Vadodara-<br />
<strong>39</strong>0007, phone : 0265 2313413-14-15 Fax : 0265<br />
2313416, e-mail ID: rorrd12006@rediff.com<br />
7. “Asphaltoseal” (Asphalt to Seal Mastic Pad)<br />
Date of Start : June, 2007<br />
Tiki Tar Industries (Baroda) Limited (R, C).<br />
Methodology<br />
i.<br />
ii.<br />
The surface must be completely free of dust, oil,<br />
protruding nibs, nails etc.<br />
A coat of Tiki Primer is to be applied at<br />
200-300 g/m2 (Primer is to be mixed with<br />
water in 1:1 ratio) and must be allowed to dry<br />
completely.<br />
iii. ASPHAlTOSEAl rolls are lined up and spread<br />
near to the area to which they are to be<br />
fixed with overlapping by minimum 50 cm.<br />
ASPHAlTOSEAl is then to be rolled back without<br />
changing its orientation.<br />
iv. Unroll half of ASPHAlTOSEAl and heat<br />
underside evenly and sufficiently to cause<br />
surface melting. Proper care should be taken<br />
that heated roll is pressed simultaneously<br />
and impression of the concrete deck be<br />
reflected irrespective of unevenness.<br />
v.<br />
vi.<br />
Side overlap of each roll should be sealed<br />
properly, also, end overlap joints.<br />
<strong>No</strong> tack coat is required above<br />
ASPHAlTOSEAl.