TM 5-694<br />

ii<br />

PARAGRAPH PAGE<br />

CHAPTER 4 MAIN POWER SYSTEM<br />

Description <strong>of</strong> main power system 4-1 4-1<br />

Operation <strong>of</strong> main power system 4-2 4-2<br />

<strong>Commissioning</strong> plan <strong>for</strong> main power system 4-3 4-2<br />

Installation inspections and component testing <strong>of</strong> main power system 4-4 4-2<br />

Energizing and test <strong>of</strong> the main power system 4-5 4-3<br />

Possible failures and corrective actions <strong>of</strong> the main power system 4-6 4-5<br />

CHAPTER 5 STANDBY POWER SYSTEM<br />

Description <strong>of</strong> standby power system 5-1 5-1<br />

Operation <strong>of</strong> standby power system 5-2 5-1<br />

<strong>Commissioning</strong> plan <strong>for</strong> standby power system 5-3 5-2<br />

Installation inspections and component testing <strong>of</strong> standby power 5-4 5-2<br />

system<br />

Energizing and test <strong>of</strong> the standby power system 5-5 5-3<br />

Possible failures and corrective actions <strong>of</strong> the standby power system: 5-6 5-4<br />

CHAPTER 6 UNINTERRUPTIBLE POWER SUPPLY SYSTEMS<br />

Description <strong>of</strong> uninterruptible power supply (UPS) system 6-1 6-1<br />

Operation <strong>of</strong> uninterruptible power supply system 6-2 6-2<br />

<strong>Commissioning</strong> plan <strong>for</strong> the UPS system 6-3 6-2<br />

Installation inspections and component testing <strong>of</strong> the UPS system 6-4 6-2<br />

Energizing and test <strong>of</strong> the UPS system 6-5 6-3<br />

Possible failures and corrective actions 6-6 6-6<br />

CHAPTER 7 HIGH ALTITUDE ELECTROMAGNETIC PULSE (HEMP) AND<br />

HIGH POWER MICROWAVE (HPM) EQUIPMENT & CONTROLS<br />

General HEMP protection systems 7-1 7-1<br />

HEMP protection systems 7-2 7-1<br />

APPENDIX A REFERENCES A-1<br />

LIST OF TABLES<br />

Table Title Page<br />

1-1 Costs <strong>of</strong> commissioning, new construction 1-3<br />

2-1 Recommended minimum insulation resistance values at 40 O C (all values in<br />

MΩ)<br />

2-10<br />

2-2 Recommended minimum values <strong>of</strong> polarization index <strong>for</strong> all machine<br />

components insulation classes<br />

2-16<br />

3-1 Medium-voltage cables maximum field acceptance test voltages (kV, dc) 3-10<br />

4-1 Circuit switcher functional checklist 4-4<br />

4-2 Possible failures and corrective actions <strong>of</strong> the main power system 4-6<br />

5-1 Possible failures and corrective actions <strong>of</strong> the standby power system 5-5<br />

6-1 Possible failures and corrective actions <strong>of</strong> the UPS system 6-6