13.08.2013 Views

DECISION MEMO Prescribed Burn and Commercial Thinning ...

DECISION MEMO Prescribed Burn and Commercial Thinning ...

DECISION MEMO Prescribed Burn and Commercial Thinning ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2. If a bald eagle roost site or nest is observed within a burn block prior to prescribe burning,<br />

suspend burning operations <strong>and</strong> notify Sumter National Forest biological staff. If a roost site or<br />

nest is observed during prescribed burning, notify biological staff immediately <strong>and</strong><br />

implement the following protective measures:<br />

a. Protect the roost or nest tree from fire by raking or clearing the vegetation from<br />

around the tree a sufficient distance to prevent crown fire or fire climbing the<br />

tree;<br />

b. Helicopters <strong>and</strong> fixed-wing aircraft shall not operate within 1,000 feet of active<br />

roosts or nests; <strong>and</strong><br />

c. If possible, smoke shall be directed away from roost or nest trees.<br />

3. Georgia aster sites shall be designated by Sumter National Forest biological staff prior to<br />

prescribe burning or timber operations, <strong>and</strong> the following protective measures shall be<br />

implemented:<br />

a. Avoid Georgia aster sites during dozer <strong>and</strong>/or h<strong>and</strong>line construction;<br />

b. During the timber sale in compartment 63, st<strong>and</strong> 11, directionally fall trees away<br />

from Georgia aster sites; <strong>and</strong><br />

c. Keep logging <strong>and</strong> other heavy equipment outside of Georgia aster sites.<br />

4. The following protective measures shall be implemented with the construction of all<br />

firelines:<br />

a. H<strong>and</strong>lines shall be used for fireline construction within riparian corridors for all<br />

perennial, intermittent, <strong>and</strong> channelized ephemeral streams (see Forest Plan for<br />

riparian corridor minimum widths); <strong>and</strong><br />

b. Water bars or other water diversion structures shall be installed on firelines on<br />

slopes that exceed 2%. Firelines shall be smoothed <strong>and</strong> revegetate promptly<br />

after the prescribed bum is completed.<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!