06.08.2013 Views

ik 5000 quadra-chek - heidenhain

ik 5000 quadra-chek - heidenhain

ik 5000 quadra-chek - heidenhain

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Quadra-Chek ® <strong>5000</strong><br />

Dropping in Z<br />

The distance the Z axis moves into the rack during a probe drop.<br />

Pickup in Z<br />

The distance the Z axis moves from the docking port after probe pickup.<br />

Release in Z<br />

The distance the Z axis moves from the docking port during a probe drop.<br />

Approach in Z<br />

The distance the Z axis moves into the rack during a probe pickup.<br />

Entering port position offset<br />

The offset distance along the axis of the rack between the center of the docking<br />

module and the center of the probe tip used for calibration. Enter port position<br />

offsets in the QC-<strong>5000</strong> as follows:<br />

Rack orientation is X Positive<br />

Enter the X value<br />

Rack orientation is X Negative<br />

Enter the negative of the X value<br />

Rack orientation is Y Positive<br />

Enter the Y value<br />

Rack orientation is Y Negative<br />

Enter the negative of the Y value<br />

Checking the probe rack orientation<br />

The probe rack must be aligned within 1 degree of the nominal X or Y axis<br />

orientation to ensure reliable probe rack operation.<br />

NOTE<br />

When error correction is enabled, the error correction (NLEC or<br />

SLEC) data entry must be performed before calibrating the probe<br />

rack.<br />

1 Lock Z-axis motion and measure a line along the front of the probe rack.<br />

2 Re-adjust the orientation of the probe rack if the angle of the line is greater<br />

than 1.0 degree from the nominal orientation.<br />

6 - 89

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!