FINAL<br />

FRANK SPRINGER & ASSOCIATES, INC.<br />

355 WEST GRAND AVE. SUITE 2, ESCONDIDO, CA 92025<br />

ENVIRONMENTAL ASSESSMENT<br />

FOR THE HOG LAKE ROAD<br />

IMPROVEMENT PROJECT<br />

RAMONA INDIAN RESERVATION<br />

ANZA, CA<br />

_________________________________<br />

Prepared For:<br />

_________________________________<br />

_<br />

Reservation Transportation Authority<br />

28860 Old Town Front Street, Suite C-1<br />

Temecula, CA 92590<br />

August 2011


TABLE OF CONTENTS<br />

Summary ........................................................................................................ 1<br />

Introduction .................................................................................................... 2<br />

Document Structure ........................................................................................... 3<br />

Chapter 1 – Purpose and Need ..................................................................... 4<br />

Background ........................................................................................................ 4<br />

Purpose and Need ............................................................................................. 9<br />

Forest Plan Consistency .................................................................................... 9<br />

Proposed Action ............................................................................................... 11<br />

Decision Framework ........................................................................................ 12<br />

Public Involvement ........................................................................................... 12<br />

Chapter 2 – Alternatives.............................................................................. 13<br />

The Proposed Action Alternative ...................................................................... 13<br />

The “No Action” Alternative .............................................................................. 20<br />

Comparison of Alternatives .............................................................................. 21<br />

Chapter 3 – Affected Environment and Environmental Consequences . 24<br />

Cumulative Effects ........................................................................................... 24<br />

Projects Considered When Determining Cumulative Impacts .......................... 25<br />

Air Quality ........................................................................................................ 29<br />

Aes<strong>the</strong>tics / Visual Resources.......................................................................... 37<br />

Biological Resources ....................................................................................... 38<br />

Heritage Resources ......................................................................................... 51<br />

Fire Risk ........................................................................................................... 54<br />

Land Use, Ownership, Easements, Traffic, and Road Maintenance ................ 56<br />

Socio-economic and Noise Effects .................................................................. 59<br />

Soil and Hydrology ........................................................................................... 61<br />

Chapter 4 - Consultation and Communication ......................................... 77<br />

References ................................................................................................... 78


LIST OF TABLES<br />

Table 1: Mitigation Measures / Design Criteria .........................................................15<br />

Table 2: Comparison of Alternatives ........................................................................21<br />

LIST OF FIGURES<br />

Figure 1: General Vicinity ...........................................................................................5<br />

Figure 2: Proposed Project Overview .........................................................................6<br />

Figure 3: Land Ownership and Proposed Easements ................................................8<br />

Figure 4: Typical Section With 2% Road Cross-Slope..............................................13<br />

Figure 5: 10’ x 5’ Double Box Culvert .......................................................................14<br />

Figure 6: Administrative Boundaries.........................................................................26<br />

Figure 7: Air Quality Management Districts .............................................................33<br />

Figure 8: Vegetation Communities ...........................................................................39<br />

Figure 9: Land Use ...................................................................................................58<br />

Figure 10: Soils ........................................................................................................70<br />

Figure 11: Geology ...................................................................................................71<br />

Figure 12: Watersheds and Wilderness Areas .........................................................74<br />

Figure 13: Jurisdictional Drainages ..........................................................................75


Ramona Hog Lake Road Improvement Project August 2011<br />

Summary<br />

The Reservation Transportation Authority (a consortium of 19 Sou<strong>the</strong>rn Cali<strong>for</strong>nia<br />

Indian tribes) proposes to implement <strong>the</strong> Hog Lake Road Improvement Project in two<br />

parts. The first part of <strong>the</strong> proposed Project will occur along Hog Lake Road, from<br />

<strong>the</strong> intersection of Wheat Road extending nor<strong>the</strong>ast to just past <strong>the</strong> first intersection<br />

inside <strong>the</strong> Reservation of <strong>the</strong> Ramona Band of Cahuilla Indians (Ramona<br />

Reservation) boundary. These <strong>road</strong> <strong>improvement</strong>s will occur on National Forest land<br />

and Ramona Reservation land. The first part of <strong>the</strong> <strong>road</strong> <strong>improvement</strong>s is presently<br />

funded The second part of <strong>the</strong> proposed Project will occur along Hog Lake Road,<br />

extending nor<strong>the</strong>ast from Bautista Road to Wheat Road. These <strong>road</strong> <strong>improvement</strong>s<br />

will occur on privately held land in <strong>the</strong> future, once funding has been secured. The<br />

U.S. Department of <strong>the</strong> Interior, Bureau of Indian Affairs (BIA) and <strong>the</strong> USDA Forest<br />

Service (Forest Service) will use this Environmental Assessment (EA) to meet <strong>the</strong><br />

federal <strong>environmental</strong> requirements of <strong>the</strong> National Environmental Policy Act (NEPA)<br />

and o<strong>the</strong>r relevant Federal and State laws and regulations,. Based upon <strong>the</strong> results<br />

of this EA, <strong>the</strong> BIA as Lead Agency and Forest Service as Cooperating Agency will<br />

decide whe<strong>the</strong>r a Finding of No Significant Impact (FONSI) should be issued or<br />

whe<strong>the</strong>r an Environmental Impact Statement (EIS) should be prepared.<br />

The paved route will facilitate safer, easier access <strong>for</strong> residents and provide <strong>for</strong><br />

improved emergency vehicle response time and evacuation route. The installation of<br />

striping and signage will improve <strong>road</strong> safety and navigation. Repair of structural<br />

deficiencies and improved drainage structures will prevent <strong>road</strong> erosion. In short, a<br />

<strong>road</strong> reconstructed, improved and frequently maintained will be much safer <strong>for</strong><br />

residents and visitors, and allow <strong>for</strong> better and more reliable all-season access. As <strong>the</strong><br />

<strong>road</strong> crosses federal, private and reservation lands, several easements along <strong>the</strong> <strong>road</strong><br />

are proposed. The <strong>road</strong> would be brought into <strong>the</strong> BIA transportation system, and <strong>the</strong><br />

BIA would assume future responsibilities <strong>for</strong> <strong>road</strong> reconstruction, <strong>improvement</strong> and<br />

maintenance. The proposed Project will, through issuance of <strong>the</strong>se easements, create<br />

efficiencies in <strong>road</strong> maintenance and management.<br />

Resources such as cultural sites, wildlife, plants, soil, and hydrology will be protected<br />

as directed by applicable Federal and State laws and regulations, as well as <strong>the</strong><br />

2006 San Bernardino National Forest Land Management Plan (LMP). There is<br />

suitable and occupied habitat <strong>for</strong> <strong>the</strong> Quino Checkerspot Butterfly in <strong>the</strong> area.<br />

Frank Springer & Associates, Inc. Page 1 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Introduction<br />

The Reservation Transportation Authority (RTA) is a consortium of 19 Sou<strong>the</strong>rn<br />

Cali<strong>for</strong>nia Indian tribes whose purpose is to plan, design and build <strong>road</strong>s on its<br />

members' reservations and to advocate <strong>for</strong> tribal transportation needs. The RTA<br />

proposes to implement <strong>the</strong> Hog Lake Road Improvement Project (Project) with<br />

funding assistance from <strong>the</strong> U.S. Department of <strong>the</strong> Interior, Bureau of Indian Affairs<br />

(BIA). The proposed Project will pave <strong>the</strong> surface of <strong>the</strong> Hog Lake Road, upgrade<br />

drainage structures, correct <strong>road</strong> structure deficiencies, provide better emergency<br />

vehicle access to <strong>the</strong> Ramona Reservation, and improve safety through <strong>the</strong><br />

installation of signs and striping on U.S. Department of Agriculture, Forest Service<br />

(Forest Service), National Forest System lands and privately held lands owned by<br />

<strong>the</strong> Ramona Band of Cahuilla Indians (Ramona Tribe) and ano<strong>the</strong>r private individual.<br />

Initially <strong>for</strong>med in 1998, <strong>the</strong> RTA is a joint, subordinate branch of its member tribal<br />

governments and is recognized by <strong>the</strong> federal government as <strong>the</strong> equivalent of a<br />

tribal government agency. Each member tribal government appoints one Director to<br />

represent it on <strong>the</strong> RTA Board of Directors. The Board of Directors elects five<br />

Directors who serve as <strong>the</strong> RTA Executive Board, which is responsible <strong>for</strong> RTA<br />

management. RTA funding is made available through Public Law 93-638 federal<br />

contracts to carry out <strong>the</strong> BIA Tribal Roads Construction as well as grants and<br />

contracts <strong>for</strong> o<strong>the</strong>r transportation-related activities and <strong>project</strong>s from local, state, and<br />

federal agencies.<br />

The Hog Lake Road Improvement Project has been designated a “high priority<br />

<strong>project</strong>” by <strong>the</strong> RTA and BIA. The Forest Service has previously granted <strong>the</strong> Ramona<br />

Tribe a temporary <strong>road</strong> use permit <strong>for</strong> Hog Lake Road; however this permit expired.<br />

Pursuant to 16 USC 551 and 36 CFR 261.50(a) and (b), and to protect natural<br />

resources and provide <strong>for</strong> public safety, National Forest <strong>road</strong>s are subject to closure<br />

by Forest Order <strong>for</strong> a variety of reasons. The Reservation’s “isolated in-holding”<br />

status warrants a year around long term access authorization.<br />

In conjunction with proposed <strong>road</strong> <strong>improvement</strong>s, several easements are proposed<br />

through federal, private and reservation lands in order to provide reasonable public<br />

and tribal access as well as to assign <strong>road</strong> maintenance responsibilities to <strong>the</strong><br />

appropriate parties (see Figure 3).<br />

The BIA will serve as lead Federal agency <strong>for</strong> compliance with <strong>the</strong> National<br />

Environmental Policy Act (NEPA), consultation under Section 7 of <strong>the</strong> Endangered<br />

Species Act (ESA), and Section 106 of <strong>the</strong> National Historic Preservation Act<br />

(NHPA), with <strong>the</strong> Forest Service participating as a Cooperating Agency. The BIA and<br />

Forest Service will use this EA to determine whe<strong>the</strong>r <strong>the</strong> proposed Project will result<br />

in significant impacts to <strong>the</strong> environment and whe<strong>the</strong>r a Finding of No Significant<br />

Impact (FONSI) should be issued or an EIS should be prepared.<br />

Frank Springer & Associates, Inc. Page 2 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

The Regional Director, Pacific Regional Office <strong>for</strong> <strong>the</strong> BIA is <strong>the</strong> deciding official <strong>for</strong><br />

<strong>the</strong> BIA. The Regional Forester, Pacific Southwest Regional Office is <strong>the</strong> responsible<br />

official <strong>for</strong> <strong>the</strong> Forest Service.<br />

Document Structure<br />

At <strong>the</strong> direction of <strong>the</strong> RTA, Frank Springer & Associates, Inc. has prepared this EA<br />

in compliance with NEPA and o<strong>the</strong>r relevant Federal and State laws and regulations.<br />

This EA discloses <strong>the</strong> direct, indirect, and cumulative <strong>environmental</strong> impacts that<br />

would result from <strong>the</strong> proposed action and alternatives. The proposed Project will<br />

comply with all local, state and federal laws, regulations and policies including but<br />

not limited to <strong>the</strong> National Forest Management Act, <strong>the</strong> Endangered Species Act,<br />

and <strong>the</strong> San Bernardino National Forest Land Management Plan (2006) (LMP). The<br />

document is organized into four parts:<br />

Chapter 1. Purpose and Need: This chapter includes in<strong>for</strong>mation on <strong>the</strong><br />

history of <strong>the</strong> Project proposal, <strong>the</strong> purpose of and need <strong>for</strong> <strong>the</strong> Project, and<br />

briefly describes <strong>the</strong> agency’s proposal <strong>for</strong> achieving that purpose and need.<br />

This section also details how <strong>the</strong> Forest Service in<strong>for</strong>med <strong>the</strong> public of <strong>the</strong><br />

proposal and how <strong>the</strong> public responded.<br />

Chapter 2. Alternatives: This chapter provides a detailed description of <strong>the</strong><br />

RTA’s proposed action as well as alternative methods <strong>for</strong> achieving <strong>the</strong> stated<br />

purpose. These alternatives were developed based on issues raised by <strong>the</strong><br />

public and o<strong>the</strong>r agencies. This discussion also includes mitigation measures.<br />

Finally, this section provides a summary table of <strong>the</strong> <strong>environmental</strong><br />

consequences associated with each alternative.<br />

Chapter 3. Affected Environment and Environmental Consequences: This<br />

section describes <strong>the</strong> <strong>environmental</strong> effects of implementing <strong>the</strong> proposed<br />

action and o<strong>the</strong>r alternatives. This analysis is organized by resource area.<br />

Within each section, <strong>the</strong> affected environment is described first, followed by <strong>the</strong><br />

effects of <strong>the</strong> No Action Alternative that provides a baseline <strong>for</strong> evaluation and<br />

comparison of <strong>the</strong> o<strong>the</strong>r alternatives that follow.<br />

Chapter 4. Consultation and Coordination: This chapter provides a list of<br />

agencies consulted during <strong>the</strong> development of <strong>the</strong> <strong>environmental</strong> <strong>assessment</strong>.<br />

Additional documentation, including more detailed analyses of Project-area<br />

resources, may be found in <strong>the</strong> Project planning record located at <strong>the</strong> San<br />

Bernardino National Forest, San Jacinto Ranger District, Ranger Station located at<br />

54270 Pine Crest Road, Idyllwild, CA 92549, phone number: 909-382-2922.<br />

Frank Springer & Associates, Inc. Page 3 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Chapter 1 – Purpose and Need<br />

Background<br />

The Ramona Reservation is located approximately 30 miles east of <strong>the</strong> City of<br />

Temecula and 4 miles north of <strong>the</strong> town of Anza in Riverside County, Cali<strong>for</strong>nia, as<br />

indicated in Figure 1, General Location. The Ramona Reservation occupies<br />

approximately 560 acres near Thomas Mountain. Hog Lake Road, also known as<br />

Forest Service Route 6S18, provides <strong>the</strong> sole means of <strong>road</strong> access to <strong>the</strong> Ramona<br />

Reservation, and is consequently extremely important to <strong>the</strong> Ramona Tribe. Besides<br />

crossing private parcels, outside <strong>the</strong> Forest boundary, <strong>the</strong> <strong>road</strong> crosses federal<br />

parcels managed by <strong>the</strong> Forest Service be<strong>for</strong>e entering <strong>the</strong> Ramona Reservation.<br />

Nearby transportation routes include U.S. 371 to <strong>the</strong> south and State Highway 74 to<br />

<strong>the</strong> east.<br />

As illustrated in Figure 2, Proposed Project Overview, <strong>the</strong> <strong>project</strong> consists of two<br />

parts. The first part begins on Hog Lake Road at <strong>the</strong> intersection of Wheat Road,<br />

and extends nor<strong>the</strong>ast along Hog Lake Road <strong>for</strong> 6,390 feet through National Forest<br />

System land and a fur<strong>the</strong>r 987 feet north through Ramona Reservation land,<br />

terminating just past <strong>the</strong> first intersection past <strong>the</strong> Reservation boundary. The<br />

second part of <strong>the</strong> Project begins at <strong>the</strong> intersection of Hog Lake Road and Bautista<br />

Road and extends 1,096 feet nor<strong>the</strong>ast along Hog Lake Road, through privately<br />

owned land to <strong>the</strong> intersection of Hog Lake Road and Wheat Road. This document<br />

addresses <strong>the</strong> federal <strong>environmental</strong> NEPA requirements <strong>for</strong> both parts of <strong>the</strong><br />

Project. Due to <strong>the</strong> second part of <strong>the</strong> <strong>project</strong> occurring on privately held lands,<br />

implementation of <strong>the</strong> second part will require CEQA compliance in order to meet<br />

State and County requirements. The in<strong>for</strong>mation contained within this EA may be<br />

used in partial fulfillment of those requirements.<br />

Hog Lake Road is a 8,473 foot-long unpaved <strong>road</strong> extending nor<strong>the</strong>ast from Bautista<br />

Road to <strong>the</strong> Ramona Reservation, and <strong>the</strong>n turns north through <strong>the</strong> Ramona<br />

Reservation. The proposed <strong>road</strong> <strong>improvement</strong>s extend through Township 7 South,<br />

Range 2 East, Section 1; Township 6 South, Range 2 East, Section 36; and<br />

Township 6 South, Range 3 East, Section 30 and 31; within <strong>the</strong> Anza Quadrangle.<br />

Federal lands underlie Hog Lake Road beginning at <strong>the</strong> intersection of Wheat Road,<br />

at <strong>the</strong> Forest Boundary, and extend nor<strong>the</strong>ast along Hog Lake Road <strong>for</strong> 6,390 feet to<br />

<strong>the</strong> Ramona Indian Reservation Boundary. Construction activity will extend a fur<strong>the</strong>r<br />

987 feet nor<strong>the</strong>ast through <strong>the</strong> Reservation, terminating just past <strong>the</strong> first <strong>road</strong><br />

intersection. Non-federal privately held lands begin at <strong>the</strong> intersection of Hog Lake<br />

Road and Bautista Road and extend 1,096 feet nor<strong>the</strong>ast to Wheat Road, at <strong>the</strong><br />

Forest Boundary.<br />

Frank Springer & Associates, Inc. Page 4 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Figure 1: General Vicinity<br />

Frank Springer & Associates, Inc. Page 5 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Figure 2: Proposed Project Overview<br />

Frank Springer & Associates, Inc. Page 6 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Hog Lake Road has structural problems caused by inadequate drainage. The width<br />

of <strong>the</strong> <strong>road</strong> varies and is difficult to maintain. Line of sight is insufficient along many<br />

lengths of <strong>the</strong> <strong>road</strong>, presenting safety concerns. Heavy rain, ice or snow on <strong>the</strong><br />

<strong>road</strong>.in winter often prevents access to <strong>the</strong> Ramona Reservation, as poor wea<strong>the</strong>r<br />

makes <strong>the</strong> already poor <strong>road</strong> conditions even more treacherous. Emergency vehicle<br />

access to <strong>the</strong> Ramona Reservation is presently slowed due to poor <strong>road</strong> conditions<br />

and a lack of signage. An improved access <strong>road</strong> would allow faster, more efficient<br />

navigation and access <strong>for</strong> emergency vehicles.<br />

As seen in Figure 2, Hog Lake Road crosses over two privately owned parcels. The<br />

travel route crossing <strong>the</strong> private land is not recognized in <strong>the</strong> County Transportation<br />

System. Nei<strong>the</strong>r <strong>the</strong> Forest Service nor <strong>the</strong> BIA has a recorded easement across <strong>the</strong><br />

private lands, <strong>the</strong> Reservation or Forest lands, respectively. As part of this Proposed<br />

Action, land use easements along NFR 6S18 alignment will be issued to <strong>the</strong> Forest<br />

Service across <strong>the</strong> private and Ramona Reservation lands and <strong>the</strong> BIA will be issued<br />

easements on behalf of <strong>the</strong> Ramona Tribe across <strong>the</strong> private and National Forest<br />

System lands (see Figure 3).<br />

Frank Springer & Associates, Inc. Page 7 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Figure 3: Land Ownership and Proposed Easements<br />

Frank Springer & Associates, Inc. Page 8 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Purpose and Need<br />

There is a need <strong>for</strong> safe access to and from <strong>the</strong> Ramona Reservation. The current<br />

condition of <strong>the</strong> <strong>road</strong> does not meet <strong>the</strong> needs of public safety or resource<br />

conditions. There is also a need to resolve right-of-way and <strong>road</strong> maintenance<br />

issues.<br />

There is a need <strong>for</strong> safer, easier access to <strong>the</strong> Ramona Reservation <strong>for</strong> residents and<br />

Tribal members and <strong>for</strong> improved emergency vehicle response time. The current<br />

access <strong>road</strong> is unsafe due to lack of striping, inadequate signage, and poor visibility<br />

(line of sight). In addition, various structural deficiencies are causing <strong>road</strong> and soil<br />

erosion. In short, a <strong>road</strong> reconstructed, improved and frequently maintained would be<br />

much safer <strong>for</strong> residents and visitors, and allow <strong>for</strong> better and more reliable all-season<br />

access.<br />

There is also a need <strong>for</strong> right of ways through both tribal, private, and national <strong>for</strong>est<br />

lands. The current landownership pattern requires tribal members to cross national<br />

<strong>for</strong>est lands and private lands to access <strong>the</strong> reservation. Similarly, access to national<br />

<strong>for</strong>est lands is through both reservation and private land. Right of access is not legally<br />

established through <strong>the</strong> several ownerships. It is desirable that both public and tribal<br />

access issues be resolved due to current inefficiencies in <strong>road</strong> maintenance and<br />

Forest Service inability to meet land management goals.<br />

In addition, <strong>the</strong>re is a need to reconcile <strong>road</strong> construction standards between <strong>the</strong> BIA<br />

and Forest Service. The BIA designs stream crossings to a 25 – year flood standard<br />

while <strong>the</strong> USFS Land and Resource Management Plan requires that such structures<br />

be constructed to a 50 –year standard.<br />

Forest Plan Management Direction<br />

One primary goal of <strong>the</strong> Forest Plan that would be met is <strong>the</strong> establishment and<br />

maintenance of strong relationships and partnerships with Native American tribes. A<br />

desired condition stated in <strong>the</strong> LMP is, “…<strong>the</strong> national <strong>for</strong>ests are maintained in a<br />

condition so that tribes and o<strong>the</strong>r Native American groups and individuals can exercise<br />

and retain traditional connections to <strong>the</strong> land and to foster both traditional and<br />

contemporary cultural uses of <strong>the</strong> national <strong>for</strong>ests.” Implementation of this proposed<br />

Project will help <strong>the</strong> Forest to meet this objective.<br />

Wildfire prevention and community protection is a priority of <strong>the</strong> Forest. The Ramona<br />

Reservation is in a region which has historically been at high risk <strong>for</strong> wildfires. There<br />

is an existing fire break (NFR 6S20) that traverses <strong>the</strong> length of <strong>the</strong> reservation<br />

which is considered strategically valuable in preventing <strong>the</strong> spread of a wildfire or<br />

structure fire in <strong>the</strong> area. Hog Lake Road provides <strong>the</strong> most direct vehicle access to<br />

<strong>the</strong> Ramona Reservation; <strong>the</strong>re<strong>for</strong>e <strong>the</strong> deteriorated <strong>road</strong> conditions are of particular<br />

concern during times when rapid evacuation is required. An improved <strong>road</strong> would<br />

Frank Springer & Associates, Inc. Page 9 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

provide <strong>for</strong> safer, faster evacuation <strong>for</strong> <strong>the</strong> Ramona Tribe and a more efficient means<br />

of access <strong>for</strong> fire and o<strong>the</strong>r emergency vehicles to get to <strong>the</strong> Reservation.<br />

The goals of <strong>the</strong> LMP include <strong>the</strong> conservation of federally listed species habitats,<br />

and <strong>the</strong> recovery or movement towards recovery, of listed species. This Project is<br />

consistent with management direction <strong>for</strong> threatened, endangered, proposed,<br />

candidate, and sensitive species management contained in Part 2 of <strong>the</strong> LMP.<br />

Resources such as wildlife, plants, soil, and hydrology will be protected as directed<br />

in <strong>the</strong> LMP. There is suitable and occupied habitat <strong>for</strong> <strong>the</strong> federally endangered<br />

Quino checkerspot butterfly in <strong>the</strong> area. Mitigations/design criteria as specified in<br />

<strong>the</strong> Section 7 consultation with U.S. Fish and Wildlife Service will be incorporated to<br />

ensure that all resources are protected and any potential conflicts are avoided.<br />

The Project area is located within <strong>the</strong> Back Country Land Use Zone and <strong>the</strong> Anza<br />

“Place”. Suitable Zone activities include:<br />

Public motorized use on National Forest System Roads<br />

Road re-construction;<br />

The establishment of community protection areas and<br />

Fuelbreak construction<br />

The Anza “Place”, as described in <strong>the</strong> LMP, has unique features that need to be<br />

given attention when <strong>project</strong>s are proposed. The nearby Bautista Creek has been<br />

designated a Wild & Scenic River, and <strong>the</strong> Quino checkerspot butterfly occupied<br />

habitat adjacent to Hog Lake Road. The southwest slope of Thomas Mountain also<br />

figures prominently in <strong>the</strong> Anza “Place”. The proposed Project is consistent with <strong>the</strong><br />

direction in <strong>the</strong> LMP <strong>for</strong> <strong>the</strong> Anza “Place”.<br />

Forest Service Policy<br />

Direction from <strong>the</strong> Forest Service Manual, Roads and Rights-of-way section 2730.2,<br />

states among <strong>the</strong> objectives to "accommodate <strong>the</strong> access needs <strong>for</strong> <strong>the</strong> protection,<br />

development, and utilization of lands and resources owned by private interests …<br />

when <strong>the</strong> planned <strong>for</strong>est development <strong>road</strong> system and public <strong>road</strong> system do not<br />

meet those needs adequately.” Implementation of <strong>the</strong> Proposed Action would provide<br />

better access to adjacent Forest Service land, as well as improved access <strong>for</strong><br />

residents who use this <strong>road</strong> as a primary means of access.<br />

An additional Forest Service Manual objective is to “protect and enhance <strong>the</strong> quality<br />

of air … of Forest Service administered lands in <strong>the</strong> granting of any right-of-way.” Air<br />

pollution by particulate matter is a matter of concern in Cali<strong>for</strong>nia. Fine Particulate<br />

Matter (PM) is comprised of dust, dirt, soot, smoke, and o<strong>the</strong>r particulates from<br />

sources such as wind, fires, transportation, and industry. The U.S. Environmental<br />

Protection Agency (EPA) has designated <strong>the</strong> County of Riverside as an area of<br />

Frank Springer & Associates, Inc. Page 10 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

“serious” non-attainment area <strong>for</strong> fine particulate matter (PM10). Paving Hog Lake<br />

Road would help improve air quality in <strong>the</strong> immediate area, as it would decrease<br />

fugitive dust production by vehicles driving on <strong>the</strong> <strong>road</strong>. This would enhance <strong>the</strong><br />

quality of wildlife and botanical resources adjacent to <strong>the</strong> <strong>project</strong> area. Paving <strong>the</strong><br />

<strong>road</strong> would also decrease noise caused by vehicles traversing <strong>the</strong> <strong>road</strong>.<br />

The National Forest Management Act (NFMA) gives direction on providing diversity<br />

of plant and animal communities, and <strong>for</strong> providing habitat to maintain viable<br />

populations of existing native and desired non-native vertebrate species in planning<br />

areas. Fur<strong>the</strong>r direction is given in <strong>the</strong> 1983 USDA Departmental Regulation 9500-4<br />

that habitats <strong>for</strong> all existing native and desired non-native wildlife species will be<br />

managed to maintain at least viable populations of such species. The regulations at<br />

36 CFR 219.20 give direction on ecological sustainability, including species diversity<br />

and providing <strong>for</strong> viability of wildlife populations.<br />

Proposed Action<br />

The proposed Project involves <strong>the</strong> paving of Hog Lake Road, site preparation, and<br />

<strong>the</strong> installation of asphalt-concrete berms, downdrains, and rip-rap <strong>for</strong> <strong>the</strong> box culvert<br />

under <strong>the</strong> <strong>road</strong>. Only very minor <strong>road</strong> cuts and fills will be required except at <strong>the</strong> box<br />

culvert structure proposed at an intermittent blue line stream crossing. The culvert<br />

design will require a Forest Plan amendment in order to accommodate <strong>the</strong> smaller<br />

BIA standard design <strong>for</strong> a 25-year flood event ra<strong>the</strong>r than a Forest Service standard<br />

50-year flood event.<br />

Paving and re-designing of <strong>road</strong> structures will occur in such a way as to minimize<br />

<strong>environmental</strong>, economic, and social impacts on <strong>the</strong> surrounding area, and meet <strong>the</strong><br />

requirements of NEPA.<br />

The great majority of paving would occur on disturbed land which is already in use as<br />

<strong>the</strong> existing unpaved <strong>road</strong>. Hog Lake Road has an average width of approximately 30<br />

feet, and <strong>the</strong> proposed paved <strong>road</strong> would be 22 feet in width with 2 foot shoulders.<br />

Except in <strong>the</strong> relatively small area where box culvert would be installed, no <strong>road</strong><br />

widening and very minimal grading would be required.<br />

New easements will be granted by and to <strong>the</strong> BIA, Ramona Tribe, Forest Service, and<br />

<strong>the</strong> owner of APN 572-050-048, a parcel of land located between <strong>the</strong> Ramona Tribe’s<br />

privately held parcel of land and National Forest Land.<br />

The entire <strong>road</strong> within <strong>the</strong> Project area will be brought into <strong>the</strong> BIA Transportation<br />

System and <strong>the</strong> BIA will assume responsibility <strong>for</strong> <strong>road</strong> reconstruction, <strong>improvement</strong>,<br />

and maintenance. The ownership and/or stewardship of <strong>the</strong> underlying estate,<br />

however, would remain unchanged.<br />

Resources such as cultural sites, wildlife, plants, soil, and hydrology will be protected<br />

as directed in <strong>the</strong> LMP. Design criteria/mitigation measures addressing various<br />

Frank Springer & Associates, Inc. Page 11 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

resource elements will be incorporated into proposed actions to ensure that all<br />

resources are protected and any potential conflicts are avoided . Site-specific<br />

management techniques and applicable guidance from <strong>the</strong> Forest Land Management<br />

Plan and Forest Service Handbook will be followed when conducting activities within<br />

riparian conservation areas (RCAs).<br />

Decision Framework<br />

Responsible Officials: The responsible official <strong>for</strong> BIA is Amy Dutschke, Regional<br />

Director, Pacific Regional Office. The responsible official <strong>for</strong> <strong>the</strong> Forest Service is<br />

<strong>the</strong> Regional Forester, Pacific Southwest Region. A decision will be made to<br />

implement <strong>the</strong> proposed action, modify <strong>the</strong> proposed action, take no action, or<br />

decide if preparation of an EIS is required according to applicable law, regulation<br />

and policy.<br />

Conveyance Signatories: The conveying official <strong>for</strong> BIA is Robert J. Eben,<br />

Superintendent <strong>for</strong> <strong>the</strong> Sou<strong>the</strong>rn Cali<strong>for</strong>nia Agency, Bureau of Indian Affairs<br />

Riverside, Cali<strong>for</strong>nia. The conveying official <strong>for</strong> <strong>the</strong> Forest Service is <strong>the</strong> Regional<br />

Forester, Pacific Southwest Region..<br />

Public Involvement<br />

On February 2, 2009, a scoping letter was sent to individuals, permit holders,<br />

organizations, agencies and Tribal governments who had previously shown an<br />

interest in <strong>the</strong> Forest route inventory or land management actions. The letter<br />

requested comments on <strong>the</strong> proposed action be made during <strong>the</strong> scoping period of<br />

February 5, 2009 to March 6, 2009.<br />

On February 5th, 2009, a notice was published in <strong>the</strong> Idyllwild Town Crier. The<br />

proposal and associated maps were listed on <strong>the</strong> Forest’s Schedule of Proposed<br />

Actions (SOPA) on April 1, 2009. The listing can be found on <strong>the</strong> FOREST Public<br />

website at http://data.ecosystemmanagement.org/nepaweb/nepa_content.php?<strong>project</strong>=28498.<br />

During <strong>the</strong> scoping process, four (4) comments from <strong>the</strong> public were received.<br />

Comments from <strong>the</strong> public and o<strong>the</strong>r agencies are used to <strong>for</strong>mulate issues<br />

concerning <strong>the</strong> proposed action. An issue is a matter of public concern regarding <strong>the</strong><br />

proposed action and its <strong>environmental</strong> impacts.<br />

No issues of importance were raised from <strong>the</strong> four comments received.<br />

Two comments were in full support of <strong>the</strong> <strong>project</strong>.<br />

Two comments were outside of <strong>the</strong> scope of this <strong>project</strong> as <strong>the</strong>ir main concern<br />

was <strong>the</strong> use of federal tax dollars, <strong>the</strong> small number of people <strong>the</strong>y perceived<br />

would benefit (<strong>the</strong> few reservation residents) and desire to pave different <strong>road</strong>s in<br />

<strong>the</strong> Anza area that <strong>the</strong>y perceived would benefit a greater number of people. The<br />

Frank Springer & Associates, Inc. Page 12 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

proposed <strong>project</strong> was requested by <strong>the</strong> Sovereign Nation of <strong>the</strong> Ramona Tribe<br />

and <strong>the</strong> RTA. It would cross Federal Forest System lands and is funded by Tribal<br />

government.<br />

One comment additionally requested in<strong>for</strong>mation be more available in <strong>the</strong> local<br />

Anza publications. The <strong>project</strong> mailing list has been updated with <strong>the</strong> local<br />

contacts requested.<br />

Chapter 2 – Alternatives<br />

This chapter describes and compares <strong>the</strong> alternatives considered <strong>for</strong> <strong>the</strong> Hog Lake<br />

Road Improvement Project EA. It describes both alternatives considered in detail<br />

and those eliminated from detailed study. The end of this chapter presents <strong>the</strong><br />

alternatives in a table so that <strong>the</strong> alternatives and <strong>the</strong>ir <strong>environmental</strong> impacts can be<br />

readily compared.<br />

The Proposed Action Alternative<br />

The existing Hog Lake Road, within <strong>the</strong> Project area, will be paved and reconstructed<br />

with <strong>the</strong> installation of asphalt-concrete berms, downdrains, a box culvert, and rip-rap<br />

<strong>for</strong> <strong>the</strong> box culvert under <strong>the</strong> <strong>road</strong>. Approximately 800 lineal feet of <strong>the</strong> proposed<br />

<strong>improvement</strong>s are located on <strong>the</strong> Ramona Reservation and 6,700 feet are on National<br />

Forest System lands. The paved <strong>road</strong> specifications will be: 22 feet in width with 2 foot<br />

shoulders, within a right-of-way width of 50 feet, except <strong>for</strong> “pop outs” <strong>for</strong> some<br />

drainage structures. As illustrated below in Figure 4, a 2% cross-slope section<br />

approach is proposed which would enable natural drainage courses and patterns to be<br />

maintained, as <strong>the</strong> present <strong>road</strong> is generally at cross-slopes of approximately 2%.<br />

Figure 4: Typical Section With 2% Road Cross-Slope<br />

Frank Springer & Associates, Inc. Page 13 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

As illustrated in Figure 5, a 10’ x 5’ double box culvert is proposed at <strong>the</strong> crossing of<br />

<strong>the</strong> existing <strong>road</strong> with <strong>the</strong> intermittent blue-line stream to provide all-wea<strong>the</strong>r access.<br />

This culvert is designed to BIA requirements <strong>for</strong> a 25 year flood event. The design will<br />

require a site specific Forest Plan amendment in order to accommodate <strong>the</strong> smaller<br />

BIA design, as <strong>the</strong> Forest LMP calls <strong>for</strong> culverts designed to accommodate 50 year<br />

events (page 19 and 20 of 33). The amendment will apply only to this area of this<br />

<strong>project</strong>. Only very minor <strong>road</strong> cuts and fills will be required except at <strong>the</strong> box culvert<br />

structure. Paving and re-designing of <strong>road</strong> structures will occur in such a way as to<br />

minimize <strong>environmental</strong>, economic, and social impacts on <strong>the</strong> surrounding area, and<br />

meet <strong>the</strong> requirements of NEPA.<br />

National Forest Road 6S18 (Hog Lake Road) is <strong>the</strong> only potentially year round System<br />

<strong>road</strong> with a direct connection from <strong>the</strong> Reservation to a dedicated year round County<br />

Road (Bautista) outside <strong>the</strong> Forest boundary. The great majority of paving would<br />

occur on encumbered land which is already in use as <strong>the</strong> existing unpaved <strong>road</strong>. Hog<br />

Lake Road has an average width of approximately 30 feet, and <strong>the</strong> proposed paved<br />

<strong>road</strong> would be 22 feet in width with 2 foot shoulders. Except in <strong>the</strong> relatively small area<br />

where <strong>the</strong> 10’ x 5’ double box culvert structure would be installed, no <strong>road</strong> widening<br />

and very minimal grading would be required.<br />

Figure 5: 10’ x 5’ Double Box Culvert<br />

New easements will be granted by and to <strong>the</strong> BIA, Ramona Tribe, Forest Service, and<br />

<strong>the</strong> owner of APN 572-050-048, which is a parcel of land located between <strong>the</strong> Ramona<br />

Tribe’s privately held parcel of land and National Forest Land. Newly created<br />

easements that fall within <strong>the</strong> Project area include <strong>the</strong> following (see Figure 3):<br />

A non-exclusive public <strong>road</strong> easement over those parts of Hog Lake Road<br />

passing over National Forest Land will be granted by <strong>the</strong> Forest Service to<br />

Frank Springer & Associates, Inc. Page 14 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

<strong>the</strong> BIA, on behalf of <strong>the</strong> Ramona Tribe.<br />

A non-exclusive public <strong>road</strong> easement over those parts of Hog Lake Road<br />

passing over private land held by <strong>the</strong> Ramona Tribe will be granted by <strong>the</strong><br />

Ramona Tribe to <strong>the</strong> Forest Service, <strong>the</strong> owner of APN 572-050-048, and<br />

<strong>the</strong> BIA.<br />

A non-exclusive public <strong>road</strong> easement over those parts of Hog Lake Road<br />

passing over private land owned by <strong>the</strong> owner of APN 572-050-048 will be<br />

granted by <strong>the</strong> owner of APN 572-050-048 to <strong>the</strong> Ramona Tribe, <strong>the</strong> Forest<br />

Service and <strong>the</strong> BIA<br />

A non-exclusive public <strong>road</strong> easement over those parts of Hog Lake Road<br />

passing over Ramona Reservation land will be granted by <strong>the</strong> BIA, on<br />

behalf of <strong>the</strong> Ramona Tribe, to <strong>the</strong> Forest Service.<br />

The <strong>road</strong> would be brought into <strong>the</strong> BIA transportation system and <strong>the</strong> BIA would<br />

assume future responsibilities <strong>for</strong> <strong>road</strong> reconstruction, <strong>improvement</strong> and maintenance.<br />

The ownership and/or stewardship of <strong>the</strong> underlying estate, however, would remain<br />

unchanged. A shifting of jurisdiction of <strong>the</strong> maintenance responsibilities is not <strong>the</strong><br />

same as changing underlying land ownership. No change in title is proposed.<br />

Generation of <strong>the</strong> easement documents will be followed by Construction Stipulations,<br />

Road Maintenance Agreement and Fire Plan to ensure standards in all activities are<br />

matters of agreement.<br />

Resources such as cultural sites, wildlife, plants, soil, and hydrology will be protected<br />

as directed in <strong>the</strong> LMP<br />

Mitigation Measures / Design Criteria<br />

Mitigation measures / design criteria addressing various resource elements will be<br />

incorporated into proposed action to ensure that all resources are protected and any<br />

potential conflicts are avoided.<br />

Table 1: Mitigation Measures / Design Criteria<br />

Resource Mitigation Method / Design Criteria<br />

Air Quality<br />

Fugitive Dust<br />

and Exhaust<br />

Emissions<br />

During grading and earthwork activities, <strong>the</strong> following<br />

mitigation measures / design criteria shall be employed to<br />

minimize <strong>the</strong> emission of pollutants during <strong>the</strong> construction<br />

activities:<br />

AIR-1: Total construction areas disturbed by clearing,<br />

earthmoving, or excavation shall be minimized.<br />

Frank Springer & Associates, Inc. Page 15 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Resource Mitigation Method / Design Criteria<br />

Biological Resources<br />

Quino<br />

Checkerspot<br />

Butterfly<br />

AIR-2: Dust suppression techniques shall be employed, such<br />

as watering during construction activities to prevent (or<br />

suppress) <strong>the</strong> fine particulate from leaving <strong>the</strong> surface and<br />

becoming airborne through <strong>the</strong> action of mechanical<br />

disturbance or wind. Watering of exposed soils in traffic areas<br />

and covering stockpiles of sand, soil and similar materials on<br />

construction sites (minimum twice daily)<br />

AIR-3: The load of all haul trucks shall be covered;<br />

AIR-4: Truck speeds on unpaved surfaces shall be limited to<br />

15 miles per hour;<br />

AIR-5: Stationary and mobile equipment shall be maintained<br />

in proper working order, i.e., tuned <strong>for</strong> maximum efficiency<br />

per manufacturer’s specifications;<br />

AIR-6: Cleaning loose soil from construction vehicles be<strong>for</strong>e<br />

exiting <strong>the</strong> work site; and<br />

AIR-7: Restricting or prohibiting work on days of high winds<br />

(>30 mph) or when air quality is very poor.<br />

BIO-1: In order to compensate <strong>for</strong> <strong>the</strong> loss of 0.15 acres of<br />

Red Shank Chamise Chaparral, mitigation credits shall be<br />

purchased at no less than a 1:1 ratio at <strong>the</strong> Wilson Creek<br />

Mitigation Bank or o<strong>the</strong>r suitable (USFWS approved) bank, or<br />

mitigated in <strong>the</strong> Project area, on lands designated and<br />

approved by <strong>the</strong> USFWS.<br />

BIO-2: All <strong>road</strong> grading work shall be conducted outside of<br />

<strong>the</strong> adult Quino checkerspot butterfly flight season and <strong>the</strong><br />

growth season <strong>for</strong> Quino checkerspot butterfly host plants -<br />

February 1 – July 31.<br />

BIO-3: Standard Best Management Practices (BMPs) will be<br />

employed to limit <strong>the</strong> release of fugitive dust. See AQ-1<br />

through AQ-7.<br />

Frank Springer & Associates, Inc. Page 16 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Resource Mitigation Method / Design Criteria<br />

Sensitive and<br />

Watch List<br />

Species<br />

A qualified biological monitor shall be present during all<br />

construction activities to consult on minimizing impacts and<br />

monitor implementation of permit conditions. The biological<br />

monitor will:<br />

BIO-4: Conduct a preconstruction walk-over to identify<br />

any new sensitive species within <strong>the</strong> Project impact<br />

area. If located, impacts will be assessed by <strong>the</strong><br />

biological supervisor and recommendations made.<br />

BIO-5: Monitor <strong>the</strong> limits of impacts and construction<br />

and verify that work areas are fenced with highly<br />

visible fencing (e.g., orange construction fencing) to<br />

ensure impacts do not occur outside of <strong>the</strong> Project<br />

footprint.<br />

BIO-6: Walk around and look under machinery each<br />

morning to flush any wildlife.<br />

BIO-7: After construction is complete, <strong>the</strong> speed limit on <strong>the</strong><br />

<strong>road</strong> will be set at 25 mph, and will be en<strong>for</strong>ced by <strong>the</strong><br />

Ramona Tribe.<br />

BIO-8: Road signs will be erected along <strong>the</strong> <strong>road</strong>way asking<br />

motorists to stay on <strong>the</strong> <strong>road</strong> and observe <strong>the</strong> speed limit and<br />

educating <strong>the</strong>m about <strong>the</strong> presence of sensitive and<br />

endangered species in <strong>the</strong> area, to reduce <strong>the</strong> potential <strong>for</strong><br />

pull-offs and future habitat or sensitive plant impacts.<br />

BIO-9: Routine <strong>road</strong> maintenance activities shall be<br />

scheduled to occur between July 1 and February 1. If cases<br />

occur where maintenance activities are required <strong>for</strong> public<br />

safety, <strong>the</strong>n prior to conducting any maintenance, <strong>the</strong><br />

Ramona Tribe will contact <strong>the</strong> US FWS by telephone or<br />

email, in<strong>for</strong>m <strong>the</strong>m of <strong>the</strong> situation prior to conducting <strong>the</strong><br />

maintenance, and follow any precautions or mitigation<br />

measures provided by <strong>the</strong> US FWS that would minimize<br />

impacts to Quino.<br />

BIO-1 and BIO-3 through BIO-8 Additionally:<br />

Frank Springer & Associates, Inc. Page 17 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Resource Mitigation Method / Design Criteria<br />

BIO-10: All refuse created or brought on site by construction<br />

personnel or contractors must be placed in covered<br />

containers, removed from <strong>the</strong> site daily and disposed of<br />

properly.<br />

BIO-11: The Biological Monitor shall examine <strong>the</strong> Project<br />

vicinity <strong>for</strong> any bird nests (tree, cavity, or ground) in which<br />

fledging has not occurred. If any are found during layout and<br />

marking or implementation, <strong>the</strong> Project biologist will evaluate<br />

and recommend protection measures.<br />

Management<br />

Indicator Species BIO-1, BIO-3-8, BIO-10 -11. See Above.<br />

Migratory Birds BIO-1, BIO-4, BIO-6, BIO-11. See Above.<br />

Weed Risk BIO-13: All heavy equipment used on this Project will be<br />

cleaned and inspected be<strong>for</strong>e moving into <strong>the</strong> Project area.<br />

This will ensure no noxious weeds will enter <strong>the</strong> Project area.<br />

Fire Risk<br />

Fire Risk<br />

BIO-14: All equipment will be cleaned and inspected be<strong>for</strong>e<br />

leaving <strong>the</strong> Project area to prevent <strong>the</strong> spread of existing<br />

weeds to new areas.<br />

BIO-15: All temporary staging areas shall be placed in<br />

unvegetated areas with compacted soils, and if adjacent to<br />

natural vegetation communities, shall be delineated with silt<br />

fencing. Staging areas will not be infested with noxious<br />

weeds.<br />

FIR-1: In order to minimize fire risk during <strong>the</strong> construction<br />

phase of <strong>the</strong> Project, <strong>the</strong> Fire Plan For Construction And<br />

Service Contracts 6-14-2006 (FSH 6309.32 and 6309.11)<br />

shall be implemented by <strong>the</strong> Project proponent.<br />

Land Use, Ownership, Easements, Traffic, and Road Maintenance<br />

Road<br />

Maintenance<br />

Socio-Economic and Noise Effects<br />

BIO-9, Additionally BMP’s will be employed including:<br />

BIO-13, 14, SOI-1, 2, 3, 4, and AIR-2, 5, 6, 7.<br />

Frank Springer & Associates, Inc. Page 18 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Resource Mitigation Method / Design Criteria<br />

Noise<br />

NOI-1: To reduce <strong>the</strong> effects of construction noise, <strong>the</strong><br />

applicant shall require construction contractors to limit high<br />

noise-producing activities to <strong>the</strong> least noise-sensitive times of<br />

day and week (e.g., 7:00 am to 6:00 pm), Monday through<br />

Friday<br />

NOI-2: The applicant shall require that all construction<br />

contractors equip and maintain all construction equipment<br />

with effective muffler exhaust systems no less effective than<br />

those provided on <strong>the</strong> original equipment.<br />

NOI-3: During construction, <strong>the</strong> Project Engineer shall require<br />

all construction contractors to comply with all federal, state,<br />

county and local sound control and noise-level regulations<br />

and ordinances.<br />

NOI-4: As directed by <strong>the</strong> Project Engineer, <strong>the</strong> contractor<br />

shall implement appropriate additional noise mitigation<br />

measures including, but not limited to, changing <strong>the</strong> location<br />

of stationary equipment, shutting off idling equipment,<br />

rescheduling construction activity, notifying adjacent<br />

residents in advance of construction work or installing<br />

acoustical barriers around stationary construction noise<br />

sources<br />

Soils and Hydrology<br />

Soils To reduce <strong>the</strong> possibility of erosion, <strong>the</strong> applicant shall<br />

require construction contractors to utilize <strong>the</strong> following best<br />

management practices (BMPs) to prevent discharges from<br />

entering waters of <strong>the</strong> U.S. during construction.<br />

SOI-1: Erosion control and sedimentation prevention<br />

methods shall be utilized during <strong>the</strong> construction phase of <strong>the</strong><br />

<strong>project</strong>. These will include <strong>the</strong> placement of fiber rolls, sand<br />

bags, rice mats, straw wattles, or similar measures.<br />

SOI-2: No stockpiles shall be placed within waters of <strong>the</strong> U.S.<br />

SOI-3: No vehicle maintenance shall be conducted within or<br />

adjacent to waters of <strong>the</strong> U.S.<br />

Frank Springer & Associates, Inc. Page 19 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Resource Mitigation Method / Design Criteria<br />

SOI-4: Proper use and disposal of oil, gasoline, diesel fuel,<br />

antifreeze and o<strong>the</strong>r hazardous substances shall be en<strong>for</strong>ced<br />

by <strong>the</strong> Contractor<br />

Soils and Hydrology, Continued<br />

Hydrology HYD-1: Impacts to federal/ACOE and state/CDFG drainages<br />

<strong>for</strong> culverts and <strong>road</strong> crossings are covered under <strong>the</strong><br />

Sections 404/401 of <strong>the</strong> Clean Water Act Permit Programs<br />

and <strong>the</strong> 1600 Streambed Alteration Program. In order to<br />

compensate <strong>for</strong> <strong>the</strong> loss of waters of <strong>the</strong> U.S., mitigation at a<br />

no less than 1:1 ratio within a suitable and approved<br />

mitigation bank, or mitigated in <strong>the</strong> Project area, on lands<br />

designated and approved by <strong>the</strong> ACOE and/or CDFG.<br />

The “No Action” Alternative<br />

Under <strong>the</strong> No Action alternative <strong>the</strong> RTA will take no affirmative action (<strong>the</strong>re will be<br />

no change in <strong>the</strong> current condition of <strong>the</strong> <strong>road</strong>). The “no action” alternative would<br />

avoid all new impacts. The <strong>road</strong> would remain unpaved and unimproved. No new<br />

drainage structures will be installed. Drainage of <strong>the</strong> <strong>road</strong> at <strong>the</strong> blue line stream<br />

crossing would not be improved to provide all-wea<strong>the</strong>r <strong>road</strong> access. Road use permit<br />

and <strong>road</strong> maintenance issues would remain unresolved. Unsafe <strong>road</strong> conditions<br />

would continue to persist, and emergency vehicle access to Ramona Reservation<br />

would continue to be inefficient, with response times adversely affected. Poor <strong>road</strong><br />

conditions would continue to adversely impact evacuation times of Ramona<br />

Reservation residents during emergency events such as wildfires.<br />

Frank Springer & Associates, Inc. Page 20 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Comparison of Alternatives<br />

This section compares <strong>the</strong> alternatives by summarizing key differences between <strong>the</strong><br />

alternatives in <strong>the</strong> following table. Chapter 3 describes <strong>the</strong> <strong>environmental</strong><br />

consequences of <strong>the</strong> alternatives in detail.<br />

Table 2: Comparison of Alternatives<br />

Resource Proposed Action Alternative “No Action” Alternative<br />

Wildlife<br />

RF Sensitive<br />

Animals<br />

(20 species)<br />

Federally-Listed<br />

Animal Species<br />

(1 species - Quino<br />

Checkerspot<br />

butterfly)<br />

Management<br />

Indicator Species –<br />

Animals<br />

(2 species)<br />

Botany<br />

Federally-Listed<br />

Plant Species<br />

RF Sensitive Plants<br />

(14 species)<br />

Management<br />

Indicator Species –<br />

Plants<br />

Air Quality<br />

May affect individuals, but is not<br />

likely to result in a trend toward<br />

Federal listing or loss of viability<br />

<strong>for</strong> <strong>the</strong>se species.<br />

Not likely to jeopardize <strong>the</strong><br />

continued existence of <strong>the</strong> Quino<br />

checkerspot butterfly and is not<br />

likely to adversely modify its<br />

designated critical habitat.<br />

Removal of 0.15 acre of red<br />

shank-chamise chaparral within<br />

<strong>the</strong> <strong>project</strong> area will result in a very<br />

slight but permanent habitat loss<br />

<strong>for</strong> <strong>the</strong> Quino.<br />

No direct or indirect effects to <strong>the</strong><br />

habitat factor <strong>for</strong> which each<br />

species was chosen. A move<br />

nei<strong>the</strong>r toward nor away from <strong>the</strong><br />

desired <strong>for</strong>est condition.<br />

None present N/A<br />

May affect individuals, but is not<br />

likely to result in a trend toward<br />

Federal listing or loss of viability<br />

<strong>for</strong> <strong>the</strong>se species.<br />

None present N/A<br />

Reduction of particulate matter<br />

pollution, as dust generation would<br />

be much less on a paved surface<br />

No change would be<br />

anticipated.<br />

No change would be<br />

anticipated.<br />

No change would be<br />

anticipated.<br />

No change would be<br />

anticipated.<br />

Vehicle emissions would<br />

continue at present<br />

levels and fugitive dust<br />

Frank Springer & Associates, Inc. Page 21 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Resource Proposed Action Alternative “No Action” Alternative<br />

Hydrology/Soils<br />

Heritage<br />

than on an unpaved one.<br />

Improved vehicle gas mileage and<br />

reduction in exhaust emissions.<br />

Total impacts are estimated at<br />

4,288 sf (0.098 ac.) federal/ACOE<br />

and 6,429 sf (0.148 ac.)<br />

state/CDFG jurisdictional area.<br />

It is likely that sedimentation may<br />

be reduced over <strong>the</strong> long-term and<br />

erosion and hazardous material<br />

discharge reduced or prevented.<br />

No cultural resources were<br />

identified within <strong>the</strong> Project APE,<br />

so no effects to heritage<br />

resources.<br />

Human Health and Safety<br />

The <strong>road</strong> would be more<br />

accessible in all wea<strong>the</strong>r<br />

conditions. Access <strong>for</strong> emergency<br />

vehicles and response times<br />

would be improved and<br />

evacuation times reduced. Overall<br />

safety <strong>for</strong> residents and visitors<br />

would be improved.<br />

Aes<strong>the</strong>tics<br />

Fire fighting and prevention would<br />

be improved due to improved<br />

access to <strong>the</strong> Reservation and <strong>the</strong><br />

fuel break.<br />

No significant impacts. Views from<br />

<strong>the</strong> nearest residences, <strong>the</strong><br />

Cahuilla Wilderness and o<strong>the</strong>r<br />

nearby viewpoints would not be<br />

significantly affected.<br />

Land Use, Ownership, Easements<br />

A long-term, recordable <strong>road</strong><br />

special use easement would be<br />

granted by <strong>the</strong> FS <strong>for</strong> <strong>the</strong> benefit<br />

would add to particulate<br />

pollution.<br />

Damage to <strong>road</strong><br />

structure from erosion<br />

would be expected to<br />

continue at current<br />

levels.<br />

No effects to heritage<br />

resources.<br />

Safety and access would<br />

remain <strong>the</strong> same or<br />

would deteriorate over<br />

time due to fur<strong>the</strong>r<br />

erosion damage.<br />

Fire risk would remain<br />

<strong>the</strong> same or increase as<br />

access to <strong>the</strong> area<br />

deteriorates.<br />

No change to <strong>the</strong> current<br />

visual quality of <strong>the</strong> area.<br />

Lacking an authorization<br />

<strong>for</strong> maintenance or use,<br />

<strong>the</strong> Tribe would be<br />

Frank Springer & Associates, Inc. Page 22 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Resource Proposed Action Alternative “No Action” Alternative<br />

of <strong>the</strong> Ramona Tribe.<br />

subject to inconvenience,<br />

<strong>road</strong> closures due to<br />

driving conditions or<br />

Forest Closures (fire<br />

indexes, snow, etc.).<br />

Frank Springer & Associates, Inc. Page 23 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Chapter 3 – Affected Environment and Environmental<br />

Consequences<br />

This chapter summarizes <strong>the</strong> physical, biological, social and economic environments<br />

that are affected by <strong>the</strong> proposed action and alternatives, and describes <strong>the</strong><br />

expected effects on that environment from implementing <strong>the</strong> proposed action and<br />

alternatives. This chapter also presents <strong>the</strong> scientific and analytical basis <strong>for</strong> <strong>the</strong><br />

comparison of alternatives that was outlined in Table 2: Comparison of Alternatives.<br />

The affected environment section under each resource topic describes <strong>the</strong> existing<br />

condition, or baseline, against which <strong>environmental</strong> effects were evaluated and from<br />

which progress toward <strong>the</strong> desired condition can be measured. Environmental<br />

consequences <strong>for</strong>m <strong>the</strong> scientific and analytical basis <strong>for</strong> comparison of alternatives,<br />

including <strong>the</strong> proposed action, through compliance with standards set <strong>for</strong>th in <strong>the</strong><br />

2006 San Bernardino National Forest Land Management Plan (LMP) and a<br />

summary of monitoring required by <strong>the</strong> National Environmental Policy Act of 1969<br />

(NEPA) and National Forest Management Act of 1976. The <strong>environmental</strong><br />

consequences discussion centers on direct, indirect and cumulative effects, along<br />

with applicable mitigation measures. Effects can be neutral, beneficial or adverse.<br />

These terms are defined as follows:<br />

Direct effects are caused by <strong>the</strong> action and occur at <strong>the</strong> same place and time<br />

as <strong>the</strong> action.<br />

Indirect effects are caused by <strong>the</strong> action and are later in time or fur<strong>the</strong>r<br />

removed in distance, but are still reasonably <strong>for</strong>eseeable.<br />

Cumulative effects are those that result from <strong>the</strong> incremental impact of <strong>the</strong><br />

action when added to o<strong>the</strong>r past, present and reasonably <strong>for</strong>eseeable future<br />

actions.<br />

Cumulative Effects<br />

According to <strong>the</strong> Council on Environmental Quality (CEQ) NEPA regulations,<br />

“cumulative impact” is <strong>the</strong> impact on <strong>the</strong> environment which results from <strong>the</strong><br />

incremental impact of <strong>the</strong> action when added to o<strong>the</strong>r past, present and reasonably<br />

<strong>for</strong>eseeable future actions regardless of what agency (Federal or non-Federal) or<br />

person undertakes such actions (40 CFR 1508.7).<br />

In order to understand <strong>the</strong> contribution of past actions to <strong>the</strong> cumulative effects of <strong>the</strong><br />

proposed action and alternatives, this analysis relies on current <strong>environmental</strong><br />

conditions as a proxy <strong>for</strong> <strong>the</strong> impacts of past actions. This is because existing<br />

conditions reflect <strong>the</strong> aggregate impact of all prior human actions and natural events<br />

that have affected <strong>the</strong> environment and might contribute to cumulative effects.<br />

Frank Springer & Associates, Inc. Page 24 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

This cumulative effects analysis does not attempt to quantify <strong>the</strong> effects of past<br />

human actions by adding up all prior actions on an action-by-action basis. There are<br />

several reasons <strong>for</strong> not taking this approach. First, a catalog and analysis of all past<br />

actions would be impractical to compile and unduly costly to obtain. Current<br />

conditions have been impacted by innumerable actions over <strong>the</strong> last century (and<br />

beyond) and trying to isolate <strong>the</strong> individual actions that continue to have residual<br />

impacts would be nearly impossible. Second, providing <strong>the</strong> details of past actions on<br />

an individual basis would not be useful to predict <strong>the</strong> cumulative effects of <strong>the</strong><br />

proposed action or alternatives. In fact, focusing on individual actions would be less<br />

accurate than looking at existing conditions, because <strong>the</strong>re is limited in<strong>for</strong>mation on<br />

<strong>the</strong> <strong>environmental</strong> impacts of individual past actions and one cannot reasonably<br />

identify each and every action over <strong>the</strong> last century that has contributed to current<br />

conditions. Additionally, focusing on <strong>the</strong> impacts of past human actions risks ignoring<br />

<strong>the</strong> important residual effects of past natural events that may contribute to<br />

cumulative effects just as much as human actions. By looking at current conditions,<br />

we are sure to capture all <strong>the</strong> residual effects of past human actions and natural<br />

events, regardless of which particular action or event contributed those effects.<br />

Third, public scoping <strong>for</strong> this Project did not identify any public interest or need <strong>for</strong><br />

detailed in<strong>for</strong>mation on individual past actions. Finally, <strong>the</strong> Council on Environmental<br />

Quality issued an interpretive memorandum on June 24, 2005 regarding analysis of<br />

past actions, which states, “agencies can conduct an adequate cumulative effects<br />

analysis by focusing on <strong>the</strong> current aggregate effects of past actions without delving<br />

into <strong>the</strong> historical details of individual past actions.” For <strong>the</strong>se reasons, <strong>the</strong> analysis<br />

of past actions in this section is based on current <strong>environmental</strong> conditions.<br />

Specific plans are customized regulatory documents in lieu of standard zoning that<br />

are used to plan <strong>project</strong>s and delineate land uses, infrastructure, development<br />

standards and criteria, and implementation measures. Specific plans must address<br />

consistency with <strong>the</strong> jurisdiction's General Plan, and can be used to implement <strong>the</strong><br />

General Plan within a limited area. The Ramona Reservation is located within <strong>the</strong><br />

Riverside Extended Mountain Plan (REMAP) Area. Projects and development<br />

considered when determining cumulative impacts were located within <strong>the</strong> San<br />

Bernardino National Forest (Forest), San Jacinto Ranger District (District) and <strong>the</strong><br />

Riverside Extended Mountain Area Plan (REMAP) area outlined in <strong>the</strong> Riverside<br />

County General Plan (RCGP) and Multiple Species Habitat Conservation Plan<br />

(MSHCP). These areas are illustrated below in Figure 6, Administrative Boundaries.<br />

Projects Considered When Determining Cumulative Impacts<br />

The following lists presents past, current and reasonably <strong>for</strong>eseeable future actions<br />

potentially contributing to cumulative effects.<br />

1. San Bernardino National Forest, San Jacinto Ranger District<br />

Within <strong>the</strong> District <strong>project</strong>s that are ongoing and/or will impact <strong>the</strong> District in <strong>the</strong><br />

<strong>for</strong>eseeable future include Fuel reduction Projects, Grazing allotments, Forest<br />

Recreation Use and <strong>the</strong> designation of Wilderness areas and Wild and Scenic<br />

Frank Springer & Associates, Inc. Page 25 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Rivers. Development or impacts associated with recreational use may include trails<br />

<strong>for</strong> biking, hiking and off-<strong>road</strong> vehicles, kiosk construction, camping sites and<br />

associated parking lot construction, among o<strong>the</strong>rs.<br />

Figure 6: Administrative Boundaries<br />

Fuel Reduction <strong>project</strong>s on <strong>the</strong> District include <strong>the</strong> Thomas Mountain,<br />

Rouse North and South, Garner Valley, Bonita Vista and Baldy Projects. Fuel<br />

Frank Springer & Associates, Inc. Page 26 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Reduction involves <strong>the</strong> reduction of excess fuel material from <strong>the</strong> area using<br />

hand removal, mechanical removal, b<strong>road</strong>cast burns, underburns and pile<br />

burns in stages over a period of several years. Fuel Reduction Management<br />

employing small scale burns are intended to reduce fire fuel by reducing<br />

overgrowth and opening areas in chaparral and scrub habitats. The Thomas<br />

Mountain Project supports 1,239 acres of red shank chaparral habitat within<br />

an area of approximately 9,900 acres. The o<strong>the</strong>r <strong>project</strong>s have or will impact<br />

a total of 850± acres of red shank chaparral. Even though <strong>the</strong>re are<br />

immediate impacts to chaparral habitat as a result of fuels reduction <strong>project</strong>s,<br />

<strong>the</strong> use of localized prescribed burns are believed to improve <strong>the</strong> health of<br />

habitats overall and reduce <strong>the</strong> potential <strong>for</strong> large scale wildfires. The<br />

impacts are temporary and are expected to be beneficial to <strong>the</strong> chaparral<br />

habitat. Of <strong>the</strong> 1239 acres within <strong>the</strong> Thomas Mountain Project, 193 acres of<br />

chaparral habitat lies in <strong>the</strong> area described as 29A, which includes and<br />

encompasses <strong>the</strong> proposed Hog Lake Road Improvement Project.<br />

Grazing <strong>project</strong>s on <strong>the</strong> District include <strong>the</strong> Garner, Paradise, Rouse, and<br />

Wellman Allotments. These allotments comprise an existing grazing program<br />

on <strong>the</strong> District. The Rouse Allotment comes closest to <strong>the</strong> proposed Project<br />

area and is approximately one mile from <strong>the</strong> Project area at its closest.<br />

(Grazing is not a component of <strong>the</strong> proposed Project). Most wildlife and plant<br />

habitat impacts that can occur result from overgrazing, trampling and<br />

spreading invasive species. The Environmental Assessment <strong>for</strong> <strong>the</strong> grazing<br />

allotment <strong>project</strong> indicates that <strong>the</strong> impacts to wildlife and plant habitat are not<br />

expected to increase from <strong>the</strong> levels of <strong>the</strong> existing grazing within those<br />

allotments, and have decreased over time due to reduced number of head on<br />

<strong>the</strong> land. Grazing does not specifically remove wildlife and plant habitat, but<br />

can impact habitat quality. Approximately 481 acres of suitable Quino<br />

checkerspot butterfly occurs within <strong>the</strong> grazing lots (acres of chaparral alone<br />

were not specifically documented in <strong>the</strong> draft EA, but suitable habitat <strong>for</strong> <strong>the</strong><br />

Quino in this area is most frequently chaparral based). The Grazing<br />

Allotment EA indicates that dense chaparral areas do not typically receive<br />

grazing use because of <strong>the</strong>ir density except after fire and in less sparse areas<br />

immediately adjacent to primary range or travel routes. Use of chaparral<br />

areas is expected to be very light and incidental. Grazing impacts are difficult<br />

to quantify as only minimum chaparral habitat is expected to be impacted.<br />

Recreational Use will likely increase on <strong>the</strong> San Jacinto Ranger District in a<br />

manner that corresponds with <strong>the</strong> population increase in <strong>the</strong> wider Riverside<br />

County area. Common recreational uses include: hiking, mountain biking,<br />

horseback riding, camping and picnicking. Of <strong>the</strong> numerous on-going and<br />

future <strong>for</strong>est recreation uses, <strong>the</strong> majority are centered in <strong>the</strong> Idyllwild and<br />

San Jacinto Peak area. Designated trails within <strong>the</strong> District are being<br />

maintained and created <strong>for</strong> pedestrians, bicycles, off-highway vehicles (OHV)<br />

and equestrian use with <strong>the</strong> intention of managing un-permitted use and<br />

destruction of natural habitats and creation of a smoo<strong>the</strong>r trail system.<br />

Ongoing <strong>for</strong>est management such as recreational activities, special use<br />

Frank Springer & Associates, Inc. Page 27 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

permits authorizing use or construction of facilities on <strong>the</strong> land, and fire<br />

suppression can affect area habitat, although <strong>the</strong> impact of past and future<br />

<strong>improvement</strong>s are difficult to quantify.<br />

The recently designated Cahuilla Mountain Wilderness and <strong>the</strong> South Fork<br />

San Jacinto Wilderness and recently designated Wild and Scenic River,<br />

Bautista Creek are near <strong>the</strong> Project site. Designation of <strong>the</strong>se areas will<br />

assure extensive natural open space and a variety of wildlife habitats will be<br />

preserved in <strong>the</strong> Project vicinity. A portion of <strong>the</strong> Bautista Creek comes within<br />

0.25 miles of <strong>the</strong> Project.<br />

2. Riverside County General Plan and Multiple Species Habitat Conservation Plan<br />

The Project area occurs within <strong>the</strong> REMAP area of <strong>the</strong> Riverside County General<br />

Plan (RCGP) (2003, revised 2008). The RCGP states that “The majority of REMAP<br />

lies within Rural and Open Space Foundation Components. The amount of acreage<br />

already under public ownership toge<strong>the</strong>r with <strong>the</strong> constraints imposed by natural<br />

hazards, remoteness and lack of infrastructure, preclude significant new growth in<br />

<strong>the</strong> area” (RCGP). Existing development in <strong>the</strong> area is mainly rural residential with a<br />

variety of dwellings per acre between 2 and 20 acres.<br />

The REMAP area (548,555 acres) provides <strong>for</strong> 398,815 acres of open space, 88,783<br />

acres of rural mountain development (5-10 acre per dwelling minimum), 36,703<br />

acres of Indian land and a build-out population of 76,457. The plan calls <strong>for</strong> focused<br />

community cores and scattered rural residential communities in <strong>the</strong> planning area,<br />

with a minimum of commercial, industrial and public use development (1467 acres).<br />

The land use plan <strong>for</strong> <strong>the</strong> REMAP area is based on preserving <strong>the</strong> character of <strong>the</strong><br />

community with low intensity, large lot rural residential development and maintaining<br />

an economy focused on tourist and recreational use.<br />

Conservation of habitat and species within <strong>the</strong> County is outlined in <strong>the</strong> MSHCP and<br />

it is tied directly to <strong>the</strong> RCGP. So that conservation areas can be coordinated within<br />

<strong>the</strong> County <strong>for</strong> <strong>the</strong> greatest <strong>environmental</strong> benefit and prevent loss and degradation<br />

of habitat. The MSHCP identifies a total of 434,950 acres of chaparral habitat within<br />

<strong>the</strong> MSHCP area, of which 63%, or 272,280 are proposed <strong>for</strong> conservation.<br />

Although acreages of chaparral within <strong>the</strong> REMAP area are not separately totaled,<br />

<strong>the</strong> majority of habitat in <strong>the</strong> plan area is chaparral.<br />

Development within <strong>the</strong> area in <strong>the</strong> future will likely ei<strong>the</strong>r occur in consultation with<br />

<strong>the</strong> USFWS based on <strong>the</strong> extensive Forest Service Lands or under <strong>the</strong> Riverside<br />

County MSHCP, which plans <strong>for</strong> conservation in <strong>the</strong> most sensitive habitat areas.<br />

3. Indian Lands<br />

The Ramona Reservation currently supports two homes. The Tribal office is located<br />

off-site. Future development may include additional homes, though none are<br />

currently planned, and <strong>the</strong> Ramona Reservation population is not expected to<br />

increase substantially.<br />

Frank Springer & Associates, Inc. Page 28 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

The Ramona Tribe is in <strong>the</strong> early planning stages of developing an Eco-tourist site.<br />

The current plans are conceptual, but could <strong>for</strong>eseeably be completed in <strong>the</strong> next<br />

two to five years. The Eco-tourist site would consist of eight or more individual<br />

lodges and a central conference building. Several of <strong>the</strong> lodges are already<br />

constructed, which would minimize new development. The lodges would support 2-4<br />

persons. Additional day visitors could visit <strong>the</strong> Eco-Center conference building<br />

where Tribal members will teach people Cahuilla Culture including basketry, pottery,<br />

ga<strong>the</strong>ring, health and healing, and flora and fauna. This facility would be supplied by<br />

clean energy sources, solar and wind.<br />

Typical vehicle traffic is not expected to increase, as guests will be required to park<br />

off-site on private property and access to <strong>the</strong> Center will be in a vehicle driven by<br />

employees of <strong>the</strong> Center.<br />

Hiking, biking, bird watching and o<strong>the</strong>r outdoor activities would likely be attractions.<br />

Human presence would be in small, occasional groups. Guests will be directed to<br />

stay along <strong>the</strong> existing <strong>road</strong>s and trails when participating in outdoor activities.<br />

Impacts will be reduced by in<strong>for</strong>mation and restrictions being provided to guests at<br />

<strong>the</strong> Center and by <strong>the</strong> placement of signs along <strong>the</strong> <strong>road</strong>way asking visitors to stay<br />

on <strong>the</strong> <strong>road</strong> and educating <strong>the</strong>m about <strong>the</strong> presence of sensitive and endangered<br />

species in an attempt to promote good stewardship and reduce future habitat or<br />

sensitive plant impacts. Based on <strong>the</strong> site being a center <strong>for</strong> Eco-tourism every<br />

ef<strong>for</strong>t is expected to minimize impacts to <strong>the</strong> natural environment, although<br />

recreational impacts are inherently difficult to quantify.<br />

Air Quality<br />

The purpose of <strong>the</strong> air quality analysis is to determine whe<strong>the</strong>r emissions from a<br />

proposed new or modified source of air pollution, in conjunction with emissions from<br />

existing sources, would cause or contribute to <strong>the</strong> deterioration of <strong>the</strong> air quality in<br />

<strong>the</strong> area.<br />

Direction relevant to <strong>the</strong> proposed action as it affects air resources includes <strong>the</strong><br />

following:<br />

Federal Clean Air Act<br />

Regional Haze Rule (1990 Clean Air Act Amendments) 40 CFR Part 51<br />

General Con<strong>for</strong>mity Rule (1990 Clean Air Act Amendments) (Section 176 (c)<br />

of <strong>the</strong> Clean Air Act (part 51, subpart W and part 93, subpart B))<br />

Cali<strong>for</strong>nia Clean Air Act (H&S §§ 39660 et seq.)<br />

South Coast Air Quality Management District Rules<br />

LMP Direction (Air 1 and Air 2)<br />

Frank Springer & Associates, Inc. Page 29 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

The Clean Air Act (CAA) requires <strong>the</strong> U.S. Environmental Protection Agency (EPA)<br />

to set National Ambient Air Quality Standards (NAAQS) <strong>for</strong> pollutants considered<br />

harmful to public health and <strong>the</strong> environment. NAAQS include two types of air quality<br />

standards (40 CFR 50.1(e)). Primary standards protect public health, including <strong>the</strong><br />

health of sensitive populations such as asthmatics, children, and <strong>the</strong> elderly.<br />

Secondary standards protect public welfare, including protection against decreased<br />

visibility, damage to animals, crops, vegetation, and buildings. In addition to being<br />

subject to <strong>the</strong> requirements of <strong>the</strong> CAA, air quality in Cali<strong>for</strong>nia is also governed by<br />

more stringent regulations under <strong>the</strong> Cali<strong>for</strong>nia Clean Air Act (CCAA). The CCAA,<br />

amended in 1992, requires all air districts in <strong>the</strong> State to endeavor to achieve and<br />

maintain State Ambient Air Quality Standards. The CCAA is administered statewide<br />

by <strong>the</strong> Cali<strong>for</strong>nia Air Resources Board (CARB).<br />

The State of Cali<strong>for</strong>nia has also established ambient air quality standards, known as<br />

<strong>the</strong> Cali<strong>for</strong>nia Ambient Air Quality Standard (CAAQS) These standards are<br />

generally more stringent than <strong>the</strong> corresponding federal standards and incorporate<br />

additional standards <strong>for</strong> sulfates, hydrogen sulfide, vinyl chloride and visibility<br />

reducing particles CARB regulates mobile air pollution sources (such as motor<br />

vehicles) and also oversees <strong>the</strong> functions of local air pollution control districts and air<br />

quality management districts, which in turn administer air quality activities at <strong>the</strong><br />

regional and county level The CCAA is administered by CARB at <strong>the</strong> state level and<br />

by <strong>the</strong> numerous Air Quality Management Districts at <strong>the</strong> regional level.<br />

Within <strong>the</strong> Project area, <strong>the</strong> South Coast Air Quality Management District (SCAQMD)<br />

and <strong>the</strong> Sou<strong>the</strong>rn Cali<strong>for</strong>nia Association of Governments (SCAG) have responsibility<br />

<strong>for</strong> preparing <strong>the</strong> Air Quality Management Plan (AQMP), which address federal and<br />

state Clean Air Act requirements. The AQMP details goals, policies, and programs<br />

<strong>for</strong> improving air quality and establishes thresholds <strong>for</strong> daily operation emissions.<br />

Environmental review of individual <strong>project</strong>s within <strong>the</strong> region must demonstrate that<br />

daily construction and operational emissions thresholds as established by <strong>the</strong><br />

SCAQMD would not be exceeded, nor would <strong>the</strong> number or severity of existing air<br />

quality violations.<br />

Analysis Area – Spatial and Temporal Boundaries<br />

The Project is located within <strong>the</strong> SCAQMD. Air districts are <strong>the</strong> local authority and<br />

primary agency <strong>for</strong> managing pollutant emitting activities within <strong>the</strong>ir boundaries. As<br />

illustrated in Figure 7, Air Quality Management Districts, <strong>the</strong> SCAQMD extends<br />

across Orange County, most of Los Angeles County and <strong>the</strong> western, highly<br />

urbanized portions of San Bernardino and Riverside counties.<br />

Short-term effects are based on a 1-year duration and long-term effects are based<br />

on 20 years.<br />

Frank Springer & Associates, Inc. Page 30 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Existing Condition<br />

Cali<strong>for</strong>nia is currently divided geographically into 15 air basins and 58 counties. The<br />

South Coast Air Quality Management District (SCAQMD) has jurisdiction over an<br />

area of approximately 10,743 square miles, consisting of <strong>the</strong> four-county South<br />

Coast Air Basin (Basin), and <strong>the</strong> Riverside County portions of <strong>the</strong> Salton Sea Air<br />

Basin (SSAB) and Mojave Desert Air Basin (MDAB) (SCAQMD, 2007). As illustrated<br />

in Figure 7, The Ramona Reservation and <strong>the</strong> Hog Lake Road Improvement Project<br />

site are located near <strong>the</strong> sou<strong>the</strong>astern corner of <strong>the</strong> South Coast Air Basin (SCAB).<br />

The Pacific Ocean lies to <strong>the</strong> west of <strong>the</strong> SQAWMD, and <strong>the</strong> San Gabriel, San<br />

Bernardino, and San Jacinto Mountains lie to <strong>the</strong> north and <strong>the</strong> east of <strong>the</strong><br />

SCAQMD.<br />

The SCAQMD is home to over 16.7 million people - about half <strong>the</strong> population of <strong>the</strong><br />

whole state of Cali<strong>for</strong>nia. It is <strong>the</strong> second most populated urban area in <strong>the</strong> United<br />

States and one of <strong>the</strong> smoggiest (CARB, 2006).<br />

The topography and climate of Sou<strong>the</strong>rn Cali<strong>for</strong>nia combine to make <strong>the</strong> SCAB an<br />

area of high air pollution potential. With very light average wind speeds, <strong>the</strong> SCAB<br />

atmosphere has a limited capability to disperse air contaminants horizontally. The<br />

dominant daily wind pattern is a daytime sea breeze (onshore breeze) and a<br />

nighttime land breeze (offshore breeze), broken only occasionally by winter storms<br />

and infrequent strong Santa Ana winds from <strong>the</strong> Great Basin, Mojave, and deserts to<br />

<strong>the</strong> north.<br />

Within <strong>the</strong> SCAQMD, a majority of <strong>the</strong> pollution is derived from <strong>the</strong> nearby urban<br />

areas. The largest source of carbon monoxide (CO), nitrogen oxides (NOx) and<br />

reactive organics gases (ROG) in <strong>the</strong> SCAB are on-<strong>road</strong> motor vehicles (CARB,<br />

2005). Major sources of particulates (PM10 and PM2.5) include miscellaneous<br />

processes that include activities such as construction, dust from paved and unpaved<br />

<strong>road</strong>s, fugitive dust, automobiles, waste burning, fuel combustion, cooking, industrial<br />

processes and agricultural activities. Pollutant transport from <strong>the</strong> SCAB impacts <strong>the</strong><br />

Antelope Valley, Mojave Desert, Ventura county, and San Diego county. SCAQMD<br />

data indicates that mobile sources represent 64 percent of VOC emissions, 92<br />

percent of NOx emissions, and 98 percent of CO emissions. For directly emitted<br />

PM2.5, mobile sources represent 39 percent of <strong>the</strong> emissions with ano<strong>the</strong>r 20 percent<br />

due to vehicle-related entrained <strong>road</strong> dust.<br />

EPA has established NAAQS <strong>for</strong> six principal pollutants, which are called “criteria<br />

pollutants”: ozone (O3), carbon monoxide (CO), nitrogen dioxide (NO2), particulate<br />

matter (PM), particulate matter 10 microns or less (PM10), particulate matter 2.5<br />

microns or less (PM2.5), sulfur dioxide (SO2) and lead (Pb). For some of <strong>the</strong>se<br />

pollutants, notably O3 and PM10, <strong>the</strong> State standards are more stringent than <strong>the</strong><br />

Federal standards. The State has also established ambient air quality standards <strong>for</strong><br />

sulfates, hydrogen sulfide, vinyl chloride and visibility reducing particles. The<br />

abovementioned pollutants are generally known as “criteria pollutants.”<br />

Frank Springer & Associates, Inc. Page 31 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

The Cali<strong>for</strong>nia Air Resource Board (CARB) is required to designate areas of <strong>the</strong><br />

State as: attainment, non-attainment, or unclassified <strong>for</strong> any State standard. An<br />

“attainment” designation <strong>for</strong> an area signifies that pollutant concentrations did not<br />

violate <strong>the</strong> standard <strong>for</strong> that pollutant in that area. A “non-attainment” designation<br />

indicates that a pollutant concentration violated <strong>the</strong> standard at least once, excluding<br />

those occasions when a violation was caused by an exceptional event, as defined in<br />

<strong>the</strong> criteria. An “unclassified” designation signifies that data do not support ei<strong>the</strong>r an<br />

attainment or non-attainment status.<br />

According to CARB 2009 Area Designations <strong>for</strong> State Ambient Air Quality<br />

Standards, <strong>the</strong> Project area is located in a non-attainment area <strong>for</strong> several State<br />

ambient air quality standards <strong>for</strong> criteria air pollutants including ozone, particulate<br />

matter, and nitrogen dioxide (NO2).<br />

The U.S. Environmental Protection Agency (U.S. EPA) has similarly classified air<br />

basins or counties based on whe<strong>the</strong>r those areas have met Federal Ambient Air<br />

Quality Standards <strong>for</strong> air pollutants including ozone (O3 – 1 hour and 8 hour<br />

standards), carbon monoxide (CO), fine particulate matter (PM10), nitrogen dioxide<br />

(NO2), lead (Pb), and sulfur dioxide (SO2).<br />

According to US EPA 2010 Area Designations <strong>for</strong> National Ambient Air Quality<br />

Standards, <strong>the</strong> Project area is located in a non-attainment area <strong>for</strong> Federal ambient<br />

air quality standards <strong>for</strong> ozone and particulate matter, and is designated as being in a<br />

“maintenance area” <strong>for</strong> nitrogen dioxide.<br />

Hog Lake Road is an existing residential <strong>road</strong> serving Ramona Reservation<br />

residents and Forest Service personnel who use <strong>the</strong> <strong>road</strong> to access National Forest<br />

System lands. The <strong>road</strong> terminates in a cul-de-sac on <strong>the</strong> Ramona Reservation;<br />

<strong>the</strong>re<strong>for</strong>e, once paved <strong>the</strong> <strong>road</strong> will not provide <strong>the</strong> public through access to any<br />

o<strong>the</strong>r destination. The Ramona Reservation currently supports two homes. Tribal<br />

offices are located offsite. Future development may include additional homes,<br />

though none are currently planned and <strong>the</strong> Ramona Reservation population is not<br />

expected to increase substantially. There<strong>for</strong>e, <strong>the</strong> number of vehicles using <strong>the</strong> <strong>road</strong>,<br />

and <strong>the</strong> number of trips per day per person are not expected to increase<br />

substantially due to <strong>the</strong> <strong>improvement</strong>s being made to <strong>the</strong> <strong>road</strong>.<br />

The Ramona Tribe is in <strong>the</strong> early planning stages of developing an Eco-tourist site.<br />

The current plans are conceptual, but could potentially be completed in <strong>the</strong> next two<br />

to five years. The Eco-tourist site would consist of eight or more individual lodges<br />

and a central conference building. Several of <strong>the</strong> lodges are already constructed,<br />

which would minimize new development. The lodges would support 2-4 persons.<br />

Additional day visitors could visit <strong>the</strong> Eco-Center conference building where Tribal<br />

members will teach people Cahuilla Culture including basketry, pottery, ga<strong>the</strong>ring,<br />

health and healing, and flora and fauna. This facility would be supplied by clean<br />

energy sources, solar and wind.<br />

Frank Springer & Associates, Inc. Page 32 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Figure 7: Air Quality Management Districts<br />

Frank Springer & Associates, Inc. Page 33 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Typical vehicle traffic in <strong>the</strong> future is not expected to increase due to this future<br />

business endeavor of <strong>the</strong> Ramona Tribe, as guests will be required to park offsite<br />

on private property and access to <strong>the</strong> Center will be by electric golf-cart, or<br />

similar vehicle, driven by employees of <strong>the</strong> Center.<br />

Pollutants and Effects<br />

Ozone: The most persistent air quality problem in <strong>the</strong> SCAB is high ozone (O3)<br />

concentrations. SCAB is located in an “extreme” non-attainment area <strong>for</strong> O3. O3 is <strong>the</strong><br />

principal component of smog and is <strong>for</strong>med in <strong>the</strong> atmosphere through a complex<br />

series of photochemical reactions involving reactive organic compounds (ROC) and<br />

nitrogen oxides (NOx), which are commonly referred to as precursors of O3 and are<br />

both considered critical in O3 <strong>for</strong>mation. Motor vehicles are <strong>the</strong> major source of O3<br />

precursors in <strong>the</strong> air basin. During late spring, summer, and early fall, light winds,<br />

low mixing heights, and abundant sunshine combine to produce conditions favorable<br />

<strong>for</strong> maximum production of O3. The SCAB is designated as being in non-attainment<br />

with both <strong>the</strong> federal and State ozone standards.<br />

Carbon Monoxide: CO, a colorless gas, interferes with <strong>the</strong> transfer of oxygen to <strong>the</strong><br />

brain. CO is emitted almost exclusively from <strong>the</strong> incomplete combustion of fossil<br />

fuels. Along with carbon dioxide (CO2), CO is emitted by motor vehicles, power<br />

plants, refineries, industrial boilers, ships, aircraft, and trains. Automobile exhausts<br />

release most of <strong>the</strong> CO in urban areas, CO concentrations, are influenced by local<br />

meteorological conditions, primarily wind speed, topography, and atmospheric<br />

stability. The SCAB is designated as being in attainment with both <strong>the</strong> federal and<br />

State carbon monoxide standards.<br />

Nitrogen Dioxide: NO2 is a brownish gas that irritates <strong>the</strong> lungs. It can cause<br />

breathing difficulties at high concentrations. Like ozone, NO2 is not directly emitted,<br />

but is <strong>for</strong>med by a reaction between nitric oxide (NO) and atmospheric oxygen.<br />

NO and NO2 are collectively referred to as nitrogen oxides (N0x) and are major<br />

contributors to ozone <strong>for</strong>mation. NO2 also contributes to <strong>the</strong> <strong>for</strong>mation of PM10 (small<br />

liquid and solid particles that are less than ten microns in diameter). The SCAB has<br />

not exceeded ei<strong>the</strong>r federal or state standards <strong>for</strong> nitrogen dioxides in <strong>the</strong> past five<br />

years. It is designated as a maintenance area (an area that was once classified as<br />

non-attainment but has recently shown achievement of air quality standards) under<br />

federal standards and as an attainment area under state standards.<br />

Particulate Matter: Fine particulate matter (PM2.5) and coarse particulate<br />

matter (PM10) include dust, dirt, soot, smoke and liquid droplets directly emitted into<br />

<strong>the</strong> air by sources such as factories, power plants, cars, construction activity, fires<br />

and natural windblown dust. Particles <strong>for</strong>med in <strong>the</strong> atmosphere by condensation or<br />

<strong>the</strong> trans<strong>for</strong>mation of emitted gases such as SO2 and VOCs are also considered<br />

particulate matter.<br />

Frank Springer & Associates, Inc. Page 34 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Coarse particles (larger than 2.5 but smaller than 10 micrometers, or PM10) come<br />

from a variety of sources, including windblown dust and grinding operations. Fine<br />

particles (less than 2.5 micrometers, or PM2.5) often come from fuel combustion,<br />

power plants and diesel buses and trucks. Fine particles can also be <strong>for</strong>med in <strong>the</strong><br />

atmosphere through chemical reactions. The SCAB is designated as a nonattainment<br />

area <strong>for</strong> both state and federal PM10.<br />

Sulfur Dioxide: SO2 is a colorless, pungent gas <strong>for</strong>med primarily by <strong>the</strong> combustion<br />

of sulfur-containing fossil fuels. SO2 irritates <strong>the</strong> respiratory tract, injures lung tissue<br />

when combined with fine particulate matter and reduces visibility and <strong>the</strong> level of<br />

sunlight. The SCAB is designated as an attainment area <strong>for</strong> both federal and state<br />

sulfur dioxide standards.<br />

Lead: Pb is a gray-white metal that is soft, malleable, and resistant to corrosion.<br />

Sources of lead resulting in concentrations in <strong>the</strong> air include industrial sources<br />

and wea<strong>the</strong>ring of soils, followed by fugitive dust emissions. The SCAB is<br />

designated as an attainment area <strong>for</strong> both federal and state lead standards.<br />

Direct and Indirect Effects<br />

For purposes of meeting Federal requirements, impact significance is related to<br />

Federal con<strong>for</strong>mity with <strong>the</strong> U.S. EPA-approved State Implementation Plan (SIP) and<br />

with <strong>the</strong> national ambient air quality standards (NAAQS). Air quality impacts would<br />

be considered significant if <strong>the</strong>y are expected to cause or contribute to an air quality<br />

violation in a non-attainment or maintenance area. However, if total direct and<br />

indirect <strong>project</strong> emissions fall below designated Applicability threshold levels<br />

established under <strong>the</strong> Con<strong>for</strong>mity Rule, no adverse change in attainment status is<br />

expected. For purposes of meeting State requirements, Air Quality Management<br />

District (AQMD) thresholds of significance <strong>for</strong> <strong>project</strong> emissions serve <strong>the</strong> same<br />

purpose as <strong>the</strong> Federal applicability thresholds.<br />

No Action:<br />

The No Action alternative includes <strong>the</strong> continuing operation of Hog Lake Road<br />

without <strong>the</strong> implementation of any <strong>road</strong> <strong>improvement</strong>s. This would cause no new<br />

adverse impacts to air quality, however <strong>the</strong>re would continue to be impacts from<br />

vehicle emissions (ozone, carbon monoxide, nitrogen dioxide, and sulfur dioxide),<br />

and <strong>the</strong> fugitive dust produced from driving on <strong>the</strong> unpaved surface would add to<br />

particulate pollution (PM2.5 and PM10).<br />

Proposed Action:<br />

The implementation of <strong>the</strong> Proposed Action is not expected to have any long-term<br />

detrimental effect on air quality. Long term, <strong>the</strong> paving of <strong>the</strong> <strong>road</strong> is expected to<br />

actually reduce particulate matter pollution, as dust generation by vehicles would be<br />

much less on a paved surface than on an unpaved one. Additionally, paving <strong>the</strong> <strong>road</strong><br />

will result in less friction, which will improve vehicle gas mileage and reduce exhaust<br />

emissions, due to improved engine efficiency. Traffic volumes are not <strong>for</strong>ecast to<br />

increase significantly with implementation of <strong>the</strong> proposed <strong>project</strong> and traffic<br />

Frank Springer & Associates, Inc. Page 35 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

congestion is <strong>for</strong>ecast to remain <strong>the</strong> same or improve at all intersections affected by<br />

<strong>the</strong> proposed <strong>project</strong><br />

Short-term and temporary air quality impacts would result from construction related<br />

activities and would include fugitive dust and exhaust emissions from construction<br />

equipment. The primary impact would be due to dust generated by constructionrelated<br />

vehicles and equipment during <strong>the</strong> paving process. Fugitive dust could be<br />

emitted as a result of wind erosion of exposed earth surfaces. Organic gas<br />

emissions would occur from construction vehicle exhaust. Because <strong>the</strong> proposed<br />

newly paved <strong>road</strong> would be built on an already existing unpaved <strong>road</strong>, grading<br />

activities would be minimal. Excavation and earthmoving are also anticipated to be<br />

minimal. Construction would be a relatively short duration and air-pollutant emissions<br />

would be dispersed relatively quickly. It is very unlikely that air quality standards<br />

would be approached or exceeded given <strong>the</strong> small size and short duration of <strong>the</strong><br />

construction Project.<br />

With <strong>the</strong> linear nature of <strong>the</strong> Project any increase in emissions and/or fugitive dust<br />

would be continually progressing along <strong>the</strong> Project area, which would limit <strong>the</strong> time<br />

any one area would be exposed.<br />

This Project would be consistent with <strong>the</strong> federally approved State Implementation<br />

Plan (SIP) <strong>for</strong> <strong>the</strong> San Diego Air Pollution Control District’s Air Quality Management<br />

Plan.<br />

Cumulative Effects<br />

The No Action Alternative, along with past, present and reasonably <strong>for</strong>eseeable<br />

actions, would result in a lower overall air quality <strong>for</strong> <strong>the</strong> region compared to what <strong>the</strong><br />

overall air quality of <strong>the</strong> region would be with <strong>the</strong> proposed <strong>project</strong> implemented.<br />

The Proposed Action would not be expected to lead to a significant increase of<br />

population on <strong>the</strong> Ramona Reservation nor result in larger visitor traffic volumes that<br />

would generate larger amounts of air pollutants because Hog Lake Road is a short,<br />

residential <strong>road</strong> primarily servicing <strong>the</strong> existing residences on <strong>the</strong> Ramona<br />

Reservation. Implementing <strong>the</strong> <strong>project</strong> would result in <strong>the</strong> users of Hog Lake Road<br />

contributing less particulate matter and vehicle emission pollution to <strong>the</strong> area.<br />

Conclusions<br />

With mitigation measures / design criteria implemented, <strong>the</strong> Project demonstrates<br />

con<strong>for</strong>mity with <strong>the</strong> State Implementation Plan under <strong>the</strong> Federal Clean Air Act<br />

(CAA) and does not exceed <strong>the</strong> SCAQMD daily Project emissions significance<br />

thresholds <strong>for</strong> ei<strong>the</strong>r <strong>the</strong> Proposed Action or <strong>the</strong> No Action alternatives. No adverse<br />

change in attainment status is expected to occur as a result of this Project.<br />

Frank Springer & Associates, Inc. Page 36 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Aes<strong>the</strong>tics / Visual Resources<br />

Analysis Framework: Statute, Regulation, Forest Plan and Laws<br />

This section evaluates potential impacts to <strong>the</strong> aes<strong>the</strong>tic character and visual<br />

resources as a result of implementation of <strong>the</strong> Proposed Action or No Action<br />

alternatives.<br />

Direction relevant to <strong>the</strong> proposed action as it affects visual resources includes:<br />

National Forest Management Act (NFMA) The National Forest Management Act<br />

(NFMA) and its implementing regulations, required <strong>the</strong> inventory and evaluation of<br />

<strong>the</strong> <strong>for</strong>est’s visual resource, addressing <strong>the</strong> landscape’s visual attractiveness and <strong>the</strong><br />

public’s visual expectations. Management prescriptions <strong>for</strong> definitive lands areas of<br />

<strong>the</strong> <strong>for</strong>est are to include Scenic Integrity Objectives (SIOs).<br />

Wilderness Areas and Wild and Scenic Rivers Two wilderness areas are within<br />

two miles of <strong>the</strong> Project site, <strong>the</strong> Cahuilla Mountain Wilderness and <strong>the</strong> South Fork of<br />

<strong>the</strong> San Jacinto Wilderness. These areas were designated to assure extensive<br />

natural open space and a variety of wildlife habitats will be preserved. The South<br />

Fork San Jacinto area is <strong>the</strong> closest in proximity, located approximately 1.1 miles to<br />

<strong>the</strong> northwest, and it supports similar habitat type to <strong>the</strong> proposed Project area.<br />

Bautista Creek has been designated a Wild and Scenic River. The portion of <strong>the</strong><br />

Creek that is designated comes within 0.25 miles of <strong>the</strong> Project site and would<br />

provide both habitat and a wildlife corridor through <strong>the</strong> area. Impacts around <strong>the</strong><br />

Creek would be restricted and subject to more critical examination.<br />

San Bernardino National Forest Land Management Plan The LMP contains<br />

Forest-wide management direction in <strong>the</strong> <strong>for</strong>m of Scenic Integrity Objectives <strong>for</strong><br />

visual resources and identification of “Key Places” <strong>for</strong> visual management emphasis.<br />

Part 2 and 3 of <strong>the</strong> LMP outlines <strong>the</strong> following landscape aes<strong>the</strong>tics and character<br />

management objectives and standards:<br />

Manage landscapes and built elements to achieve scenic integrity objectives using<br />

best <strong>environmental</strong> design practices to harmonize changes in <strong>the</strong> landscape and<br />

advance <strong>environmental</strong>ly sustainable design solutions. Design management<br />

activities to meet <strong>the</strong> scenic integrity objectives (SIO) <strong>for</strong> <strong>the</strong> Anza “Place” which is<br />

“High”.<br />

Affected Environment<br />

The Project area is located in a rural setting. Visual resources in <strong>the</strong> area include<br />

mountains and topography, rock outcrops, trees and vegetation, as well as<br />

panoramic views of Anza Valley.<br />

Frank Springer & Associates, Inc. Page 37 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Direct, Indirect, and Cumulative Effects<br />

No Action:<br />

The No Action Alternative would result in no changes to <strong>the</strong> current visual quality of<br />

<strong>the</strong> Project area, and would have no direct, indirect or cumulative effect on visual<br />

resources, wilderness areas or view points.<br />

Proposed Action:<br />

The Proposed Action alternative is not expected to significantly alter <strong>the</strong> visual<br />

quality of <strong>the</strong> landscape as <strong>the</strong> <strong>road</strong> already exists and is in use as an unpaved<br />

access <strong>road</strong>. Views from <strong>the</strong> nearest residences, <strong>the</strong> Cahuilla Wilderness and o<strong>the</strong>r<br />

nearby viewpoints would not be significantly affected. The Proposed Action is<br />

<strong>the</strong>re<strong>for</strong>e anticipated to have a less than significant effect on visual resources.<br />

Biological Resources<br />

Species accounts are incorporated by reference from <strong>the</strong> San Bernardino National<br />

Forest Land Management Plan (USDA 2006). Detailed species accounts are<br />

available on-line at: http://www/fs.fed.us/r5/scfpr/Projects/lmp/read.htm. For<br />

more detailed in<strong>for</strong>mation, including plant and animal species lists and applied<br />

methodology, please reference <strong>the</strong> Biological Evaluation/Assessment <strong>for</strong> Plants and<br />

Animals, Botany and Wildlife Report, Management Indicator Species Report, and<br />

Weed Risk Assessment <strong>for</strong> <strong>the</strong> Ramona Indian Reservation Access Road<br />

Improvement Project (<strong>the</strong> BE/BA) (L & L Environmental, Inc. 2009) which is part of<br />

<strong>the</strong> Project record and available upon request.<br />

Affected Environment<br />

Vegetation and Habitat<br />

The Proposed Action would take place entirely within an existing, regularly graded<br />

and cleared dirt <strong>road</strong>, with <strong>the</strong> exception of 6500 square feet (sf) (0.15 acres.) (<strong>the</strong><br />

boxed culvert area).<br />

In general, flora in <strong>the</strong> area of <strong>the</strong> Proposed Action consists of species that occur in<br />

red shank-chamise chaparral, Cali<strong>for</strong>nia buckwheat scrub, Interior live oak scrub<br />

communities, and dry washes. The Project impact area consists of an unvegetated,<br />

graded dirt <strong>road</strong> and 0.15 acres of red shank-chamise chaparral (<strong>the</strong> boxed culvert<br />

area). The Project area is surrounded by vast, open and relatively undisturbed<br />

habitat <strong>for</strong> <strong>the</strong>se species.<br />

Frank Springer & Associates, Inc. Page 38 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Red Shank-Chamise Chaparral<br />

Red shank-chamise chaparral is <strong>the</strong> dominant vegetation community in <strong>the</strong> proposed<br />

Project area. Red shank-chamise chaparral is a vegetation community dominated<br />

by red shank (Adenostoma sparsifolium) and chamise (Adenostoma fasciculatum).<br />

This chaparral is similar to chamise chaparral, but is typically taller (2-4 meters) and<br />

somewhat more open. It often grows in pure stands of redshank. Red shank<br />

chaparral is usually confined to granitic soils, often at higher elevations than chamise<br />

chaparral, and with greater precipitation and colder winters (Holland 1986).<br />

Dominant species observed within <strong>the</strong> proposed Project area include red shank,<br />

chamise, Cali<strong>for</strong>nia buckwheat (Eriogonum fasciculatum), and big sagebrush<br />

(Artemisia tridentate). The red shank-chamise chaparral onsite is relatively open<br />

with diverse shrub and herb layers. The herbaceous layer included several host<br />

plants <strong>for</strong> <strong>the</strong> Quino checkerspot butterfly (Euphydryas editha quino), including white<br />

snapdragon (Antirrhinum coulterianum) and purple owl’s clover (Castilleja exserta).<br />

Cali<strong>for</strong>nia Buckwheat Scrub<br />

Cali<strong>for</strong>nia buckwheat scrub is a vegetation community dominated by Cali<strong>for</strong>nia<br />

buckwheat. The buckwheat scrub within <strong>the</strong> proposed Project area is heavily<br />

disturbed and contains large areas of open ground. Dominant plants included<br />

matchweed (Gutierrezia cali<strong>for</strong>nica) and Cali<strong>for</strong>nia buckwheat.<br />

Interior Live Oak Scrub<br />

Interior live oak scrub is a vegetation community typically found on north-facing<br />

slopes and shaded ravines. This vegetation community is located along <strong>the</strong><br />

easternmost portion of <strong>the</strong> proposed Project area. The species observed within <strong>the</strong><br />

area included scattered interior live oak (Quercus wislizenii var. frutescens) with a<br />

scrub habitat understory.<br />

Figure 8: Vegetation Communities<br />

L & L Environmental, Inc. 2009<br />

Frank Springer & Associates, Inc. Page 39 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Wildlife<br />

Fauna in <strong>the</strong> proposed Project area consists of species that utilize red shankchamise<br />

chaparral, Cali<strong>for</strong>nia buckwheat scrub, Interior live oak scrub, and dry<br />

washes and may include species that utilize sparse individual trees in open habitat<br />

<strong>for</strong> nesting, roosting or perching. The Project impact area consists of an<br />

unvegetated, graded dirt <strong>road</strong> and 0.15 acres of red shank-chamise chaparral. The<br />

Project area is surrounded by vast, open and relatively undisturbed habitat <strong>for</strong> <strong>the</strong>se<br />

species.<br />

A complete list of plant and animal species observed during surveys and expected to<br />

occur in <strong>the</strong> Project area can be found in <strong>the</strong> BE/BA (L & L Environmental, Inc.<br />

2009).<br />

Threatened, Endangered, Proposed and Candidate (TEPC)<br />

Species<br />

Species currently listed as Threatened, Endangered, Candidate, Proposed,<br />

Sensitive, and Watch-list species and that have <strong>the</strong> potential to occur in <strong>the</strong> sou<strong>the</strong>rn<br />

San Jacinto Mountain area were considered in <strong>the</strong> BE/BA (L & L Environmental, Inc.<br />

2009), which is part of <strong>the</strong> Project record and available upon request.<br />

Federally listed plants:<br />

Three TEPC plant species were identified as having <strong>the</strong> potential to occur in <strong>the</strong><br />

Project area:<br />

Slender-horned spineflower (Docecahema leptoceras)<br />

San Bernardino bluegrass (Poa atropurpurea)<br />

Cali<strong>for</strong>nia dandelion (Taraxacum cali<strong>for</strong>nicum)<br />

No occurrences of TEPC plants were identified in <strong>the</strong> record <strong>for</strong> <strong>the</strong> area. No<br />

designated or proposed critical habitat and no suitable habitat <strong>for</strong> <strong>the</strong>se species<br />

occur within <strong>the</strong> proposed Project area.<br />

Federally listed animals:<br />

The Project area contains suitable and occupied habitat <strong>for</strong> <strong>the</strong> Quino checkerspot<br />

butterfly (Euphydryas editha quino). The Project area contains designated Critical<br />

Habitat <strong>for</strong> <strong>the</strong> Quino Checkerspot butterfly (Quino).<br />

Surveys <strong>for</strong> Quino were conducted in <strong>the</strong> area in 2002, 2005 and 2008. Quino were<br />

observed in relatively high numbers adjacent to <strong>the</strong> proposed Project in 2005<br />

(Mooney, Jones and Stokes, 2005).<br />

Frank Springer & Associates, Inc. Page 40 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

The Quino is a medium-sized butterfly of <strong>the</strong> brush-footed butterfly family. Preferred<br />

habitats consist of open spaces within coastal sage scrub, chaparral, and sparse<br />

native woodlands. Quino has a 4-6 week flight period from late January-early March<br />

and continuing as late as early May, depending on wea<strong>the</strong>r conditions.<br />

In 2008 <strong>the</strong> USFWS proposed an updated and revised critical habitat area, from that<br />

originally designated, based on <strong>the</strong> most recent occupation data <strong>for</strong> Quino. The<br />

revised critical habitat does alter critical habitat in <strong>the</strong> San Jacinto and Cahuilla area<br />

and now includes <strong>the</strong> central portion of <strong>the</strong> Project area. Consultation with <strong>the</strong><br />

USFWS is required <strong>for</strong> <strong>project</strong>s that fall within designated critical habitat.<br />

The U.S. Fish and Wildlife Service Biological Opinion, dated June 9 th , 2010,<br />

concluded that <strong>the</strong> “proposed action is not likely to jeopardize <strong>the</strong> continued<br />

existence of <strong>the</strong> Quino checkerspot butterfly and is not likely to adversely modify its<br />

designated critical habitat” based on <strong>the</strong> following reasons:<br />

1. The <strong>project</strong> affects a small amount of <strong>the</strong> overall range of <strong>the</strong> species.<br />

2. Impact minimization measures: habitat replacement, implementation outside <strong>the</strong><br />

butterfly’s breeding and plant seeding season, numerous BMP’s, bio monitoring<br />

of construction and <strong>the</strong> speed limit of 25 mph.<br />

3. Only a small portion of <strong>the</strong> Bautista Unit of Quino Designated Critical Habitat will<br />

be subject to potential impacts and <strong>the</strong>se impacts will be effectively minimized.<br />

4. The expected use of <strong>the</strong> <strong>road</strong> is low as it is only <strong>for</strong> Reservation access.<br />

USFWS anticipates <strong>the</strong> level of incidental take will not exceed 0.15 acres and this<br />

level of take will not result in jeopardy to <strong>the</strong> Quino Checkerspot butterfly. No<br />

additional reasonable or prudent measures were identified beyond those outlined in<br />

<strong>the</strong> Design Criteria (Table 1) that would minimize incidental take.<br />

Determination<br />

Botanical<br />

Based on <strong>the</strong> lack of habitat, lack of designated or proposed critical habitat and lack<br />

of species occurrence within <strong>the</strong> Project area, <strong>the</strong> Proposed Action would not affect<br />

endangered or threatened botanical species, or designated critical plant habitat.<br />

Wildlife<br />

The BE/BA (L & L Environmental, Inc. 2009), determined that <strong>the</strong> Proposed Action<br />

may affect and is likely to adversely affect <strong>the</strong> Quino Checkerspot butterfly.<br />

According to <strong>the</strong> results of <strong>the</strong> Section 7 Consultation process conducted between<br />

<strong>the</strong> BIA and US Fish & Wildlife Service <strong>the</strong> Proposed Action is not likely to<br />

jeopardize <strong>the</strong> continued existence of <strong>the</strong> Quino checkerspot butterfly and is not<br />

Frank Springer & Associates, Inc. Page 41 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

likely to adversely modify its designated critical habitat. A copy of <strong>the</strong> USFWS<br />

Biological Opinion dated June 9 th 2010 is available in <strong>the</strong> Project record.<br />

Direct and Indirect Effects<br />

No Action:<br />

For <strong>the</strong> No Action alternative, it is expected that all direct and indirect impacts on all<br />

botanical and wildlife TEPC species and habitat would remain unchanged compared<br />

to current levels.<br />

Proposed Action:<br />

For <strong>the</strong> Proposed Action alternative, <strong>the</strong> following direct and indirect effects could be<br />

anticipated:<br />

Botanical Resources<br />

Based on <strong>the</strong> lack of habitat, no designated or proposed critical habitat in <strong>the</strong> area<br />

and no documented occurrences of <strong>the</strong> species, including <strong>the</strong> previous 2005<br />

botanical report, no impacts are expected to TEPC botanical species as a result of<br />

this Project.<br />

Wildlife Resources<br />

The proposed Project may affect Quino checkerspot butterfly (Quino) and will affect<br />

designated critical habitat during construction. The US Fish and Wildlife service<br />

Biological Opinion (BO), dated June 9, 2010, determined <strong>the</strong> following potential<br />

effects and indicated that <strong>project</strong> design criteria would sufficiently prevent or<br />

minimize <strong>the</strong>m.<br />

Direct Effects<br />

1. The proposed <strong>road</strong> <strong>improvement</strong> construction activities could result in mortality of<br />

Quino by crushing larvae. These direct effects to larvae could occur over <strong>the</strong> 0.15<br />

acres (0.06 hectares) of habitat subject to removal. Additionally, host and nectar<br />

plants may be permanently removed.<br />

Design Criteria: Project activities will not occur between February 1 and July 31,<br />

<strong>the</strong>re<strong>for</strong>e no direct effects are expected to adults, pupae, eggs or host/nectar plants<br />

(see Table 1: Mitigation Measures/Design Criteria; Biological Resources, Bio 2). In<br />

<strong>the</strong> Biological Opinion, <strong>the</strong> USFWS determined that <strong>the</strong> level of anticipated take is<br />

not likely to result in jeopardy to <strong>the</strong> Quino.<br />

2. The proposed Project will remove 0.15 acres (0.06 hectares) of <strong>the</strong> 13,880 acre<br />

(5,618 hectare) Bautista Unit of Quino Designated Critical Habitat. Effects will occur<br />

to primary constituent element 1 (open areas with host plants). This effect should be<br />

minimal since <strong>the</strong> area of removal is small compared to <strong>the</strong> size of <strong>the</strong> unit.<br />

Frank Springer & Associates, Inc. Page 42 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Design Criteria: Habitat replacement of 0.15 acres (0.06 hectares) of Quino habitat<br />

(see Table 1: Mitigation Measures/Design Criteria; Biological Resources, Bio1).<br />

3. Increased vehicle speeds may lead to additional mortality to butterflies due to<br />

vehicle strikes. Potential increase in vehicle speed may enhance <strong>the</strong> <strong>road</strong> as a<br />

barrier to Quino movement due to turbulence. Since <strong>the</strong> proposed Project nearly<br />

bisects <strong>the</strong> Bautista Unit of critical habitat, <strong>the</strong> movement of Quino could be affected<br />

within this Unit.<br />

Design Criteria: Road use is expected to be low since <strong>the</strong> <strong>road</strong> only provides access<br />

to and from <strong>the</strong> Ramona Indian Reservation, which only includes two homes and<br />

several lodges. Road use is not expected to increase due to paving. The effects of<br />

potential increased vehicle speeds should be minimized by a reduced and posted<br />

speed limit of 25 mph and educational material provided to regular <strong>road</strong> users (see<br />

Table 1: Mitigation Measures/Design Criteria; Biological Resources, Bio 7 and 8).<br />

Indirect Effects<br />

1. Grading of <strong>the</strong> <strong>road</strong> may increase dust in <strong>the</strong> area during implementation, which<br />

has <strong>the</strong> potential to negatively affect Quino host and nectar plants.<br />

Design Criteria: Implementation of standard BMPs will reduce fugitive dust, i.e<br />

watering <strong>the</strong> <strong>road</strong> and loose soil areas (see Table 1: Mitigation Measures/Design<br />

Criteria; Biological Resources, Bio 3).<br />

2. There could be potential <strong>for</strong> <strong>the</strong> introduction of non-native seeds during<br />

construction that may affect Quino host plants.<br />

Design Criteria: Standard BMPs, i.e washing equipment (see Table 1: Mitigation<br />

Measures/Design Criteria; Biological Resources, Bio 13 and 15).<br />

3. Completion of <strong>the</strong> <strong>project</strong>, i.e. covering <strong>the</strong> existing dirt with pavement, will likely<br />

reduce <strong>the</strong> dust associated with current (unpaved) use, which would be a benefit to<br />

Quino habitat adjacent to <strong>the</strong> <strong>road</strong> by improving host and nectar plant condition.<br />

Cumulative Effects<br />

No Action:<br />

For <strong>the</strong> No Action alternative, it is expected that cumulative impacts on TEPC<br />

species and habitat would remain unchanged.<br />

Proposed Action:<br />

Any Quino habitat loss caused by <strong>the</strong> Proposed Action would add to <strong>the</strong> habitat loss<br />

that has already occurred in <strong>the</strong> area.<br />

Recent fuel reduction <strong>project</strong>s on Forest Service land in <strong>the</strong> area have resulted in <strong>the</strong><br />

temporary decrease of 2088 acres of red shank-chaparral habitat through burning,<br />

which would have impacted <strong>the</strong> Quino in <strong>the</strong> short-term. However, fuel reduction<br />

Frank Springer & Associates, Inc. Page 43 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

<strong>project</strong>s typically improve habitat <strong>for</strong> <strong>the</strong> species over <strong>the</strong> long-term. Mitigation<br />

measures / design criteria were employed during that Project to avoid any<br />

substantial effects on host plant populations.<br />

Grazing, recreational activities and illegal off-<strong>road</strong> vehicle use in <strong>the</strong> area would have<br />

also affected Quino populations through trampling/crushing habitat or individuals and<br />

potential weed introduction to area habitat.<br />

Future development also has <strong>the</strong> potential to add to <strong>the</strong> impacts to <strong>the</strong> Quino and its<br />

habitat. Future development on <strong>the</strong> Ramona Reservation, although not currently<br />

planned, has <strong>the</strong> potential to also impact Quino and its associated habitat. Private<br />

Development and development of major <strong>road</strong>ways in <strong>the</strong> Project area is limited by<br />

natural and infrastructure constraints and is controlled by <strong>the</strong> Riverside General<br />

Plan. Private development in <strong>the</strong> Project area would be restricted to primarily Rural<br />

Community Development and would likely be subject to USFS, USFWS or MSHCP<br />

review and minimization measures. Existing and future private development is<br />

expected to impact less than 18,000 acres within <strong>the</strong> entire 548,555 acre REMAP<br />

area. No new major artery <strong>road</strong>ways are proposed <strong>for</strong> <strong>the</strong> area. The Riverside<br />

County MSHCP also has provisions dealing with <strong>the</strong> protection of Quino and its<br />

associated habitat.<br />

The ongoing impacts of on-<strong>road</strong> and off-<strong>road</strong> vehicles hitting individuals or crushing<br />

larvae and host plants. Although traffic over <strong>the</strong> Project <strong>road</strong> is not expected to<br />

increase substantially over current levels and despite speed limits and Tribal<br />

en<strong>for</strong>cement, speeding could still occur. Vehicle and off-<strong>road</strong> vehicle impacts could<br />

occur in <strong>the</strong> Project area and throughout <strong>the</strong> vicinity as several Quino populations<br />

have been documented, but vehicle impacts in occupied territories are difficult to<br />

quantify. However, <strong>the</strong> possibility of impact is reduced by <strong>the</strong> lack of a major<br />

freeway in <strong>the</strong> immediate area, and fewer <strong>road</strong>ways in general, due to <strong>the</strong><br />

remoteness of <strong>the</strong> Project area.<br />

Sensitive and Watch List Species<br />

Fourteen Forest Sensitive and Watch-list botanical species have potential to occur in<br />

<strong>the</strong> Project vicinity:<br />

Chaparral sand verbena (Abronia villosa var. aurita)<br />

Johnston's rock cress (Arabis johnstonii)<br />

Payson's jewel-flower (Caulanthus simulans)<br />

Parish’s Chaenactis (Chaenactis parishii)<br />

Cali<strong>for</strong>nia bedstraw (Galium cali<strong>for</strong>nicum ssp. Primum)<br />

Beautiful hulsea (Hulsea vestita ssp. Callicarpha)<br />

Hall's monardella (Monardella macrantha ssp. Hallii)<br />

San Felipe monardella (Monardella nana ssp. Leptosiphon)<br />

White-margined oxy<strong>the</strong>ca (Oxy<strong>the</strong>ca (Sido<strong>the</strong>ca) emarginata)<br />

Cali<strong>for</strong>nia penstemon (Penstemon cali<strong>for</strong>nicus)<br />

Frank Springer & Associates, Inc. Page 44 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Parish’s rupertia (Rupertia rigida)<br />

Sou<strong>the</strong>rn jewel-flower (Streptanthus campestris)<br />

Leafy buckwheat (Eriogonum foliosum)<br />

Lemmon’s syntrichopappus (Syntrichopappus lemmonii)<br />

Twenty Sensitive and Forest Watch-List wildlife species have potential to occur in<br />

<strong>the</strong> Project vicinity:<br />

Cali<strong>for</strong>nia legless lizard (Aniella pulchra)<br />

Coastal rosy boa (Lichanura trivirgata rosafusca)<br />

San Bernardino mountain kingsnake (Lampropeltis zonata parvirubra)<br />

Coast patch-nosed snake (Salvadora hexalepis virgultea),<br />

San Diego horned lizard (Phrynosoma coronatum blainvillii)<br />

Turkey vulture (Cathartes aura)<br />

Lewis' woodpecker (Melanerpes lewis)<br />

Loggerhead shrike (Lanius ludovicianus)<br />

Gray vireo (Vireo vicinior)<br />

Sou<strong>the</strong>rn Cali<strong>for</strong>nia rufous-crowned sparrow (Aimophila ruficeps canescens)<br />

Black-chinned sparrow (Spizella atrogularis)<br />

Bell's sage sparrow (Amphispiza belli belli)<br />

Lawrence's goldfinch (Carduelis lawrencei)<br />

Cooper’s hawk (Accipiter cooperii)<br />

Golden eagle (Aquila chrysaetos)<br />

San Diego pocket mouse (Chaetodipus fallax fallax)<br />

San Diego black-tailed jackrabbit (Lepus cali<strong>for</strong>nicus bennettii)<br />

Townsend’s big-eared bat (Corynorhinus townsendii)<br />

Cali<strong>for</strong>nia leaf-nosed bat (Macrotus cali<strong>for</strong>nicus) and<br />

Pallid bat (Antrozous pallidus),<br />

Direct and Indirect Effects<br />

No Action:<br />

For <strong>the</strong> No Action alternative, <strong>the</strong>re would be no anticipated direct or indirect impacts<br />

beyond <strong>the</strong> current condition that would affect Sensitive or Watch-list species in <strong>the</strong><br />

area. Any existing negative impacts from dust due to <strong>road</strong> use would continue.<br />

Proposed Action:<br />

For <strong>the</strong> Proposed Action alternative, <strong>the</strong> following direct and indirect effects would be<br />

expected:<br />

Botanical Species<br />

Fourteen Sensitive and/or Watch-list botanical species have suitable habitat on <strong>the</strong><br />

Frank Springer & Associates, Inc. Page 45 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Project site. While no recent occurrences of <strong>the</strong>se plants were documented within<br />

<strong>the</strong> Project area during plant surveys conducted in 2005 or 2008, <strong>the</strong>re is a chance<br />

that unobserved or new growth could be present at <strong>the</strong> time of construction.<br />

Mitigation measures/design criteria will be implemented to reduce <strong>the</strong> chances of<br />

any direct impacts to <strong>the</strong>se plants (see Table 1: Mitigation Measures/Design Criteria;<br />

Biological Resources).<br />

Indirect impacts to sensitive botanical species could occur as a result of chemical<br />

emissions, fugitive dust, human presence, and invasive species. Increases of<br />

chemical emissions and fugitive dust during construction would be temporary and<br />

due to <strong>the</strong> linear nature of <strong>the</strong> Project would be continually progressing along <strong>the</strong><br />

Project area, which would limit <strong>the</strong> time any one area would be exposed. Release of<br />

chemical emissions from vehicles would increase during construction, however due<br />

to <strong>the</strong> remote location, open area and overall minimal traffic, emissions should<br />

disperse. Impacts of chemical emissions after construction are not expected to<br />

increase substantially over current levels. The <strong>road</strong> is not a through <strong>road</strong> and would<br />

still only be utilized by <strong>the</strong> small number of residents and guests of <strong>the</strong> Reservation.<br />

Fugitive dust rates could increase during construction, but would be significantly<br />

reduced from <strong>the</strong> existing levels over <strong>the</strong> long-term by <strong>the</strong> paving of this access<br />

<strong>road</strong>. Mitigation measures/design criteria will be incorporated to minimize indirect<br />

impacts to <strong>the</strong> extent possible during construction (see Table 1: Mitigation<br />

Measures/Design Criteria; Biological Resources). The reduction in dust disturbance<br />

resulting from <strong>the</strong> paving of <strong>the</strong> current dirt <strong>road</strong> is considered a positive effect <strong>for</strong><br />

species in <strong>the</strong> area.<br />

A potential increase in non-native plant species would likely only occur along <strong>the</strong><br />

perimeter 0.15 acre impact area, but could also occur along <strong>the</strong> <strong>road</strong> edges. The<br />

limited impact area and hardscape within <strong>the</strong> impact area would limit <strong>the</strong> potential<br />

areas <strong>for</strong> invasive species to take hold. Invasive and noxious weed species seed<br />

could be spread or introduced into <strong>the</strong> area by construction equipment or normal<br />

traffic. Mitigation measures/design criteria will be employed to reduce <strong>the</strong> spread of<br />

noxious and non-native species (see Table 1: Mitigation Measures/Design Criteria;<br />

Biological Resources).<br />

Wildlife Species<br />

Cali<strong>for</strong>nia Spotted Owl<br />

No direct effects are expected. The proposed impact area and immediately adjacent<br />

lands do not support any suitable <strong>for</strong>est habitat typical to this species <strong>for</strong> nesting or<br />

roosting. The Project area is within <strong>the</strong> range of an historic, currently unoccupied<br />

Cali<strong>for</strong>nia spotted owl territory. If occupied, <strong>the</strong> Project area could be utilized <strong>for</strong><br />

<strong>for</strong>aging. Indirect effects could include avoidance of <strong>for</strong>aging in <strong>the</strong> area due to<br />

construction noise and disturbance and/or reduction in prey due to direct or indirect<br />

impacts to general small mammal species. With <strong>the</strong> wide territories of <strong>the</strong> Cali<strong>for</strong>nia<br />

Frank Springer & Associates, Inc. Page 46 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

spotted owl, and <strong>the</strong> vast, open and relatively undisturbed habitat in <strong>the</strong> Project area,<br />

<strong>the</strong>se effects would be insignificant.<br />

Birds<br />

No direct effects are expected to nesting birds due to timing of <strong>the</strong> proposed action<br />

(see Table 1: Mitigation Measures/Design Criteria; Biological Resources). Indirect<br />

impacts to <strong>for</strong>aging birds may include avoidance or abandonment of <strong>the</strong> area, over<br />

<strong>the</strong> short-term. Those species that may use <strong>the</strong> Project area <strong>for</strong> <strong>for</strong>aging will still<br />

have access to large expanses of relatively undisturbed habitat in <strong>the</strong> Project area.<br />

Foraging habitat will not be substantially reduced with <strong>the</strong> implementation of <strong>the</strong><br />

Proposed Action.<br />

Large mammal and bat species<br />

No direct effects are expected. There is a slight possibility of vehicle impacts,<br />

however given <strong>the</strong> wide territories of <strong>the</strong>se species, vast open habitat in this area, no<br />

access restrictions around <strong>the</strong> <strong>road</strong>way, no observed denning or roosting habitat in<br />

<strong>the</strong> impact area, <strong>the</strong> nocturnal habits of <strong>the</strong>se species and <strong>the</strong> high visibility of <strong>the</strong><br />

mountain lion, <strong>the</strong> possibility is minimal. Potential indirect effects during construction<br />

include noise, emissions, human presence and vibrations. With <strong>the</strong> vast range of <strong>the</strong><br />

mountain lion and bat species, and <strong>the</strong> fact that mountain lions and bat species are<br />

nocturnal and mountain lions are primarily solitary, <strong>the</strong>se effects would be<br />

considered insignificant. The proposed action will result in an insignificant amount of<br />

additional habitat fragmentation, consisting of <strong>the</strong> loss of 0.15 acre of chaparral.<br />

Given this small size, it is not a significant change beyond <strong>the</strong> current condition.<br />

Terrestrial species<br />

Direct effects may include being impacted by construction activities or as a result of<br />

<strong>the</strong> <strong>road</strong> <strong>improvement</strong>s. The noise, activity and presence of humans on <strong>the</strong> worksite<br />

will likely discourage wildlife from <strong>the</strong> site during working hours, but <strong>the</strong>y may take<br />

refuge around <strong>the</strong> equipment in off hours. These species, if present, could be<br />

injured or killed by construction equipment or vehicles. After completion of<br />

construction, vehicle impacts are not expected to substantially increase over current<br />

conditions. Increased direct effects could result from three main factors; increased<br />

speed, <strong>road</strong> maintenance and <strong>the</strong> preference of some reptiles to sun on paved<br />

surfaces. Mitigation measures/design criteria will be employed to reduce <strong>the</strong> chance<br />

of vehicle impacts with small mammals (see Table 1: Mitigation Measures/Design<br />

Criteria; Biological Resources).<br />

Noise and emission levels should be similar to current conditions after construction,<br />

as additional traffic levels are not expected, but periodic maintenance will occur. It<br />

is even likely that vibrations from <strong>road</strong> traffic would decrease after <strong>the</strong> <strong>road</strong> is paved,<br />

providing a smoo<strong>the</strong>r straighter surface and with <strong>the</strong> speed limit posted at 25 mph.<br />

The reduction in vibrations resulting from <strong>the</strong> paving of <strong>the</strong> current dirt <strong>road</strong> might be<br />

considered a positive outcome.<br />

Frank Springer & Associates, Inc. Page 47 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Increases in invasive plant species could affect <strong>the</strong> diet of small herbivore, mammal<br />

species by displacing <strong>the</strong>ir primary food sources. Mitigation measures/design<br />

criteria will be employed to reduce <strong>the</strong> risk of invasive plant species (see Table 1:<br />

Mitigation Measures/Design Criteria; Biological Resources). Large areas of<br />

undisturbed vegetation occur in <strong>the</strong> Project vicinity and would be available food<br />

sources <strong>for</strong> <strong>the</strong>se species.<br />

All wildlife species<br />

All wildlife species in <strong>the</strong> area may experience indirect effects from <strong>road</strong><br />

construction. Increases in noise, chemical emissions and vibration could result in<br />

avoidance or abandonment of <strong>the</strong> area, over <strong>the</strong> short-term. With linear nature of<br />

<strong>the</strong> Project any increase in noise, emissions and/or vibrations would be continually<br />

progressing along <strong>the</strong> Project area, which would limit <strong>the</strong> time any one area would<br />

be exposed. Due to <strong>the</strong> remote location, open area and overall minimal traffic<br />

emissions should disperse. Although some species or individuals may alter<br />

behavior, mitigation measures/design criteria that restrict construction during spring<br />

and summer will reduce impacts to all wildlife during typical reproduction periods.<br />

With incorporated mitigations (see Table 1: Mitigation Measures/Design Criteria;<br />

Biological Resources), <strong>the</strong> short-term period of construction, periodic maintenance<br />

and <strong>the</strong> presence of substantial quality habitat nearby, <strong>the</strong> Project vicinity can<br />

provide sufficient <strong>for</strong>aging and nesting habitat thus indirect effects to wildlife would<br />

be temporary and minimal.<br />

Determination<br />

R5 Sensitive Plants: The proposed Project activities may adversely affect individual<br />

Sensitive Plants, but are not likely to result in a trend toward Federal listing or loss of<br />

viability.<br />

R5 Sensitive Wildlife Species: The Project may affect individuals, but is not likely<br />

to result in a trend toward Federal listing or loss of viability <strong>for</strong> <strong>the</strong>se species.<br />

Cumulative Effects<br />

No Action and Proposed Action<br />

Cumulative effects on Sensitive and Watch-list Species are similar to those listed in<br />

<strong>the</strong> cumulative effects <strong>for</strong> Quino checkerspot butterfly <strong>for</strong> both <strong>the</strong> No Action<br />

alternative and Proposed Action.<br />

The Proposed Action would add 0.15 acres to <strong>the</strong> cumulative loss of red shank<br />

chaparral habitat in <strong>the</strong> area. Given this small size, <strong>the</strong> proposed action’s<br />

contribution to cumulative effects is not significant.<br />

Frank Springer & Associates, Inc. Page 48 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Although <strong>the</strong>re is some potential <strong>for</strong> Sensitive and Watch-list species to be impacted<br />

by <strong>the</strong> Proposed Action and isolated impacts cannot be ruled out, no additional<br />

measurable cumulative impacts to <strong>the</strong>se species are expected.<br />

Management Indicator Species<br />

For more detailed in<strong>for</strong>mation, including plant and animal species lists and applied<br />

methodology, please reference <strong>the</strong> BE/BA (L & L Environmental, Inc. 2009) which is<br />

part of <strong>the</strong> Project record and available upon request.<br />

USFS Management Indicator Species (MIS) are identified in <strong>the</strong> 2006 San<br />

Bernardino Land Management Plan (LMP). Species were selected because <strong>the</strong>ir<br />

population OR habitat trends are believed to indicate <strong>the</strong> effects of management<br />

activities, and <strong>the</strong>y are a focus <strong>for</strong> monitoring of those activities.<br />

Botany MIS<br />

None of <strong>the</strong> management indicator plant species are present within or adjacent to<br />

<strong>the</strong> proposed Project area; since none are present <strong>the</strong>re will be no impact to MIS<br />

species.<br />

Wildlife MIS<br />

There are two MIS species that may occur in <strong>the</strong> Project area: mountain lion and<br />

mule deer. Although both species could be directly impacted by traffic and<br />

construction could impact <strong>the</strong>m temporarily, <strong>the</strong> Project would not significantly<br />

change <strong>the</strong> habitat factor <strong>for</strong> which each species was chosen: habitat fragmentation<br />

and healthy diverse habitats, respectively. Implementation of <strong>the</strong> Proposed Action<br />

would be a move nei<strong>the</strong>r toward nor away from <strong>the</strong> desired condition.<br />

Migratory Birds<br />

For more detailed in<strong>for</strong>mation please reference <strong>the</strong> BE/BA (L & L Environmental, Inc.<br />

2009) which is part of <strong>the</strong> Project record and available upon request.<br />

Affected Environment<br />

Migratory Birds include common, sensitive and listed species. Impacts to migratory<br />

birds (o<strong>the</strong>r than those species specifically addressed elsewhere in this document)<br />

under this rule are limited to nesting. Habitat types utilized by migratory birds within<br />

<strong>the</strong> Project vicinity could include <strong>the</strong> interior live oak scrub and chaparral. The<br />

interior live oak habitat consists of only a few scattered trees with a scrub<br />

understory. The trees could be used <strong>for</strong> nesting by migratory birds and raptors.<br />

Species that nest in chaparral could also occur in <strong>the</strong> Project vicinity.<br />

Direct and Indirect Effects<br />

Frank Springer & Associates, Inc. Page 49 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

No Action:<br />

For <strong>the</strong> No Action alternative, <strong>the</strong>re would be no anticipated direct or indirect impacts<br />

beyond <strong>the</strong> current condition that would affect Migratory Bird species in <strong>the</strong> area.<br />

Any existing negative impacts from dust due to <strong>road</strong> use would continue.<br />

Proposed Action:<br />

Construction could result in abandonment of active nests/dens and <strong>the</strong> losses of<br />

existing eggs, and off-spring. Nests on <strong>the</strong> ground or in trees/bushes within <strong>the</strong> 0.15<br />

acre of habitat impacts could be destroyed. Nests are not expected in <strong>the</strong> active<br />

<strong>road</strong>way.<br />

Disturbances may result in abandonment of areas and disruption of courtship<br />

behaviors resulting in failure to reproduce. Design Criteria are incorporated to<br />

reduce impacts to nesting and breeding species. No construction will occur between<br />

February 1 and July 31 <strong>the</strong>reby impacts to nesting bird species (see Table 1:<br />

Mitigation Measures/Design Criteria; Biological Resources).<br />

O<strong>the</strong>r direct, indirect and cumulative effects and <strong>the</strong> applicable mitigations would be<br />

similar as <strong>the</strong> previously discussed birds and ground dwelling species (see Sensitive<br />

and Watch-list Species discussion above).<br />

General Vegetation and Wildlife<br />

For more detailed in<strong>for</strong>mation, including plant and animal species lists and applied<br />

methodology, please reference <strong>the</strong> BE/BA (L & L Environmental, Inc. 2009) which is<br />

part of <strong>the</strong> Project record and available upon request.<br />

Direct, Indirect and Cumulative Effects<br />

Effects to general vegetation and wildlife are similar to those effects previously<br />

discussed <strong>for</strong> Sensitive and Watch-list species (see above). Incorporated design<br />

features and mitigation measures will suffice to minimize effects on all species.<br />

Weed Risk<br />

Forest Service Manual 2080 Noxious Weed Management (effective since 11/29/95)<br />

states a risk <strong>assessment</strong> <strong>for</strong> noxious weeds must be completed <strong>for</strong> every <strong>project</strong>.<br />

For more detailed in<strong>for</strong>mation, please reference <strong>the</strong> Weed Risk Assessment portion<br />

of <strong>the</strong> BE/BA (L & L Environmental, Inc. 2009) which is part of <strong>the</strong> Project record and<br />

available upon request.<br />

Frank Springer & Associates, Inc. Page 50 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

The Project area has no Federal or State listed noxious weeds, but has low levels of<br />

invasive weed species. The weeds are concentrated along <strong>road</strong> shoulder. The<br />

primary concern is to keep <strong>the</strong> current populations of weedy species from spreading<br />

both within and beyond <strong>the</strong> Project area.<br />

The dominant vegetation type occurring in <strong>the</strong> Project area is red shank chaparral,<br />

which becomes susceptible to weed invasions after disturbance. The effects of<br />

disturbance associated with <strong>road</strong>s and drainage structure construction will be<br />

reduced by implementing mitigation measures/design criteria (see Table 1:<br />

Mitigation Measures/Design Criteria; Weed Risk).<br />

Determination<br />

The weed risk <strong>for</strong> pathways of introduction is Low based on <strong>the</strong> minimal impacts in<br />

construction and <strong>the</strong> Design Criteria <strong>for</strong> <strong>the</strong> Project which will limit <strong>the</strong> movement of<br />

invasive plants.<br />

Heritage Resources<br />

A series of policies, laws and regulations govern <strong>the</strong> preservation of our past in <strong>the</strong><br />

United States. The most important of <strong>the</strong>se is <strong>the</strong> National Historic Preservation Act<br />

(NHPA). This law and its implementing regulations, 36 CFR Part 800, recognize that<br />

historic properties significant to <strong>the</strong> Nation’s heritage are being lost and that <strong>the</strong><br />

cultural foundations of <strong>the</strong> Nation should be preserved as a living part of our<br />

community life and development in order to give a sense of orientation to <strong>the</strong><br />

American people (16 U.S.C. 470 (1)(b)(2-3)). In 1980 <strong>the</strong> NHPA was amended, and<br />

Section 110 was added to expand and underscore Federal agency responsibility <strong>for</strong><br />

identifying and protecting historic properties and avoiding unnecessary damage to<br />

<strong>the</strong>m. This Act specifies a set of criteria to be used <strong>for</strong> designating historic properties<br />

(e.g., districts, sites, buildings, structures, and objects etc.) as significant. Significant<br />

properties are eligible to <strong>the</strong> National Register of Historic Places (NRHP). Section<br />

106 of <strong>the</strong> NHPA compels federal agencies to take into account <strong>the</strong> effect of its<br />

undertakings on any district, site, building, structure or object that is included in or<br />

eligible <strong>for</strong> inclusion in <strong>the</strong> National Register of Historic Places (36 CFR 60) (Historic<br />

Properties).<br />

Frank Springer & Associates, Inc. Page 51 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Analysis Framework: Statute, Regulation, Forest Plan and Laws<br />

Federal laws providing <strong>for</strong> <strong>the</strong> protection and preservation of archaeological and<br />

historic sites, or require <strong>the</strong> identification and evaluation of important historic<br />

properties and <strong>the</strong> consideration of <strong>the</strong> effects of federal agency activities and<br />

programs on significant historic properties as part of land management decisions<br />

include:<br />

Antiquities Act of 1906 (34 Stat. 225; 16 U.S.C. 431-433)<br />

Historic Sites Act of 1935 (49 Stat. 666; 16 U.S.C. 461- 467)<br />

National Historic Preservation Act of 1966, as amended (80 Stat. 915 et seq.;<br />

16 U.S.C. 470 et seq.) (NHPA)<br />

National Environmental Policy Act of 1969 (NEPA), as amended (83 Stat. 852<br />

et seq.; 42 U.S.C. 4321-4347)<br />

Archaeological and Historical Data Preservation Act of 1974 (88 Stat. 174; 16<br />

U.S.C. 469)<br />

American Indian Religious Freedom Act of 1978 (92 Stat. 469; 42 U.S.C.<br />

1996)<br />

The Archaeological Resources Protection Act of 1979, as amended (ARPA)<br />

(93 Stat. 721 et seq.; 16 U.S.C. 470 et seq.) and<br />

The Native American Graves Protection and Repatriation Act of 1990 (104<br />

Stat. 3048-3058; 25 U.S.C. 3001-3013).<br />

Presidential Executive Orders addressing specific issues affecting properties,<br />

locations or resources of importance to American Indian tribes include:<br />

Executive Order 11593 entitled Protection and Enhancement of <strong>the</strong> Cultural<br />

Environment,<br />

Executive Order 13007 entitled Indian Sacred Sites and Executive Order<br />

13175 entitled Consultation and Coordination with Indian Tribal Governments.<br />

The Forest Service has also developed specific policy <strong>for</strong> complying with Section<br />

106 of <strong>the</strong> National Historic Preservation Act (NHPA), direction <strong>for</strong> <strong>the</strong> management<br />

of heritage resources can be found <strong>the</strong> Forest Service Manual (FSM 2360).<br />

Region 5 of <strong>the</strong> Forest Service has also developed specific procedures to meet <strong>the</strong><br />

requirements of NHPA Section 106 (36 CFR 800). Forests in Region 5 can comply<br />

with <strong>the</strong> region’s Motorized Recreation Programmatic Agreement, entitled<br />

Programmatic Agreement among <strong>the</strong> USDA Forest Service, Pacific Southwest<br />

Region, USDA Forest Service, Intermountain Region’s Humboldt-Toiyabe National<br />

Forest, Cali<strong>for</strong>nia State Historic Preservation Officer and Advisory Council on<br />

Historic Preservation Regarding <strong>the</strong> Process <strong>for</strong> Compliance with Section 106 of <strong>the</strong><br />

National Historic Preservation Act <strong>for</strong> Designating Motor Vehicle Routes and<br />

Managing Motorized Recreation on <strong>the</strong> National Forests in Cali<strong>for</strong>nia (Motorized<br />

Recreation PA) (2006).<br />

Frank Springer & Associates, Inc. Page 52 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Effects Analysis Methodology<br />

A records search and cultural resources survey was conducted by Tierra<br />

Environmental Services (Tierra Environmental Services, 2002).<br />

The archival research consisted of <strong>the</strong> review of records searches of <strong>the</strong> Project<br />

area conducted by <strong>the</strong> Eastern In<strong>for</strong>mation Center (EIC) located at <strong>the</strong> University of<br />

Cali<strong>for</strong>nia, Riverside. A records search was initially conducted of <strong>the</strong> entire Ramona<br />

Reservation and surrounding 1-mile radius on August 30, 2001.<br />

A supplemental records search was conducted of <strong>the</strong> southwestern most portion of<br />

<strong>the</strong> <strong>road</strong> area of potential effect (APE) and surrounding 1-mile radius on March 21,<br />

2002. Historic maps were also examined. This in<strong>for</strong>mation was used to identify<br />

previously recorded resources and determine <strong>the</strong> types of resources that might<br />

occur in <strong>the</strong> survey area.<br />

Section 106 San Bernardino National Forest Heritage Resources Programmatic<br />

Agreement Certification was provided by <strong>the</strong> San Jacinto Ranger District on March<br />

30, 2010. The APE was determined to have been previously reviewed and it was<br />

determined adequate <strong>for</strong> <strong>the</strong> purpose of historic property identification or Stipulation<br />

III(B)(5) of <strong>the</strong> 2001 Programmatic Agreement <strong>for</strong> Compliance wit Section 106 of <strong>the</strong><br />

NHPA <strong>for</strong> undertakings on <strong>the</strong> National Forests of <strong>the</strong> Pacific Southwest Region<br />

(PA). Under Stipulation III(D)(1), no historic properties were identified on <strong>the</strong> subject<br />

undertaking APE, and it was determined that <strong>the</strong> Proposed Action could be<br />

implemented without management measures.<br />

Affected Environment<br />

On April 7, 2002 <strong>the</strong> <strong>road</strong> alignment was surveyed by Tierra Environment Services<br />

using one transect along each side of <strong>the</strong> <strong>road</strong>. These transects resulted in a survey<br />

coverage of <strong>the</strong> area with less than a five meter interval. The APE has a total width<br />

of 100 feet (measured as 50 feet from each side of <strong>the</strong> <strong>road</strong>’s centerline).<br />

Direct and Indirect Effects<br />

No cultural resources were identified within <strong>the</strong> Project APE. Based on <strong>the</strong> results of<br />

previous surveys in <strong>the</strong> area and <strong>the</strong> 2002 survey, it was determined that no cultural<br />

resources would be expected to be affected by <strong>the</strong> Proposed Action, and that no<br />

fur<strong>the</strong>r cultural resources work was required. If, however, prehistoric or historic<br />

remains are discovered during construction, all activities would cease and <strong>the</strong> district<br />

archaeologist would be contacted immediately.<br />

If <strong>the</strong> No Action alternative were implemented, no direct or indirect effects to cultural<br />

resources would be expected.<br />

Cumulative Effects<br />

Frank Springer & Associates, Inc. Page 53 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

As <strong>the</strong>re are no cultural resources within <strong>the</strong> Project APE, <strong>the</strong> Proposed Action<br />

would not be expected to contribute to cumulative effects to cultural resources in <strong>the</strong><br />

area.<br />

Determination<br />

The Section 106 Certification, dated March 30, 2010 determined that <strong>the</strong> Proposed<br />

Action would have No Effect on cultural resources.<br />

Rationale <strong>for</strong> Determination:<br />

Record searches did not reveal any prior findings within <strong>the</strong> Project APE (50 feet<br />

from center line).<br />

No cultural resources were found within <strong>the</strong> Project APE.<br />

Fire Risk<br />

Affected Environment<br />

The existing access <strong>road</strong> is presently a local, unpaved <strong>road</strong> which is in deteriorated<br />

condition. Heavy rain, ice or snow on <strong>the</strong> <strong>road</strong> in <strong>the</strong> winter often prevent access to<br />

<strong>the</strong> Ramona Reservation, as poor wea<strong>the</strong>r makes <strong>the</strong> already poor <strong>road</strong> conditions<br />

even more treacherous. Because Hog Lake Road provides <strong>the</strong> only means of<br />

vehicle ingress and egress <strong>for</strong> <strong>the</strong> Ramona Tribe, <strong>the</strong> deteriorated <strong>road</strong> conditions<br />

are of particular concern during times when rapid evacuation is required.<br />

A stated priority of <strong>the</strong> LMP is community protection from wildfires. The Ramona<br />

Reservation is in a region which has historically been at high risk <strong>for</strong> wildfires.<br />

Fire prevention and o<strong>the</strong>r emergency vehicle response to <strong>the</strong> Ramona Reservation<br />

are presently slowed due to poor <strong>road</strong> conditions and a lack of signage. It is often<br />

difficult <strong>for</strong> emergency personnel to navigate <strong>the</strong>ir way around <strong>the</strong> Ramona<br />

Reservation.<br />

Direct and Indirect Effects<br />

No Action:<br />

For <strong>the</strong> No Action alternative, <strong>the</strong> risk to public safety would persist, access and<br />

response time <strong>for</strong> wildfires by emergency vehicles would continue to be slowed, and<br />

<strong>the</strong> Ramona Tribe’s only means of vehicle ingress and egress would continue to be<br />

a primary factor impairing efficient evacuation ef<strong>for</strong>ts during times of emergency or<br />

disaster.<br />

Proposed Action:<br />

Frank Springer & Associates, Inc. Page 54 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

For <strong>the</strong> Proposed Action, public safety <strong>for</strong> those traveling on Hog Lake Road will be<br />

improved. Emergency and wildfire vehicle access and response times will be<br />

improved. The <strong>road</strong> will be all-wea<strong>the</strong>r accessible, navigation will be made easier <strong>for</strong><br />

emergency vehicle personnel, and <strong>the</strong> <strong>road</strong> will be better able to accommodate<br />

larger, less easily maneuverable vehicles such as fire fighting vehicles. During times<br />

of emergency or disaster, evacuation will be made safer and more efficient <strong>for</strong><br />

Ramona Reservation residents. All construction and maintenance equipment will be<br />

maintained according to BMP’s and have all required spark arrestors and fire<br />

suppression equipment as delineated in <strong>the</strong> Fire Plan. These measures will minimize<br />

<strong>the</strong> potential <strong>for</strong> fire starts from <strong>project</strong> implementation or maintenance. After<br />

construction, <strong>the</strong>re would not be any additional fire risk to area due to<br />

implementation of <strong>the</strong> Proposed Action.<br />

Cumulative Effects<br />

No Action:<br />

Under <strong>the</strong> No Action alternative, <strong>the</strong> risk to public safety from fire would persist at<br />

current levels or increase. O<strong>the</strong>r <strong>project</strong>s in <strong>the</strong> area have reduced fire risk, such as<br />

<strong>the</strong> various fuel reduction <strong>project</strong>s, and <strong>the</strong> continued access and safety problems of<br />

Hog Lake Road would reduce <strong>the</strong> effectiveness and benefits of those o<strong>the</strong>r <strong>project</strong>s.<br />

Under <strong>the</strong> No Action alternative response times <strong>for</strong> wildfires by emergency vehicles<br />

in <strong>the</strong> area would continue to be slow and <strong>the</strong> Ramona Reservation residents and<br />

o<strong>the</strong>r <strong>road</strong> users would continue to be at great risk during times of emergency, as<br />

<strong>the</strong> sole means of vehicle ingress and egress would continue to deteriorate.<br />

Proposed Action:<br />

Under <strong>the</strong> Proposed Action better all-wea<strong>the</strong>r access will add to increased fire safety<br />

in <strong>the</strong> area and will add to <strong>the</strong> fire-risk reduction benefits imparted by <strong>the</strong> fuel<br />

reduction <strong>project</strong>s in <strong>the</strong> area. Emergency and wildfire vehicle access and response<br />

times and all-wea<strong>the</strong>r reliability will be tremendously improved. Navigation will be<br />

made easier <strong>for</strong> emergency vehicle personnel, and <strong>the</strong> <strong>road</strong> will be better able to<br />

accommodate larger, less easily maneuverable vehicles such as fire fighting<br />

vehicles, and this will benefit <strong>the</strong> entire area as fire-fighting vehicles may be able to<br />

access any wildfires starting in <strong>the</strong> area sooner. During times of emergency or<br />

disaster, <strong>the</strong> paved <strong>road</strong> will provide a reliable, safe evacuation route <strong>for</strong> all users of<br />

<strong>the</strong> <strong>road</strong>.<br />

Frank Springer & Associates, Inc. Page 55 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Land Use, Ownership, Easements, Traffic, and Road<br />

Maintenance<br />

Analysis Framework: Statute, Regulation, Forest Plan and Laws<br />

Title 36, Code of Federal Regulations, Part 251, Subpart B (36 CFR part 251,<br />

subpart B) is <strong>the</strong> principal authority <strong>for</strong> screening special use proposals, filing and<br />

processing special use applications, and preparing authorizations.<br />

Federal Land Policy and Management Act (PLPMA) of October 21, 1976 (90 Stat.<br />

2743, as amended; 43 U.S.C. 1701) is <strong>the</strong> primary authority <strong>for</strong> <strong>the</strong> Forest Service to<br />

acquire and grant easements. A Section of <strong>the</strong> act authorizes <strong>the</strong> Secretary of<br />

Agriculture to acquire access (lands or interest <strong>the</strong>rein) over non-Federal lands to<br />

units of <strong>the</strong> National Forest System by exchange [of land or rights in land].<br />

Title 36, Code of federal Regulations, Part 251, Subpart B Section 251.63 addresses<br />

reciprocity.<br />

The Department of <strong>the</strong> Interior regulations in Title 25, Code of Federal Regulations,<br />

Part 169 (36 CFR 169). This part contains requirements <strong>for</strong> easements on Indian<br />

lands.<br />

Affected Environment<br />

As illustrated in Figure 3, Land Ownership and Proposed Easements, <strong>the</strong> Proposed<br />

Action begins where Hog Lake Road crosses National Forest System lands, just<br />

north of Wheat Road, and continues along Hog Lake Road (aka NFR 6S18) through<br />

National Forest System land, and ends inside <strong>the</strong> Ramona Reservation near <strong>the</strong><br />

intersection with Table Mountain Road (AKA Forest Service Road 6S20).<br />

There are two privately owned parcels between Bautista Road and Wheat Road and<br />

<strong>the</strong> National Forest Boundary. The parcel at <strong>the</strong> southwest end of <strong>the</strong> <strong>project</strong> has<br />

been purchased by <strong>the</strong> Ramona Tribe (APN 572-050-047). The parcel between it<br />

and <strong>the</strong> National Forest boundary (APN 572-050-048) is owned by ano<strong>the</strong>r<br />

individual. The travel route crossing <strong>the</strong> private land is not recognized in <strong>the</strong> County<br />

Transportation System. Nei<strong>the</strong>r <strong>the</strong> Forest Service nor <strong>the</strong> BIA has a recorded<br />

easement across <strong>the</strong> private lands, <strong>the</strong> Reservation or Forest lands, respectively. As<br />

part of this Proposed Action, land use easements are being requested to be<br />

recorded across <strong>the</strong> private land. The Proposed Action would enable <strong>the</strong> Forest<br />

Service to grant a special use easement to <strong>the</strong> BIA over <strong>the</strong> NFR 6S18 alignment<br />

and approve reconstruction plans <strong>for</strong> a paved and properly drained <strong>road</strong>bed.<br />

Wheat Road runs in an east/west direction south of <strong>the</strong> National Forest Boundary<br />

separating <strong>the</strong> private parcels from National Forest Service (NFS) land. The <strong>road</strong><br />

appears to be unused and is in very poor condition. However it is in <strong>the</strong> County Road<br />

Frank Springer & Associates, Inc. Page 56 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

System. Hog Lake Road crosses Wheat Road and enters Forest lands. Hog Lake<br />

Road is “a classified Forest Road and necessary <strong>for</strong> <strong>the</strong> protection, administration,<br />

and utilization of <strong>the</strong> National Forest System lands and <strong>the</strong> use and development of<br />

its resources.” Since it is classified any change to its “as built” condition would<br />

require construction stipulations in addition to a special use easement. Hog Lake<br />

<strong>road</strong> continues to <strong>the</strong> Ramona Reservation’s west boundary and continues into <strong>the</strong><br />

Ramona Reservation. The Proposed Action terminates inside <strong>the</strong> Ramona<br />

Reservation at <strong>the</strong> intersection of a <strong>road</strong> leading out towards Hog Lake.<br />

A variety of land uses are permitted on National Forest System lands, including<br />

timber harvesting, <strong>road</strong> construction, horseback riding, camping, and o<strong>the</strong>r<br />

recreational activities.<br />

As illustrated in Figure 9, Land Use, land use on and around <strong>the</strong> Project site includes<br />

shrub and brush rangeland, cropland and pasture, and mixed rangeland. Inside <strong>the</strong><br />

Ramona Reservation boundary <strong>the</strong>re are a number of unoccupied building structures<br />

located near Hog Lake near <strong>the</strong> nor<strong>the</strong>rn terminus of <strong>the</strong> Project site.<br />

Land uses to <strong>the</strong> south of <strong>the</strong> Ramona Reservation in <strong>the</strong> Anza-Terwilliger valleys<br />

are primarily rural residential and agricultural, with apple, potato, grain and pasture<br />

agricultural operations.<br />

There are no Federal Communications Commission (FCC) or Federal Aviation<br />

Administration (FAA) sites located in <strong>the</strong> vicinity of <strong>the</strong> Project area.<br />

Hog Lake Road provides access to National Forest System lands and Ramona<br />

Reservation access to Tribal members of <strong>the</strong> Ramona Tribe. There are presently 3<br />

houses on <strong>the</strong> Ramona Reservation and <strong>the</strong> number of trips per day along <strong>the</strong> <strong>road</strong><br />

is relatively low. Road <strong>improvement</strong>s will terminate on <strong>the</strong> Ramona Reservation near<br />

<strong>the</strong> intersection of Table Mountain Road, and will not provide an attractive means of<br />

through access to o<strong>the</strong>r destinations <strong>for</strong> <strong>the</strong> general public, and <strong>the</strong> improved <strong>road</strong><br />

will <strong>the</strong>re<strong>for</strong>e be unlikely to attract significantly increased traffic volume. Plans <strong>for</strong> a<br />

future ecotourism enterprise by <strong>the</strong> Ramona Tribe would also be unlikely to<br />

significantly increase traffic volumes as all visitors will be directed to park offsite and<br />

would be taken via electric vehicle up and down Hog Lake Road to and from <strong>the</strong><br />

Ramona Reservation.<br />

Road maintenance such as <strong>the</strong> filling of potholes will be provided by <strong>the</strong> Ramona<br />

Tribe on a periodic basis based on site evaluations. Road drainage features will be<br />

checked by <strong>the</strong> Tribe be<strong>for</strong>e and after major storms and maintenance and repairs<br />

per<strong>for</strong>med as required to keep <strong>the</strong> drainage features functional. Additional<br />

maintenance will be per<strong>for</strong>med by <strong>the</strong> Ramona Tribe as needed to per<strong>for</strong>m repairs to<br />

<strong>the</strong> <strong>road</strong> asphalt berms, paved surface, signage, concrete features, and <strong>road</strong> striping<br />

and pavement markings. Any scheduled maintenance of <strong>the</strong> <strong>road</strong> will occur outside<br />

of <strong>the</strong> time period between February 1 st to July 31 st - <strong>the</strong> Quino checkerspot butterfly<br />

Frank Springer & Associates, Inc. Page 57 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Figure 9: Land Use<br />

flight season and <strong>the</strong> growth season <strong>for</strong> Quino checkerspot butterfly host plants. If<br />

immediate <strong>road</strong> repairs need to be completed within this time period (due to storm<br />

damage, etc.), <strong>the</strong> Ramona Tribe will contact Fish & Wildlife Service, by email or<br />

telephone, prior to per<strong>for</strong>ming <strong>the</strong> repairs, in order to obtain preventative measures<br />

that must be taken to reduce or eliminate risk to Quino when <strong>the</strong> repairs are<br />

per<strong>for</strong>med.<br />

Transportation Facility Jurisdiction is <strong>the</strong> legal right to control or regulate use of a<br />

transportation facility derived from an easement. While jurisdiction requires authority,<br />

it does not necessarily reflect ownership. The BIA (and <strong>the</strong>re<strong>for</strong>e <strong>the</strong> Ramona Tribe)<br />

would gain jurisdiction of Hog Lake Road, which provides legal ingress and egress to<br />

<strong>the</strong> Ramona Reservation.<br />

Frank Springer & Associates, Inc. Page 58 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Direct, Indirect and Cumulative Effects<br />

No Action:<br />

Under <strong>the</strong> No Action alternative <strong>the</strong>re would be no granting of easements. Road<br />

maintenance issues would remain unresolved. Lacking an authorization <strong>for</strong><br />

maintenance or use, <strong>the</strong> Ramona Tribe would be subject to inconvenience, <strong>road</strong><br />

closures due to driving conditions or Forest Closures (due to fire indexes, snow,<br />

etc.).<br />

Proposed Action:<br />

Under <strong>the</strong> Proposed Action, easement and maintenance issues would be resolved.<br />

An easement <strong>for</strong> an already existing <strong>road</strong> has <strong>the</strong> effect of turning over jurisdiction of<br />

<strong>the</strong> <strong>road</strong> to <strong>the</strong> proposing public <strong>road</strong> agency.<br />

The Proposed Action would not cause an increase in traffic which is substantial in<br />

relation to <strong>the</strong> existing traffic load and capacity of <strong>the</strong> street system (i.e., result in a<br />

substantial increase in ei<strong>the</strong>r <strong>the</strong> number of vehicle trips, <strong>the</strong> volume to capacity ratio<br />

on <strong>road</strong>s, or congestion at intersections). The Proposed Action would not cause a<br />

change to traffic patterns. Travel on Hog Lake Road will become safer as a result of<br />

implementing <strong>the</strong> Proposed Action. The <strong>road</strong> width will be uni<strong>for</strong>m, lines of sight<br />

enhanced, striping and signage added, and <strong>the</strong> <strong>road</strong> structure and drainage<br />

improved. Emergency vehicle access will be greatly improved as a result of<br />

implementing <strong>the</strong> Proposed Action.<br />

No negative impacts to traffic and circulation are anticipated from <strong>the</strong> Proposed<br />

Action long term. However, during construction <strong>the</strong>re may be some delays. The<br />

proposed action does not physically divide an established community, or conflict with<br />

any applicable plans or policy. The Project would not impact any existing<br />

recreational activities or facilities. The Proposed Action would not increase <strong>the</strong> use of<br />

an existing neighborhood, regional park, or recreational facility such that substantial<br />

physical deterioration of <strong>the</strong> facility would occur or be accelerated.<br />

Socio-economic and Noise Effects<br />

The social and economic effects are <strong>the</strong> direct and indirect impacts of <strong>the</strong> Proposed<br />

Action or No Action alternatives on <strong>the</strong> residents of <strong>the</strong> Project area.<br />

Affected Environment<br />

Hog Lake Road is presently an unpaved <strong>road</strong> providing <strong>the</strong> only means of vehicle<br />

access to <strong>the</strong> Ramona Reservation. The <strong>road</strong> has structural problems caused by<br />

erosion and improper drainage. Lines of sight are insufficient, presenting safety<br />

concerns. The width of <strong>the</strong> <strong>road</strong> is variable and inconsistent, and not up to Forest<br />

Frank Springer & Associates, Inc. Page 59 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Service standards. Heavy rain, ice or snow on <strong>the</strong> <strong>road</strong> in <strong>the</strong> winter often prevents<br />

access to <strong>the</strong> Ramona Reservation, as poor wea<strong>the</strong>r makes <strong>the</strong> already poor <strong>road</strong><br />

conditions even more treacherous. Emergency vehicle access to <strong>the</strong> Ramona<br />

Reservation is presently slowed due to poor <strong>road</strong> conditions and a lack of signage. It<br />

is often difficult <strong>for</strong> emergency personnel to navigate <strong>the</strong>ir way to <strong>the</strong> Ramona<br />

Reservation.<br />

The Forest Service has previously granted <strong>the</strong> Ramona Tribe a <strong>road</strong> use permit <strong>for</strong><br />

Hog Lake Road; however, this easement has now expired. There is no active <strong>road</strong><br />

maintenance agreement <strong>for</strong> this <strong>road</strong>. The proposed Project would rectify <strong>the</strong>se<br />

issues. An easement would be granted to <strong>the</strong> Ramona Tribe by <strong>the</strong> Forest Service.<br />

The <strong>road</strong> would be brought into <strong>the</strong> BIA system, and responsibility <strong>for</strong> future <strong>road</strong><br />

maintenance would be resolved.<br />

Direct, Indirect, and Cumulative Effects<br />

No Action:<br />

For <strong>the</strong> No Action alternative, none of <strong>the</strong> safety concerns presented by <strong>the</strong> existing<br />

<strong>road</strong> conditions would be addressed. Access to <strong>the</strong> Reservation would continue to<br />

be difficult and dangerous in poor wea<strong>the</strong>r conditions. Emergency vehicle response<br />

times and evacuation time <strong>for</strong> residents and visitors on <strong>the</strong> reservation would<br />

continue to be slowed. Erosion damage to <strong>the</strong> <strong>road</strong> would continue as a result of<br />

improper drainage of <strong>the</strong> <strong>road</strong> continuing. No right-of-way, easement, or <strong>road</strong><br />

maintenance issues would be resolved. Noise levels would remain at <strong>the</strong> same<br />

levels as at present.<br />

Proposed Action:<br />

The paved route provided by <strong>the</strong> Proposed Action will facilitate safer, easier access<br />

to <strong>the</strong> Ramona Reservation <strong>for</strong> residents and Tribal members, and provide improved<br />

emergency vehicle response time. The installation of striping and signage will<br />

increase <strong>road</strong> safety and better navigation. Repair of structural deficiencies and<br />

improved drainage structures will prevent <strong>road</strong> erosion. Lines of sight will be<br />

improved. In short, a <strong>road</strong> reconstructed, improved and frequently maintained will be<br />

much safer <strong>for</strong> residents and visitors, and allow <strong>for</strong> better and more reliable allseason<br />

access. The proposed Project will, through issuance of reciprocal<br />

easements, create efficiencies in <strong>road</strong> maintenance and management.<br />

Construction of <strong>the</strong> Proposed Action would temporarily increase noise levels and<br />

may cause ground borne vibrations or noise due to construction equipment. These<br />

temporary construction noise impacts would be reduced to a less than significant<br />

level through implementation of mitigation measures / design criteria.<br />

The Proposed Action would also provide an economic benefit to <strong>the</strong> Ramona Tribe<br />

as a paved <strong>road</strong> would reduce vehicle wear, tear and damage and <strong>the</strong> associated<br />

maintenance and repair costs, as well as <strong>the</strong> likelihood of <strong>road</strong> impassibility due to<br />

poor wea<strong>the</strong>r and <strong>the</strong> subsequent loss of work and wages. Additionally it would<br />

better allow <strong>for</strong> <strong>the</strong> future development of Tribal enterprises.<br />

Frank Springer & Associates, Inc. Page 60 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Soil and Hydrology<br />

Statutes, Regulations, Forest Plan and O<strong>the</strong>r Direction<br />

Direction relevant to <strong>the</strong> proposed action as it affects hydrologic resources includes:<br />

San Bernardino National Forest Land Management Plan<br />

The Forest was established to protect <strong>the</strong> watersheds that influence runoff and<br />

supply water to local communities and municipalities. The Soil and Watershed<br />

Program cooperates with various water agencies and o<strong>the</strong>r national <strong>for</strong>est functional<br />

areas to reduce erosion and maintain high quality water <strong>for</strong> various users and natural<br />

resources through application of Best Management Practices in all Forest Service<br />

activities (WAT 1 – Watershed Function) (LMP, Part 2, pg. 27, pg.136).<br />

Forest Service Handbook (FSH), (supplemental to <strong>the</strong> LMP) 2509.22 Chapter 3.21 –<br />

Stream Protection Measures General to all management activities: 1. All applicable<br />

best management practices (BMPs) (USDA <strong>for</strong>est service 2000) should be identified<br />

and followed in all ground disturbing <strong>for</strong>est management actions, including all<br />

contracts, operating plans, and work orders. Chapter 3.30 - Road Construction and<br />

Maintenance: 4. New culverts, bridges and o<strong>the</strong>r stream crossing structures should<br />

be designed to accommodate at least a 50-year flood event, including associated<br />

bed load and debris movement (page 19 and 20 of 33).<br />

Appendix D of <strong>the</strong> LMP – Adaptive Mitigation <strong>for</strong> Recreation Uses lists actions and<br />

practices <strong>for</strong> all existing and new recreation sites and uses whenever a conflict<br />

between uses or sensitive resources is detected. Sensitive resources include<br />

riparian habitats, soils and watersheds.<br />

Appendix E of <strong>the</strong> LMP – Five-Step Project Screening Process <strong>for</strong> Riparian<br />

Conservation Areas provides direction to ensure riparian conservation areas (RCAs)<br />

are recognized, emphasized and managed appropriately during new <strong>project</strong> planning<br />

and implementation.<br />

Frank Springer & Associates, Inc. Page 61 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Forest Service Manual Direction<br />

Region 5 Supplement 2500-92-2 to FSM 2526 discusses riparian area management<br />

and is fur<strong>the</strong>r defined by The San Bernardino Supplement to 2509.22 – Soil and<br />

Water Conservation Practices Handbook, FSH 2509.22-2005-1.<br />

Region 5 Supplement 2500-93-1 to FSM 2530 gives guidance on water quality<br />

management and <strong>the</strong> application of Best Management Practices (BMP). Section<br />

2532.03 states “it is <strong>the</strong> policy of Region 5 that water quality management on<br />

National Forest System lands in Cali<strong>for</strong>nia shall be conducted within <strong>the</strong> guidelines<br />

and procedures set <strong>for</strong>th in R-5 FSH 2509.22 Soil and Water<br />

Conservation Handbook and in accordance with <strong>the</strong> Management Agency<br />

Agreement executed in 1981 between <strong>the</strong> Forest Service and State Water<br />

Resources Control Board”.<br />

2560 and 2880 Groundwater Resources Management Draft direction<br />

EO 11988 and 11990, Floodplain and Wetland Protection - Floodplain and wetland<br />

delineation will occur as part of this analysis. Floodplain and wetland protection<br />

BMPs will be integrated into <strong>project</strong> design. Floodplain and wetland guidance is also<br />

found in 2509.22-2005-1 sec 2.3.<br />

Clean Water Act of 1948 (as amended in 1972 and 1987) - The Clean Water Act of<br />

1948 (as amended in 1972 and 1987) establishes as federal policy <strong>the</strong> control of<br />

point and non-point pollution and assigns <strong>the</strong> States <strong>the</strong> primary responsibility <strong>for</strong><br />

control of water pollution. Compliance with <strong>the</strong> Clean Water Act by National Forests<br />

in Cali<strong>for</strong>nia is achieved under State Law (The Cali<strong>for</strong>nia Water Code, including <strong>the</strong><br />

Porter-Cologne Water-Quality Act (as amended in 2006)).<br />

The state of Cali<strong>for</strong>nia, in accordance with EPA and as required by <strong>the</strong> Clean Water<br />

Act (CWA), Section 303(1) (A), has identified water bodies impaired by specific<br />

pollutants. Impaired water bodies may not fully support <strong>the</strong>ir designated beneficial<br />

uses and are placed on <strong>the</strong> State 303(d) list <strong>for</strong> fur<strong>the</strong>r study or development of a<br />

TMDL plan <strong>for</strong> <strong>the</strong> pollutant deemed to be impairing use.<br />

Water Quality Management <strong>for</strong> Forest Service System Lands in Cali<strong>for</strong>nia, 2000 -<br />

Non-point source pollution on national <strong>for</strong>ests is managed through <strong>the</strong> Regional<br />

Water Quality Management Plan (USDA Forest Service 2000), which relies on<br />

implementation of BMPs.<br />

The Cali<strong>for</strong>nia Water Code consists of a comprehensive body of law that<br />

incorporates all state laws related to water, including water rights, water<br />

developments and water quality. The laws related to water quality (sections 13000 to<br />

13485) apply to waters on <strong>the</strong> national <strong>for</strong>ests and are directed at protecting <strong>the</strong><br />

beneficial uses of water. Of particular relevance <strong>for</strong> <strong>the</strong> proposed action is section<br />

13369, which deals with non point-source pollution and BMPs.<br />

Frank Springer & Associates, Inc. Page 62 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

The Porter-Cologne Water-Quality Act, as amended in 2006 - The Porter-Cologne<br />

Act, (as amended in 2006), is included in <strong>the</strong> Cali<strong>for</strong>nia Water Code. This act<br />

provides <strong>for</strong> <strong>the</strong> protection of water quality by <strong>the</strong> State Water Resources Board and<br />

<strong>the</strong> Regional Water Quality Control Boards, which are authorized by <strong>the</strong> US<br />

Environmental Protection Agency (US EPA) to en<strong>for</strong>ce <strong>the</strong> Clean Water Act of<br />

Cali<strong>for</strong>nia. Section 13263 of <strong>the</strong> Porter Cologne Act requires compliance with <strong>the</strong><br />

Provisions of <strong>the</strong> Federal Water Pollution control Act as amended in 1972 (also<br />

known as <strong>the</strong> CWA) and preparation of a Pollution Prevention Plan <strong>for</strong> all <strong>project</strong>s.<br />

Direction relevant to <strong>the</strong> proposed action as it affects soil resources includes:<br />

San Bernardino National Forest Land Management Plan - The Soil and Watershed<br />

Program cooperates with various water agencies and o<strong>the</strong>r national <strong>for</strong>est functional<br />

areas to reduce erosion and maintain high quality water <strong>for</strong> various users and natural<br />

resources through application of Best Management Practices in all Forest Service<br />

activities (WAT 1 – Watershed Function) (LMP, Part 2, pg. 27,pg. 136)<br />

Forest Service Handbook (FSH), (supplemental to <strong>the</strong> LMP) 2509.22 Chapter 3.21 –<br />

Stream Protection Measures General to all management activities: 1. all applicable<br />

best management practices (BMPs) (USDA <strong>for</strong>est service 2000) should be identified<br />

and followed in all ground disturbing <strong>for</strong>est management actions, including all<br />

contracts, operating plans, and work orders. Chapter 3.30 - Road Construction and<br />

Maintenance: 4. New culverts, bridges and o<strong>the</strong>r stream crossing structures should<br />

be designed to accommodate at least a 50-year flood event, including associated<br />

bed load and debris movement (page 19 and 20 of 33).<br />

National Forest Management Act of 1976 - Renewable Resource Program.<br />

“recognize <strong>the</strong> fundamental need to protect and where appropriate, improve <strong>the</strong><br />

quality of soil, water and air resources.”<br />

Compliance with <strong>the</strong> Forest Plan and O<strong>the</strong>r Direction<br />

San Bernardino National Forest Plan (2006)<br />

Forest Wide Standards and Guidelines, Strategies and Tactics (LMP, Part 2,<br />

Appendix B, pp. 134-136). The Proposed Action is consistent with <strong>the</strong> Forest Plan if<br />

mitigation measures / design criteria are implemented.<br />

Best Management Practices to incorporate into design criteria<br />

Reference: USDA Forest Service, 2000, Water Quality Management <strong>for</strong> Forest<br />

System Lands in Cali<strong>for</strong>nia: Best Management Practices, Pacific Southwest Region.<br />

“Pursuant to Section 208 of <strong>the</strong> Clean Water Act, all agencies responsible <strong>for</strong><br />

carrying out any portion of a State Water Quality Management Plan must be<br />

designated as a Water Quality Management Agency (WQMA). Through <strong>the</strong><br />

execution of a <strong>for</strong>mal Management Agency Agreement (MAA) with <strong>the</strong> Forest<br />

Frank Springer & Associates, Inc. Page 63 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Service in 1981, <strong>the</strong> SWRCB designated <strong>the</strong> Forest Service (USFS) as <strong>the</strong> WQMA<br />

<strong>for</strong> NFS lands in Cali<strong>for</strong>nia (See Section 14).”<br />

Erosion Control Plan (PRACTICE: 2-2) - To limit and mitigate erosion and<br />

sedimentation through effective planning prior to initiation of construction activities<br />

and through effective contract administration during construction.<br />

The detailed mitigations are reflected in <strong>the</strong> contract specifications and provisions.<br />

The intent of mitigation is to prevent construction-generated erosion, as well as that<br />

generated from <strong>the</strong> completed <strong>road</strong>, from entering watercourses.<br />

Following <strong>the</strong> decision, <strong>the</strong> Forest Hydrologist will incorporate all appropriate and<br />

applicable BMPs into <strong>the</strong> Erosion Control Plan and be included in pre-construction<br />

meetings with <strong>the</strong> contractor and proponent to describe <strong>the</strong> required BMPs.<br />

Timing of Construction Activities (PRACTICE: 2-3) - To minimize erosion by<br />

conducting operations during minimal runoff periods. Construction of drainage<br />

facilities and per<strong>for</strong>mance of o<strong>the</strong>r contract work to control erosion and<br />

sedimentation will be required in conjunction with earthwork <strong>project</strong>s. The operator<br />

should limit <strong>the</strong> amount of area being graded at a site at any one time, and should<br />

minimize <strong>the</strong> time that an area is laid bare. Erosion control work must be kept current<br />

when <strong>road</strong> construction occurs outside of <strong>the</strong> normal operating season.<br />

Stabilization of Road Slope Surfaces and Spoil Disposal Areas (PRACTICE: 2-<br />

4) - To minimize erosion from exposed cut slopes, fill slopes, and spoil disposal<br />

areas. Depending on site factors such as slope angle, soil type, climate, and<br />

proximity to waterways, many fill slopes, some cut slopes, and some spoil disposal<br />

areas will require vegetative and/or mechanical measures to provide surface soil<br />

stability.<br />

Road Slope Stabilization Construction Practices (PRACTICE: 2-5) - To reduce<br />

sedimentation by minimizing erosion from <strong>road</strong> slopes and slope failure along <strong>road</strong>s.<br />

Plan all <strong>road</strong> construction considering adequate stabilization needs. The first<br />

planning requirement is an adequate soils and geologic investigation, to provide data<br />

necessary <strong>for</strong> proper cut and fill design.<br />

Control of Road Drainage (PRACTICE: 2-7) - Objective: Is to minimize <strong>the</strong> erosive<br />

effects of water concentrated by <strong>road</strong> drainage features; to disperse runoff from<br />

disturbances within <strong>the</strong> <strong>road</strong> clearing limits; to lessen <strong>the</strong> sediment yield from <strong>road</strong>ed<br />

areas; to minimize erosion of <strong>the</strong> <strong>road</strong> prism by runoff from <strong>road</strong> surfaces and from<br />

uphill areas.<br />

Timely Erosion Control Measures on Incomplete Roads and Stream Crossing<br />

Projects (PRACTICE: 2-9) - The best drainage design can be ineffective if erosion<br />

control has not been completed by <strong>the</strong> end of <strong>the</strong> normal operating season. Apply<br />

protective measures to all areas of disturbed, erosion-prone, unprotected ground<br />

that is not to be fur<strong>the</strong>r disturbed in <strong>the</strong> present year. When conditions permit<br />

operations outside of <strong>the</strong> normal operating season, update <strong>the</strong> operating plan as<br />

necessary and keep erosion control measures sufficiently current with ground<br />

Frank Springer & Associates, Inc. Page 64 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

disturbance to allow rapid closure when wea<strong>the</strong>r conditions deteriorate. Do not leave<br />

<strong>project</strong> areas <strong>for</strong> <strong>the</strong> winter with remedial measures incomplete.<br />

Construction of Stable Embankments (Fills) (PRACTICE: 2-10) - To minimize fill<br />

failures, design and construct <strong>the</strong> <strong>road</strong>way as a stable and durable earthwork<br />

structure with adequate strength to support <strong>the</strong> treadway, shoulders, subgrade and<br />

<strong>the</strong> <strong>road</strong>s traffic loads.<br />

Control of Sidecast Material During Construction and Maintenance<br />

(PRACTICE: 2-11) - Sidecasting is an unacceptable construction alternative in areas<br />

where it can adversely impact water quality. Prior to <strong>the</strong> start of construction, or<br />

maintenance activities, waste areas must be located where excess material can be<br />

deposited and stabilized. During <strong>road</strong> maintenance operations, potential sidecast<br />

and o<strong>the</strong>r waste material will be utilized on <strong>the</strong> <strong>road</strong> surface or removed to<br />

designated disposal sites.<br />

Servicing and Refueling of Equipment (PRACTICE: 2-12) - During servicing and<br />

refueling of <strong>road</strong> construction equipment, any spilled pollutants can be transported<br />

by runoff to surface waters. If <strong>the</strong> volume of fuel exceeds 660 gallons in a single<br />

container, or if total storage at a site exceeds 1,320 gallons, <strong>project</strong> Spill Prevention,<br />

Containment and Counter Measures (SPCC) plans are required.<br />

Control of Construction and Maintenance Activities Adjacent to SMZs<br />

(PRACTICE: 2-13) - To protect water quality by controlling construction and<br />

maintenance actions within and adjacent to any streamside management zone so<br />

that <strong>the</strong> following SMZ functions are not impaired:<br />

1) Acting as an effective filter <strong>for</strong> sediment generated by erosion from bare surfaces,<br />

<strong>road</strong> fills, dust drift, and oil traces;<br />

2) Maintaining shade, riparian habitat (aquatic and terrestrial), and channel<br />

stabilizing effects;<br />

3) Keeping <strong>the</strong> floodplain surface in a resistant, undisturbed condition to slow water<br />

velocities and limit erosion by flood flows.<br />

Controlling In-Channel Excavation (PRACTICE: 2-14) - Excavation during <strong>the</strong><br />

installation of instream structures must follow all of <strong>the</strong> following minimum water<br />

quality protection requirements.<br />

1) Unless o<strong>the</strong>rwise approved, no excavation will be made outside of caissons, cribs,<br />

cofferdams, or sheet piling.<br />

2) The natural streambed or <strong>lake</strong> bottom adjacent to <strong>the</strong> structure will not be<br />

disturbed without prior approval of <strong>the</strong> ER or COR.<br />

3) If any excavation, or dredging is made at <strong>the</strong> site of <strong>the</strong> structure be<strong>for</strong>e caissons,<br />

cribs, or cofferdams are sunk in place, all such excavations will be restored to <strong>the</strong><br />

original surface and <strong>the</strong> streambed or <strong>lake</strong> bottom must be protected with suitable<br />

stable material.<br />

4) Material deposited within <strong>the</strong> steam or <strong>lake</strong> area from foundation, or o<strong>the</strong>r<br />

excavation will not be discharged directly into live streams or <strong>lake</strong>s, but will be put<br />

Frank Springer & Associates, Inc. Page 65 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

into settling areas as shown on <strong>the</strong> engineering drawings or as approved by <strong>the</strong> ER,<br />

or COR. (See Practice 2-15)<br />

5) If <strong>the</strong> channel or <strong>lake</strong> bottom is disturbed during construction, it must be restored<br />

to its original configuration while minimizing any additional disturbance.<br />

6) Disturbances of stream or <strong>lake</strong> banks are kept to a minimum. Disturbed banks are<br />

stabilized.<br />

Diversion of Flows Around Construction Sites (PRACTICE: 2-15) - Streamflow<br />

must be diverted around construction sites such as bridges, culverts and dams. The<br />

streamflow will be diverted <strong>for</strong> all live streams according to <strong>the</strong> instructions of <strong>the</strong> ER.<br />

The diverted flows are returned to <strong>the</strong>ir natural streamcourse as soon as possible<br />

after construction or at least prior to <strong>the</strong> rainy season. All disturbed areas are<br />

stabilized prior to <strong>the</strong> rainy season or as needed.<br />

Bridge and Culvert Installation (PRACTICE: 2-17) - Excavation is a common<br />

requirement <strong>for</strong> <strong>the</strong> installation of bridges, culverts, weirs, check dam, riprapping and<br />

o<strong>the</strong>r structures. Spoil material generated during construction should nei<strong>the</strong>r obstruct<br />

<strong>the</strong> stream course (including natural floodplains) nor impair <strong>the</strong> efficiency of <strong>the</strong><br />

associated structures.<br />

Preventive measures include:<br />

1) Keep excavated materials out of channels.<br />

2) Remove any materials stacked, or stockpiled on floodplains prior to <strong>the</strong> rainy<br />

season.<br />

3) Divert flowing water around work sites to minimize erosion and sedimentation.<br />

4) Suitably locate bypass <strong>road</strong>s and develop plans <strong>for</strong> <strong>the</strong>ir subsequent obliteration<br />

and stabilization.<br />

5) In some cases, fill material may have to be imported <strong>for</strong> better soil compaction.<br />

Original fill may have to be exported to a disposal site.<br />

Specifying Riprap Composition (PRACTICE: 2-20) - Objective: To minimize<br />

sediment production associated with <strong>the</strong> installation and utilization of riprap material.<br />

Maintenance of Roads (PRACTICE: 2-22) - Objective: To maintain <strong>road</strong>s in a<br />

manner which provides <strong>for</strong> water quality protection by minimizing rutting, failures,<br />

sidecasting, and blockage of drainage facilities all of which can cause erosion and<br />

sedimentation, and deteriorating watershed conditions.<br />

Monitoring requirements to be included in design criteria<br />

ALL in-channel construction occurring in flowing or dry streams must be evaluated.<br />

The following protocols will be used to document <strong>the</strong> activities associated with <strong>the</strong><br />

installation of <strong>the</strong> culvert.<br />

All conditions of <strong>the</strong> 404/401 permits will be followed<br />

The Forest hydrologist and/or Forest engineer will be in<strong>for</strong>med as to <strong>the</strong> time<br />

schedule <strong>for</strong> installation providing <strong>the</strong> opportunity to be onsite during <strong>the</strong><br />

process<br />

Frank Springer & Associates, Inc. Page 66 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Prior to <strong>the</strong> beginning of construction, photographs will be taken at <strong>the</strong> site<br />

documenting <strong>the</strong> condition of <strong>the</strong> channel and streambanks to a distance of 5<br />

active channel widths (Active channel width [ACW] is <strong>the</strong> width of channel<br />

inundated by <strong>the</strong> annual peak flow.)<br />

Implementation monitoring will include an evaluation of diversion (if needed),<br />

location of excavated or stockpiled material, and disturbed channel<br />

restoration<br />

Effectiveness monitoring will be more intensive if <strong>the</strong> channel is flowing due to<br />

a localized event or <strong>the</strong> timing of <strong>the</strong> installation. If <strong>the</strong> monitoring shows<br />

excess sedimentation or turbidity <strong>the</strong>n <strong>the</strong> <strong>project</strong> will be halted pending <strong>the</strong><br />

installation of additional BMPs.<br />

o If <strong>the</strong> channel is flowing, <strong>the</strong>n a comparison will be made between a<br />

location 10 ACWs above <strong>the</strong> site and 10 ACWs below <strong>the</strong> construction<br />

o If <strong>the</strong> channel is flowing, <strong>the</strong>n turbidity will be tracked to a distance of<br />

20 ACWs below <strong>the</strong> site.<br />

If <strong>the</strong> channel is not flowing, <strong>the</strong>n <strong>the</strong> protocols <strong>for</strong> effectiveness include:<br />

o disturbed channel will be checked to a distance of 3 ACW, 5 ACW, or<br />

beyond 5 ACW<br />

o if fill is in <strong>the</strong> channel<br />

o if fill and construction material is left in <strong>the</strong> 5-yr floodplain<br />

Monitoring will also be conducted following one winter season after<br />

completion of <strong>the</strong> <strong>project</strong> to see if sediment is eroding from <strong>the</strong> site, if material<br />

left on site is stable or entering <strong>the</strong> channel, and if <strong>the</strong> disturbed channel was<br />

returned to pre-construction condition<br />

Failure of BMP effectiveness following this monitoring will require adaptive<br />

management maintenance to better prevent erosion<br />

Forest Service Manual 2500 Watershed and Air Management<br />

1. Region 5 Supplement 2500-92-4 to FSM 2540 gives guidance on water uses and<br />

developments. This supplement is not applicable, no withdrawal of surface or<br />

groundwater<br />

2. Region 5 Supplement 2500-92-2 to FSM 2526 discusses riparian area<br />

management and is fur<strong>the</strong>r defined by The San Bernardino Supplement to 2509.22 –<br />

Soil and Water Conservation Practices Handbook, FSH 2509.22-2005-1.<br />

3. Region 5 Supplement 2500-93-1 to FSM 2530: This supplement is applicable and<br />

has been applied through <strong>the</strong> implementation and use of best management practices<br />

(BMPs) and o<strong>the</strong>r mitigation measures / design criteria. Erosion control is a concern<br />

and is addressed through implementation of an Erosion Control Plan <strong>for</strong> <strong>the</strong> Project.<br />

4. FSM 2543 and 2880 are both draft direction <strong>for</strong> <strong>the</strong> management of groundwater<br />

resources. Manual direction has been applied<br />

All alternatives are consistent because <strong>the</strong>re would be no withdrawal of surface<br />

and/or groundwater<br />

Frank Springer & Associates, Inc. Page 67 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Effects Analysis Methodology<br />

Analysis Area and Spatial/Temporal Boundaries<br />

The analysis area <strong>for</strong> watershed resources includes Hog Lake Road and a 300-foot<br />

buffer. For erosion analysis, effects were analyzed downhill or downstream of <strong>the</strong><br />

<strong>road</strong>.<br />

For purposes of analyzing direct, indirect and cumulative effects, <strong>the</strong> spatial<br />

boundary was <strong>the</strong> Forest boundary, one year was used <strong>for</strong> short-term effects and 20<br />

years was used <strong>for</strong> long-term effects.<br />

Data Sources<br />

In<strong>for</strong>mation on impaired water bodies was obtained from <strong>the</strong> Cali<strong>for</strong>nia Department<br />

of Water Resources website (State of Cali<strong>for</strong>nia, State Water Resources Control<br />

Board, 2005).<br />

Soils within <strong>the</strong> analysis area were mapped and are described in <strong>the</strong> Soil Survey<br />

Geographic (SSURGO) database <strong>for</strong> San Bernardino National Forest Area,<br />

Cali<strong>for</strong>nia CA777 (USDA NRCS 2009) and <strong>the</strong> Western Riverside Area Inventory<br />

CA679 (USDA NRCS 2008). Data <strong>for</strong> a soil survey area includes a tabular<br />

component and a spatial component. The tabular component was imported into a<br />

database <strong>for</strong> querying, reporting and analysis. The spatial component was viewed<br />

and analyzed using a Geographic In<strong>for</strong>mation System (GIS).<br />

Erosion and Runoff Risk Modeling was completed using FS WEPP - Disturbed<br />

WEPP. This is a computer model that allows users to quickly evaluate erosion and<br />

sediment delivery potential from <strong>for</strong>est activities and <strong>road</strong>s. Documentation of <strong>the</strong><br />

model, assumptions and limitations can be found on <strong>the</strong> web site:<br />

http://<strong>for</strong>est.moscowfsl.wsu.edu/fswepp. The modeling illustrates to decision makers<br />

and <strong>the</strong> public various erosion and runoff risks associated with <strong>the</strong> typical soil found<br />

on <strong>the</strong> <strong>for</strong>est. In general as you increase slope, increase traffic and decrease<br />

vegetation on sandy soils, erosion will increase. This modeling provides a baseline<br />

to compare alternatives.<br />

Existing Condition<br />

Elevations of <strong>the</strong> Project site range from 4,045 feet at Bautista Road to 4,720 feet<br />

above mean sea level at <strong>the</strong> Project’s terminus on <strong>the</strong> Ramona Reservation.<br />

Detailed soil surveys were conducted <strong>for</strong> <strong>the</strong> Forest area by <strong>the</strong> U.S. Department of<br />

Agriculture, Natural Resources Conservation Service (USDA 2008 and USDA 2009),<br />

and are included as a part of <strong>the</strong> Soil Survey Geographic (SSURGO) database.<br />

Soil types occurring on <strong>the</strong> site of <strong>the</strong> proposed Project are as illustrated on Figure<br />

10, Soils.<br />

Frank Springer & Associates, Inc. Page 68 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Mottsville sandy loam at 2 to 8 percent slopes (MsC) underlies <strong>the</strong> entire Project<br />

area. Mottsville soils are located on alluvial fans, fan remnants and fan aprons.<br />

These soils <strong>for</strong>med in alluvium derived from granitic rocks. Mottsville soils are<br />

excessively drained, have negligible or very low surface runoff and rapid or very<br />

rapid permeability. No effect would be anticipated with respect to expansive soils.<br />

Used mostly <strong>for</strong> grazing, <strong>the</strong> soils may also be used <strong>for</strong> dry-farmed small grain and<br />

irrigated peaches, apples, and alfalfa. Typical vegetation associated with this soil<br />

includes mainly big sagebrush, antelope bitterbrush, Anderson's peachbrush, and<br />

needlegrasses.<br />

While sandy loam soils may not readily compact, <strong>the</strong>y are easily eroded, especially<br />

on a slope or where vegetation has been lost. These sandy soils have a high erosion<br />

risk. Presently existing drainage and erosion problems will be corrected by installing<br />

berms, downdrains and rip-rap energy dissipaters.<br />

Frank Springer & Associates, Inc. Page 69 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Figure 10: Soils<br />

The Ramona Reservation is situated in a unique geological area. The San Jacinto<br />

fault zone (SJFZ) actually runs through <strong>the</strong> length of <strong>the</strong> Reservation. The San<br />

Jacinto fault zone is currently <strong>the</strong> most seismically active fault system in sou<strong>the</strong>rn<br />

Cali<strong>for</strong>nia. Since 1890 at least six earthquakes greater than M6 were associated<br />

with this fault zone (Li and Vernon 1994). Locally, <strong>the</strong> Ramona Reservation is<br />

situated in lower areas of <strong>the</strong> SJFZ with several individual faults occurring on <strong>the</strong><br />

Reservation. As is illustrated in Figure 11, Geology, <strong>the</strong> Project alignment intersects<br />

one lineament and two covered faults.<br />

Gemstone mining operations have been documented in <strong>the</strong> Thomas and Cahuilla<br />

Mountain area (Jahns and Wright, 1951), (Kunz, 1905), (Murdoch and Webb, 1956).<br />

The first discovery of tourmaline gems in Cali<strong>for</strong>nia was made on <strong>the</strong> south slope of<br />

Thomas Mountain in 1872. O<strong>the</strong>r mines in <strong>the</strong> area followed this initial discovery<br />

which produced gem quality quartz, beryl, and kunzite until <strong>the</strong> turn of <strong>the</strong> century.<br />

Kunz (1905) described <strong>the</strong> mines on Thomas Mountain occurring in pegmatite dikes<br />

Frank Springer & Associates, Inc. Page 70 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

as much as fifty feet wide containing multi-colored tourmaline crystals as large as<br />

four inches across. No mines are located on or near <strong>the</strong> Project site, however. One<br />

previous stone quarry is located west of <strong>the</strong> Project alignment, at a point just south<br />

of <strong>the</strong> midpoint. All mining activity is historical, however; <strong>the</strong>re is no mining activity<br />

presently occurring at or near to this location.<br />

Figure 11: Geology<br />

Water Resources<br />

As illustrated in Figure 12, Watersheds and Wilderness Areas, <strong>the</strong> Ramona<br />

Reservation is situated in two watersheds: Santa Margarita and San Jacinto Valley,<br />

each of which occupies approximately half of <strong>the</strong> Reservation. The Santa Margarita<br />

watershed lies within <strong>the</strong> San Diego Basin, and <strong>the</strong> San Jacinto Valley watershed is<br />

in <strong>the</strong> Santa Ana Basin, as delineated by <strong>the</strong> Regional Water Quality Control Boards,<br />

San Diego and Santa Ana Regions. Proposed Action will occur within <strong>the</strong> San<br />

Jacinto Valley watershed. The Reservation lies in <strong>the</strong> Bautista hydrologic subarea,<br />

which drains nor<strong>the</strong>ast from Cahuilla Mountain and southwest from Thomas<br />

Mountain at Tripp Flats. The San Jacinto Valley watershed drains east to Canyon<br />

Lake and Lake Elsinore (TMDL 303 listed water bodies).<br />

Frank Springer & Associates, Inc. Page 71 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

The Santa Ana Regional Water Quality Control Board regards every land owner in<br />

<strong>the</strong> watershed to be a contributing agent to <strong>the</strong> water quality of <strong>the</strong>se <strong>lake</strong>s. Although<br />

Bautista Creek is not listed on <strong>the</strong> State's 303(d) list of impaired water bodies, <strong>the</strong><br />

Proposed Action will take steps to ensure that sedimentation (which in turn affects<br />

nitrogen and phosphorus) movement in <strong>the</strong> watershed is not negatively affected by<br />

<strong>the</strong> Proposed Action.<br />

Surface water runoff is derived from precipitation in surrounding mountains and<br />

springs with minor perennial surface flow. On <strong>the</strong> Ramona Reservation, <strong>the</strong> primary<br />

source of water supply to <strong>the</strong> groundwater basin appears to be natural recharge from<br />

precipitation; <strong>the</strong>re are no irrigation returned flows and artificial recharge at <strong>the</strong> time<br />

of this writing.<br />

There are no federally-delineated wetlands on or in <strong>the</strong> immediate vicinity of <strong>the</strong><br />

Project area. The field surveys conducted by L & L Environmental Inc. during <strong>the</strong><br />

preparation of <strong>the</strong> Biological Assessment <strong>for</strong> this <strong>project</strong> confirmed that <strong>the</strong>re were<br />

no flood plains located along <strong>the</strong> proposed <strong>project</strong> alignment that could be impacted.<br />

A portion of Bautista Creek has been designated a Wild and Scenic River. The<br />

portion of <strong>the</strong> Creek that is designated comes within 0.25 miles of <strong>the</strong> Project area.<br />

The climate in <strong>the</strong> Anza region is hot to temperate and sub-humid, and water is a<br />

critical resource. Average rainfall in <strong>the</strong> area is approximately 22 inches per year<br />

(Pryde 1979). Wide temperature fluctuations are characteristic of <strong>the</strong> area, with <strong>the</strong><br />

possibility of snow during winter months and temperatures exceeding 100 °F in<br />

summer. The mean annual temperature <strong>for</strong> <strong>the</strong> San Jacinto foothills is<br />

approximately 55 °F. Average annual evapotranspiration is approximately 10 inches<br />

(CDWR, 1975).<br />

A single mapped intermittent blueline stream crosses <strong>the</strong> <strong>road</strong> alignment. Two o<strong>the</strong>r<br />

small drainages are <strong>for</strong>med along <strong>the</strong> <strong>road</strong> alignment and show connectivity to <strong>the</strong><br />

mapped blueline system of <strong>the</strong> area. Although drainages fall within <strong>the</strong> impact area<br />

<strong>the</strong>se are dry drainages with little to no riparian vegetation.<br />

Two small manmade ponding/percolation areas were observed by L&L<br />

Environmental, Inc. during <strong>the</strong> biological survey, but only one (near <strong>the</strong> mapped<br />

blueline) falls within <strong>the</strong> planned impact zone. No riparian, aquatic or vernal pool<br />

habitat occurred at this ponding location or within <strong>the</strong> drainages on <strong>the</strong> Project site.<br />

Nor were any naturally occurring vernal pools suitable <strong>for</strong> occupation by fairy shrimp<br />

were observed during <strong>the</strong> survey.<br />

Direct and Indirect Effects<br />

No Action:<br />

For <strong>the</strong> No Action Alternative, it is expected that all direct and indirect impacts on soil<br />

and water resources would remain unchanged from current condition. Channeling<br />

Frank Springer & Associates, Inc. Page 72 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

along <strong>the</strong> <strong>road</strong>way already occurs and dirt <strong>road</strong>s are known to produce fine sediment<br />

in streams.<br />

Proposed Action:<br />

For <strong>the</strong> Proposed Action alternative, generalized impacts to jurisdictional drainages<br />

would be expected as a result of equipment use, soil disturbance and construction of<br />

<strong>the</strong> box culvert. These include an increase in erosion and sedimentation as well as<br />

<strong>the</strong> potential <strong>for</strong> <strong>the</strong> discharge of hazardous materials. Channeling along <strong>the</strong><br />

<strong>road</strong>way already occurs and dirt <strong>road</strong>s are known to produce fine sediment in<br />

streams. Construction of <strong>the</strong> <strong>road</strong> could result in increased erosion and<br />

sedimentation with disturbed soils and release hazardous materials from heavy<br />

equipment into <strong>the</strong> streambed.<br />

The proposed action includes <strong>the</strong> use of a culvert with sufficient size and capacity to<br />

pass <strong>the</strong> flows and associated debris from a 25-year return interval storm. While <strong>the</strong><br />

Forest’s Land Management Plan requires sufficient size to accommodate a 50-year<br />

storm, <strong>the</strong> <strong>project</strong> as designed is consistent with BIA standards. As this <strong>project</strong> is a<br />

BIA proposal and <strong>the</strong> <strong>road</strong> will be brought into <strong>the</strong> BIA Transportation System, with<br />

<strong>the</strong> BIA assuming responsibility <strong>for</strong> <strong>road</strong> maintenance, <strong>the</strong> Forest proposes to allow<br />

a site specific amendment to <strong>the</strong> Forest Plan in order to accommodate <strong>the</strong> BIA.<br />

Direct effects associated with implementation of <strong>the</strong> Proposed Action are estimated<br />

as follows: <strong>for</strong> <strong>the</strong> blueline (BL), federal/ACOE 3,977 sf., state/CDFG 6,099 sf.;<br />

drainage 1, federal /ACOE 170 sf., state/CDFG 170 sf; and drainage 14,<br />

federal/ACOE 140 sf., state/CDFG 160 sf. Total impacts are estimated at 4,288 sf<br />

(0.098 acres) federal/ACOE and 6,429 sf (0.148 acres) state/CDFG jurisdictional<br />

area.<br />

Indirect effects associated with implementation of <strong>the</strong> Proposed Action alternative<br />

include impacts resulting from earthmoving or o<strong>the</strong>r construction activities that could<br />

result in discharge of hazardous materials, silt, debris, or excessive erosion into<br />

waters of <strong>the</strong> U.S. during Project construction.<br />

Direct effects associated with <strong>the</strong> smaller BIA 25-year culvert design, ra<strong>the</strong>r than a<br />

50-year design, could include debris plugging <strong>the</strong> culvert during storm events that<br />

exceed <strong>the</strong> capacity of <strong>the</strong> 25-year culvert. Water could be <strong>for</strong>ced out of <strong>the</strong> existing<br />

channel and could erode <strong>the</strong> embankments or cause <strong>the</strong> loss of <strong>the</strong> <strong>road</strong> structure.<br />

Indirect effects include that <strong>the</strong> loss of <strong>the</strong> <strong>road</strong> could cause access to <strong>the</strong><br />

Reservation to be limited to o<strong>the</strong>r, longer routes.<br />

Frank Springer & Associates, Inc. Page 73 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Figure 12: Watersheds and Wilderness Areas<br />

Frank Springer & Associates, Inc. Page 74 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

Figure 13: Jurisdictional Drainages<br />

L & L Environmental, Inc., 2009<br />

Vehicle use increases erosion rates and sedimentation through detachment,<br />

abrasion and changes to <strong>the</strong> <strong>road</strong> surface, making <strong>the</strong> local sandy and cohesionless<br />

soils susceptible to transport. Four-wheeled vehicles and motorcycles apply a shear<br />

stress parallel to <strong>the</strong> soil surface and a compression stress perpendicular to <strong>the</strong><br />

surface. These stresses are most destructive on uphill route segments, on curves or<br />

route segments in which <strong>the</strong> tires may spin. Erosion and sedimentation will be<br />

prevented through <strong>the</strong> implementation of an Erosion Prevention Plan <strong>for</strong> <strong>the</strong> Project.<br />

In order to address The Santa Ana Regional Water Quality Control Board’s<br />

requirement to demonstrate how <strong>the</strong> Proposed Action would affect sedimentation<br />

movement in <strong>the</strong> watershed, <strong>the</strong> WEPP model<br />

(http://<strong>for</strong>est.moscowfsl.wsu.edu/fswepp/) was used to generate estimates of<br />

erosion. Using <strong>the</strong> WEPP model <strong>the</strong> amount of erosion generated was calculated <strong>for</strong><br />

Hog Lake Road at various locations as an unpaved <strong>road</strong> (current condition), and<br />

Frank Springer & Associates, Inc. Page 75 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

those amounts were compared to <strong>the</strong> amount of erosion generated <strong>for</strong> Hog Lake<br />

Road as a paved <strong>road</strong> (condition after Proposed Action):<br />

An unpaved <strong>road</strong> 24’ wide at 94+77 to 84+77 yielded 1,155.63 lb of <strong>road</strong><br />

prism erosion and 679.96 lbs of sediment leaving buffer.<br />

At 84+77 to 74+77, an unpaved <strong>road</strong> 24’ wide yielded 1,386.99 lb of <strong>road</strong><br />

prism erosion and 850.06 lbs of sediment leaving buffer.<br />

At 74+77 to 64+77, an unpaved <strong>road</strong> 24’ wide yielded 1,397.17 lb of <strong>road</strong><br />

prism erosion and 852.71 lbs of sediment leaving buffer.<br />

At 64+77 to 54+77, an unpaved <strong>road</strong> 24’ wide yielded 1,544.53 lb of <strong>road</strong><br />

prism erosion and 950.69 lbs of sediment leaving buffer.<br />

At 54+77 to 44+77, an unpaved <strong>road</strong> 24’ wide yielded 1,397.17 lb of <strong>road</strong><br />

prism erosion and 852.71 lbs of sediment leaving buffer.<br />

At 44+77 to 34+77, an unpaved <strong>road</strong> 24’ wide yielded 1,559.57 lb of <strong>road</strong><br />

prism erosion and 954.76 lbs of sediment leaving buffer.<br />

At 24+77 to 14+77, an unpaved <strong>road</strong> 24’ wide yielded 1,096.78 lb of <strong>road</strong><br />

prism erosion and 612.56 lbs of sediment leaving buffer.<br />

At 14+77 to 4+77, an unpaved <strong>road</strong> 24’ wide yielded 372.92 lb of <strong>road</strong> prism<br />

erosion and 188.37 lbs of sediment leaving buffer.<br />

At all of <strong>the</strong> above locations, a paved <strong>road</strong> 24’ wide yielded 0 lb of <strong>road</strong> prism<br />

erosion and 0 lbs of sediment leaving buffer. Clearly, paving <strong>the</strong> <strong>road</strong> will greatly<br />

reduce <strong>the</strong> quantity of sediment entering Canyon Lake/Lake Elsinore (TMDL 303<br />

listed water bodies). Although runoff would increase erosion with a paved <strong>road</strong>, <strong>the</strong><br />

implementation of mitigation measures/design features should reduce <strong>the</strong> amount of<br />

erosion to a level that is less than significant.<br />

For <strong>the</strong> Proposed Action, <strong>the</strong> Project would reduce federal/ACOE jurisdictional area<br />

by an additional 4,288 sf (0.098 acres), and state/CDFG jurisdictional area by an<br />

additional 6,429 sf (0.148 acres); however, <strong>the</strong>se losses will be made up through <strong>the</strong><br />

purchase of at least 0.15 acres of approved mitigation bank credit.<br />

If <strong>the</strong> Proposed Action is implemented with mitigation measures / design criteria<br />

employed, impacts to jurisdictional drainages and Canyon <strong>lake</strong>/Lake Elsinore and<br />

downstream in <strong>the</strong> watershed if <strong>the</strong> Proposed Action was implemented would be<br />

reduced to being less than significant.<br />

Cumulative Effects<br />

Projects and general development within <strong>the</strong> Forest, District and <strong>the</strong> Riverside<br />

Extended Mountain Area Plan (REMAP) area outlined in <strong>the</strong> Riverside County<br />

Frank Springer & Associates, Inc. Page 76 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

General Plan (RCGP) and Multiple Species Habitat Conservation Plan (MSHCP),<br />

and private land development <strong>project</strong>s were considered when determining<br />

cumulative impacts, and included fuel reduction <strong>project</strong>s, grazing <strong>project</strong>s,<br />

recreational use, designated wilderness areas and Wild and Scenic Rivers in <strong>the</strong><br />

vicinity, <strong>road</strong> maintenance activities, and future planned commercial enterprises on<br />

<strong>the</strong> Ramona Reservation. These <strong>project</strong>s and <strong>the</strong>ir impacts to <strong>the</strong> environment in <strong>the</strong><br />

vicinity of <strong>the</strong> proposed Project site are described in detail in <strong>the</strong> Biological<br />

Assessment carried out <strong>for</strong> this <strong>project</strong> (L & L Environmental, Inc., 2009).<br />

No Action:<br />

The No Action Alternative is expected to over time contribute much more to <strong>the</strong><br />

negative cumulative impacts of jurisdictional drainages in <strong>the</strong> area due to <strong>the</strong><br />

continued erosion and sedimentation originating from <strong>the</strong> unpaved <strong>road</strong>.<br />

Proposed Action:<br />

Under <strong>the</strong> Proposed Action construction activities are expected to contribute slightly<br />

more to <strong>the</strong> cumulative effects of jurisdictional drainage impacts in <strong>the</strong> area, but after<br />

construction is complete <strong>the</strong> paved <strong>road</strong> is expected to contribute far less to area<br />

impacts as erosion and sedimentation from a paved <strong>road</strong> will be far less than that<br />

from an unpaved <strong>road</strong>. Energy dissipaters and improved drainage features will<br />

decrease erosion and sedimentation originating from storm water flow.<br />

Chapter 4 - Consultation and Communication<br />

Reservation Transportation Authority (RTA)<br />

The Ramona band of Cahuilla Indians<br />

USDA Forest Service<br />

Frank Springer & Associates, Inc.<br />

L & L Environmental, Inc<br />

US Fish & Wildlife Service (USFWS)<br />

Bureau of Indian Affairs<br />

Mooney & Associates, Inc.<br />

Frank Springer & Associates, Inc. Page 77 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

References<br />

Cali<strong>for</strong>nia Air Resources Board (CARB). 2006. http://www.arb.ga.gov.<br />

CDWR (Cali<strong>for</strong>nia Department of Water Resources). 1975. Cali<strong>for</strong>nia's Groundwater:<br />

Bulletin 118, 135 pp.<br />

CARB (Cali<strong>for</strong>nia Air Resources Board). 2009. Area Designation Maps, State and<br />

National. http://www.arb.ca.gov/desig/adm/adm.htm#state<br />

Holland, R. F. 1986. Preliminary descriptions of <strong>the</strong> terrestrial natural communities<br />

of Cali<strong>for</strong>nia. Nongame-Heritage Program, Cali<strong>for</strong>nia Dept. Fish and Game. 156 pp.<br />

Jahns, R. H., and Wright, L. A. 1951. Gem and lithium-bearing pegmatites of <strong>the</strong><br />

Pala district, San Diego County, Cali<strong>for</strong>nia: Cali<strong>for</strong>nia Division of Mines Special<br />

Report 7-A, 70 pp.<br />

Kunz, G. F. 1905. Gems, Jewelers' Materials and Ornamental Stones of Cali<strong>for</strong>nia.<br />

Cali<strong>for</strong>nia Minerals Bureau Bulletin 37, 171 pp.<br />

L & L Environmental, Inc. 2009. Biological Evaluation/Assessment <strong>for</strong> Plants and<br />

Animals, Botany and Wildlife Report, Management Indicator Species Report, and<br />

Weed Risk Assessment <strong>for</strong> <strong>the</strong> Ramona Indian Reservation Access Road<br />

Improvement Project. (BE/BA) Unpublished Report.<br />

Li, Y., Vernon, F. 1997. San Jacinto fault zone guided waves: A discrimination <strong>for</strong><br />

recently active fault strands near Anza, Cali<strong>for</strong>nia. J. Geophys. Res.. Vol. 102 (B6),<br />

pp. 11,689-11,701<br />

Mooney, Jones, and Stokes. 2005. Quino Checkerspot Butterfly Survey Report <strong>for</strong><br />

<strong>the</strong> Ramona Indian Reservation, Anza, Cali<strong>for</strong>nia. Unpublished Report<br />

Murdoch, J., and Webb, R. W. 1956. Minerals of Cali<strong>for</strong>nia. Cali<strong>for</strong>nia Division Mines<br />

Bulletin 173, 452 pp.<br />

Pryde, Phillip R. (editor) 1979 San Diego: An Introduction to <strong>the</strong> Region.<br />

Kendall/Hunt Publishing, Dubuque, Iowa.<br />

SCAQMD. 2007. 2007 South Coast Air Quality Management Plan.<br />

http://www.aqmd.gov/aqmp/07aqmp/index.html.<br />

State of Cali<strong>for</strong>nia, State Water Resources Control Board. 2005. Porter-Cologne<br />

WaterQuality Control Act.<br />

http://www.swrcb.ca.gov/laws_regulations/docs/portercologne.pdf Jan 1, 2010<br />

Tierra Environmental Services. 2002. Cultural Resources Inventory <strong>for</strong> <strong>the</strong> Ramona<br />

Road Improvements Project Unpublished Report.<br />

Frank Springer & Associates, Inc. Page 78 of 79 Environmental Assessment


Ramona Hog Lake Road Improvement Project August 2011<br />

USDA Forest Service. V.2009.09.17. WEPP Road: WEPP Interface <strong>for</strong> Predicting<br />

Erosion From Insloped or Outsloped Forest Roads. USDA Forest Service Rocky<br />

Mountain Research Station and San Dimas Technology and Development Center<br />

http://<strong>for</strong>est.moscowfsl.wsu.edu/fswepp.<br />

USDA Forest Service 2006. San Bernardino National Forest Land and Resource<br />

Management Plan. Pacific Southwest Region<br />

http://www.fs.fed.us/r5/sanbernardino/<strong>project</strong>s/lmrp.shtml<br />

USDA Forest Service. LMP 2005. Design Criteria <strong>for</strong> <strong>the</strong> Sou<strong>the</strong>rn Cali<strong>for</strong>nia<br />

National Forests, Part 3, Appendix M: National Forests of Sou<strong>the</strong>rn Cali<strong>for</strong>nia Weed<br />

Management Strategy.<br />

USDA Forest Service. 2000. Noxious Weed ManagementStrategy Sou<strong>the</strong>rn<br />

Cali<strong>for</strong>nia Province, Pacific Southwest Region.<br />

USDA Forest Service. 1991. National Soil Management Handbook FSH 2509, USDA<br />

Forest Service, Washington D.C.<br />

USDA NRCS. 2009. Soil Survey Geographic (SSURGO) database <strong>for</strong> San<br />

Bernardino National Forest Area, Cali<strong>for</strong>nia CA777<br />

http://SoilDataMart.nrcs.usda.gov/<br />

USDA NRCS. 2008. Soil Survey Geographic (SSURGO) database <strong>for</strong> Western<br />

Riverside Area, Cali<strong>for</strong>nia CA679. http://SoilDataMart.nrcs.usda.gov/<br />

U.S. Fish and Wildlife Service. 2008. Endangered and Threatened Wildlife and<br />

Plants; Revised Designation of Critical Habitat <strong>for</strong> <strong>the</strong> Quino Checkerspot Butterfly<br />

(Euphydryas editha quino). Federal Register 73:3327-3373. January 17, 2008.<br />

U.S. Fish and Wildlife Service. 2010. Biological Opinion, Formal Section 7<br />

Consultation on <strong>the</strong> Proposed Ramona Reservation Road Improvement Project,<br />

Riverside County, Cali<strong>for</strong>nia. Unpublished document prepared by <strong>the</strong> Carlsbad Fish<br />

and Wildlife Office. 15 pp.<br />

Frank Springer & Associates, Inc. Page 79 of 79 Environmental Assessment