06.08.2013 Views

Highway Research Record No. 39 - Indian Roads Congress

Highway Research Record No. 39 - Indian Roads Congress

Highway Research Record No. 39 - Indian Roads Congress

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2. Design, Construction and Performance<br />

Evaluation of New Materials and Mixes towards<br />

Development and Upgradation of Standards /<br />

Specifications<br />

Date of Start: July 2009<br />

Date of Completion (Targeted): October 2015<br />

Central Road <strong>Research</strong> Institute, New Delhi<br />

(R, S, I)<br />

present Status and progress<br />

Status: On-going<br />

Year of Last Report: 2011<br />

progress<br />

The second series of performance observation on<br />

various road sections laid with Stone Matrix Asphalt<br />

(SMA), Hot Mix Asphalt mixes using Waste Plastic and<br />

Microsurfacing were undertaken during <strong>No</strong>vember/<br />

December, 2011. Further work with regard to processing<br />

/ analysis of 2 nd series of performance data is in progress<br />

and third series of periodic observations are being<br />

planned to be undertaken in the month of <strong>No</strong>vember<br />

/ December 2012. Performance observations being<br />

taken for time series data include (i) Assessment of<br />

Pavement Surface Distress by visual observation (ii)<br />

Measurement of Pavement surface roughness by<br />

using Roughometer-II (iii) Deflection measurements by<br />

using Benkelman Beam Method and (iv) Traffic volume<br />

survey, 24 hours round the clock.<br />

Further Findings/Conclusions/Supporting Data<br />

Time series data collected for the two series of<br />

observations reveal that pavement surface distress<br />

and riding quality of test sections has not changed<br />

significantly.<br />

Further information/Copy of the report can be<br />

obtained from<br />

The Director, Central Road <strong>Research</strong> Institute,<br />

Mathura Road, New Delhi, phone: 011- 26313569,<br />

Fax: 011- 26313569, e-mail ID: director.crri@nic.in<br />

3. Development of National Document/<br />

Guidelines on the Use of Weigh-In-Motion<br />

System in India for Axle Load Monitoring<br />

Keywords : Weigh-In-Motion, Axle load<br />

Date of Start: 01.10.2009<br />

Date of Completion (Targeted): December<br />

2012<br />

ROAD RESEARCH IN INDIA 2011-12 29<br />

Central Road <strong>Research</strong> Institute, New Delhi<br />

(R, S, I)<br />

present Status and progress<br />

Status: On-going<br />

Year of Last Report: 2010<br />

progress<br />

•<br />

•<br />

Procurement<br />

completed.<br />

of Weigh-In-Motion (WIM)<br />

Field data collection using Weigh-In-Motion (WIM)<br />

system on few selected road sites has been<br />

completed. Data analyses / processing are in<br />

progress.<br />

Further information /Copy of the report can be<br />

obtained from<br />

The Director, Central Road <strong>Research</strong> Institute, Mathura<br />

Road, New Delhi - 25, phone: 011- 26313569,<br />

Fax: 011- 26313569, e-mail ID: director.crri@nic.in<br />

4. Zycosoil Nanotechnology Multilayer<br />

Waterproofing Treatment of Soil and Asphalt<br />

Concrete in Road Construction<br />

Date of Start: March 2010<br />

Date of Completion (Actual): June 2010<br />

Zydex Industries, Vadodara, Gujarat<br />

present Status and progress<br />

Status: On-going continued long term evaluation<br />

Year of Last Report: Year 2011<br />

progress: Two post monsoon evaluations completed<br />

Methodology<br />

Soil base<br />

Zycosoil (new name Terrasil for soil application) applied<br />

on the compacted soil layers for making waterproofed<br />

vapour permeable layer.<br />

WBM / Carpet layer<br />

Prime / Tack coat using Zycosoil (new name Terrasil)<br />

solution with cationic bitumen emulsion and sprayed on<br />

WBM/ Carpet layer for improved wetting, penetration,<br />

bonding and quick set.<br />

Asphalt layer<br />

Zycosoil added in hot asphalt binder @ 0.1 Per cent by<br />

weight of binder and mixed thoroughly with circulating

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!