11.08.2013 Views

User Reference Manual.book

User Reference Manual.book

User Reference Manual.book

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Control Modules<br />

2. Press the Hot Swap button or enter the following from the CLI:<br />

3. When the module is ready to remove, the Offline LED will turn ON and all other LEDs will<br />

turn OFF. Figure 3 shows the location of the LEDs and Hot Swap buttons on Control<br />

Modules.<br />

4. Loosen the captive screws on each side of the Control Module and, in the case of the ER16,<br />

open the ejectors.<br />

5. Carefully remove the Control Module from the chassis.<br />

Installing a Control Module<br />

xp# system hotswap out slot <br />

Note: If you have deactivated a Control Module and want to activate it again, simply pull it<br />

from its slot and push it back in again. The module is activated automatically. If you<br />

deactivated the module with the system hotswap out command but did not remove<br />

the module, you can reactivate it with the system hotswap in command:<br />

xp# system hotswap in slot 1<br />

WARNING The X-Pedition and its components are sensitive to static discharge. To prevent<br />

electrostatic damage, observe the guidelines provided in Preventing Electrostatic<br />

Damage on page 17.<br />

To install a Control Module, do the following:<br />

1. Slide the new Control Module all the way into the slot, firmly but gently pressing it in place<br />

to ensure that the pins on the back of the card are completely seated in the backplane. Make<br />

sure the circuit card (and not the metal plate) is between the card guides. Check both the upper<br />

and lower tracks.<br />

Note: On an XP-8000/8600, you can install either a line card or a Control Module in slot CM/1,<br />

but you can install only a Control Module in slot CM. On the ER16, control modules will<br />

operate only in slots 8 and 9—slot 8 is reserved for the Primary control module.<br />

WARNING You must install the PCMCIA card before you install the CM or while the CM is<br />

on standby after a hot swap. Do not remove a PCMCIA card while the unit is<br />

powered on. Enterasys recommends using PCMCIA cards of the same size and type<br />

when operating in a Dual CM environment.<br />

2. Secure the Control Module. To secure the control module in an ER16, close the ejectors and<br />

use a flathead screwdriver to tighten the screw on each ejector. For all other routers, align the<br />

captive screws with the holes in the face of the router and tighten to secure the module to the<br />

chassis.<br />

24 Enterasys X-Pedition <strong>User</strong> <strong>Reference</strong> <strong>Manual</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!